Waterproof concrete interval pouring construction method for buried sewage treatment plant
The invention discloses a waterproof concrete interval pouring construction method for a buried sewage treatment plant, and belongs to the technical field of concrete pouring. The method is realized through the five steps of plate dividing and pouring, positioning and paying off, steel bar binding and reinforcing, formwork erecting and concrete pouring. According to the method, the pouring sequence of the ultra-long concrete structure is effectively solved, the construction arrangement is reasonable, and the construction progress is accelerated. The concrete interval pouring construction technology is adopted through crack control, the treatment work of the post-cast strip is omitted, the construction procedure is simplified, and the construction progress can be greatly accelerated. An integral structure can be formed as soon as possible by adopting a concrete interval pouring method, long-time exposure of the foundation pit is avoided, the periphery of the foundation pit can be backfilled as soon as possible, horizontal force transmitted by an enclosure structure is effectively transmitted, and displacement of a supporting structure is reduced.
本发明公开了一种地埋式污水处理厂防水混凝土间隔浇筑施工方法,属于混凝土浇筑技术领域。本发明通过板块划分浇筑、定位放线、钢筋绑扎及加固、模板支设和混凝土浇筑这五个步骤予以实现。本发明的方法有效的解决了超长混凝土结构浇筑顺序,合理的施工安排,也加快了施工进度。本发明中通过裂缝控制采用混凝土间隔浇筑施工技术,取消后浇带的处理工作,简化施工程序,可大大加快施工进度。本发明采用混凝土间隔浇筑法可最快地形成整体结构,避免基坑长时间暴露,能够尽快回填基坑周边,有效的传递围护结构传来的水平力,减小支护结构位移。
Waterproof concrete interval pouring construction method for buried sewage treatment plant
The invention discloses a waterproof concrete interval pouring construction method for a buried sewage treatment plant, and belongs to the technical field of concrete pouring. The method is realized through the five steps of plate dividing and pouring, positioning and paying off, steel bar binding and reinforcing, formwork erecting and concrete pouring. According to the method, the pouring sequence of the ultra-long concrete structure is effectively solved, the construction arrangement is reasonable, and the construction progress is accelerated. The concrete interval pouring construction technology is adopted through crack control, the treatment work of the post-cast strip is omitted, the construction procedure is simplified, and the construction progress can be greatly accelerated. An integral structure can be formed as soon as possible by adopting a concrete interval pouring method, long-time exposure of the foundation pit is avoided, the periphery of the foundation pit can be backfilled as soon as possible, horizontal force transmitted by an enclosure structure is effectively transmitted, and displacement of a supporting structure is reduced.
本发明公开了一种地埋式污水处理厂防水混凝土间隔浇筑施工方法,属于混凝土浇筑技术领域。本发明通过板块划分浇筑、定位放线、钢筋绑扎及加固、模板支设和混凝土浇筑这五个步骤予以实现。本发明的方法有效的解决了超长混凝土结构浇筑顺序,合理的施工安排,也加快了施工进度。本发明中通过裂缝控制采用混凝土间隔浇筑施工技术,取消后浇带的处理工作,简化施工程序,可大大加快施工进度。本发明采用混凝土间隔浇筑法可最快地形成整体结构,避免基坑长时间暴露,能够尽快回填基坑周边,有效的传递围护结构传来的水平力,减小支护结构位移。
Waterproof concrete interval pouring construction method for buried sewage treatment plant
一种地埋式污水处理厂防水混凝土间隔浇筑施工方法
DU XIAOWEI (Autor:in) / GONG XIN (Autor:in) / ZHANG QIANG (Autor:in) / DU YOUXIU (Autor:in) / YIN PENG (Autor:in) / NIU CHAO (Autor:in) / ZHANG HAIBO (Autor:in) / CHEN RENSHAN (Autor:in) / GE ZHENGDONG (Autor:in) / SI PENG (Autor:in)
04.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONCRETE POURING GUIDING DEVICE AND CONSTRUCTION METHOD FOR SEWAGE TREATMENT TANK
Europäisches Patentamt | 2022
|Concrete pouring guiding device and construction method for sewage treatment tank
Europäisches Patentamt | 2024
|CONCRETE POURING GUIDING DEVICE AND CONSTRUCTION METHOD FOR SEWAGE TREATMENT TANK
Europäisches Patentamt | 2021
|Concrete pouring flow guide device and sewage treatment pool construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2021
|