Prefabricated fish-scale pit greening system and construction method
The invention relates to a prefabricated assembly type fish-scale pit greening system and a construction method. The prefabricated assembly type fish-scale pit greening system mainly comprises an assembly type fish-scale pit, a shaped base, cartridge anchor rods, a mountain body, sealing plate mortar, a drainage ditch, an iron gauze, sand gravel and the like. During construction, firstly, the fabricated fish-scale pits are manufactured, mountain excavation grooves, horizontal cartridge anchor rod holes and vertical cartridge anchor rod holes are formed in a mountain, after the fabricated fish-scale pits are placed, the horizontal cartridge anchor rods and the vertical cartridge anchor rods are arranged, greening is planted, and regreening construction is completed. The method has the beneficial effects that according to the prefabricated assembly type construction mode, the assembly type fish-scale pits are firstly manufactured, then the assembly type fish-scale pits are installed on the mountain slope excavation face, the construction quality and the construction efficiency of the fish-scale pits can be improved, and then rapid greening is achieved; the horizontal cartridge anchor rods and the vertical cartridge anchor rods are adopted for three-way tying of the fish-scale pit, and the stability of the assembly type fish-scale pit is improved; the method has good aesthetic landscape value and has good comprehensive benefits.
本发明涉及一种预制装配式鱼鳞坑复绿体系及施工方法,主要包括装配式鱼鳞坑、定型化底座、药卷锚杆、山体、封板砂浆、排水沟、铁丝网、砂砾石等。施工时首先制作装配式鱼鳞坑,并在山体上设置山体开挖槽、水平及竖向药卷锚杆孔,安放预制装配式鱼鳞坑后,设置水平及竖向药卷锚杆后种植绿化完成复绿施工。本发明的有益效果是:预制装配式的施工方式首先进行装配式鱼鳞坑的制作,随后在山坡开挖面上安装,可提高鱼鳞坑的施工质量和施工效率,进而实现快速复绿;采用水平药卷锚杆及竖向药卷锚杆进行鱼鳞坑的三向拉结,提高了装配式鱼鳞坑的稳定性;有较好的美学景观价值,并具有较好的综合效益。
Prefabricated fish-scale pit greening system and construction method
The invention relates to a prefabricated assembly type fish-scale pit greening system and a construction method. The prefabricated assembly type fish-scale pit greening system mainly comprises an assembly type fish-scale pit, a shaped base, cartridge anchor rods, a mountain body, sealing plate mortar, a drainage ditch, an iron gauze, sand gravel and the like. During construction, firstly, the fabricated fish-scale pits are manufactured, mountain excavation grooves, horizontal cartridge anchor rod holes and vertical cartridge anchor rod holes are formed in a mountain, after the fabricated fish-scale pits are placed, the horizontal cartridge anchor rods and the vertical cartridge anchor rods are arranged, greening is planted, and regreening construction is completed. The method has the beneficial effects that according to the prefabricated assembly type construction mode, the assembly type fish-scale pits are firstly manufactured, then the assembly type fish-scale pits are installed on the mountain slope excavation face, the construction quality and the construction efficiency of the fish-scale pits can be improved, and then rapid greening is achieved; the horizontal cartridge anchor rods and the vertical cartridge anchor rods are adopted for three-way tying of the fish-scale pit, and the stability of the assembly type fish-scale pit is improved; the method has good aesthetic landscape value and has good comprehensive benefits.
本发明涉及一种预制装配式鱼鳞坑复绿体系及施工方法,主要包括装配式鱼鳞坑、定型化底座、药卷锚杆、山体、封板砂浆、排水沟、铁丝网、砂砾石等。施工时首先制作装配式鱼鳞坑,并在山体上设置山体开挖槽、水平及竖向药卷锚杆孔,安放预制装配式鱼鳞坑后,设置水平及竖向药卷锚杆后种植绿化完成复绿施工。本发明的有益效果是:预制装配式的施工方式首先进行装配式鱼鳞坑的制作,随后在山坡开挖面上安装,可提高鱼鳞坑的施工质量和施工效率,进而实现快速复绿;采用水平药卷锚杆及竖向药卷锚杆进行鱼鳞坑的三向拉结,提高了装配式鱼鳞坑的稳定性;有较好的美学景观价值,并具有较好的综合效益。
Prefabricated fish-scale pit greening system and construction method
预制装配式鱼鳞坑复绿体系及施工方法
QIAO WENKAI (Autor:in) / LI XIAO (Autor:in)
04.04.2023
Patent
Elektronische Ressource
Chinesisch
Steep terrain fish-scale pit greening system and construction method
Europäisches Patentamt | 2023
|The Integration of Prefabricated Construction and Vertical Greening
Springer Verlag | 2024
|Prefabricated greening counterfort type retaining wall and construction method thereof