Construction method for paving curve platform of railway station
The invention relates to railway construction, in particular to a railway station curve platform paving construction method, which is used for solving the problems of inaccurate platform cap stone paving and low efficiency, and comprises a curve platform, the curve platform comprises a platform foundation, and a mortar layer, platform cap stone, blind road cap stone and a stone plate are paved on the platform foundation. A rail is arranged between the curve platforms, a laying device is arranged above the rail in a sliding mode, and the construction method comprises the steps that S1, platform foundations are built on the two sides of the rail through formworks; s2, the platform foundation surface is planned and calculated, hat stone laying work is conducted through the laying device, manual laying is reduced, the laying efficiency is improved, the laying device can walk along the bending angle of the platform, the laying device can conduct laying work according to the bending angle of platform construction, the laid hat stones are consistent in height, and the laying efficiency is improved. And a large number of cap stones can be carried, so that the laying quality and efficiency are improved.
本发明涉及铁路施工,用于解决站台铺贴帽石不准确和效率低下的问题,涉及铁路车站曲线站台铺贴施工方法,包括曲线站台,所述曲线站台包括站台地基,所述站台地基的上方铺设有砂浆层、站台帽石、盲道帽石和石板,所述曲线站台之间设置有铁轨,所述铁轨的上方滑动设置有铺设装置,所述施工方法包括:S1、站台地基通过模板建设在铁轨的两侧;S2、对站台地基表面规划计算,本发明通过铺设装置进行帽石的铺设工作,减少人工铺设,提高铺设的效率,铺设装置能够沿着站台弯曲角度进行行走,铺设装置的能够根据站台建设的弯曲角度进行铺设的工作,铺设的帽石高度一致,且能够携带大量的帽石,这样增加铺设的质量和效率。
Construction method for paving curve platform of railway station
The invention relates to railway construction, in particular to a railway station curve platform paving construction method, which is used for solving the problems of inaccurate platform cap stone paving and low efficiency, and comprises a curve platform, the curve platform comprises a platform foundation, and a mortar layer, platform cap stone, blind road cap stone and a stone plate are paved on the platform foundation. A rail is arranged between the curve platforms, a laying device is arranged above the rail in a sliding mode, and the construction method comprises the steps that S1, platform foundations are built on the two sides of the rail through formworks; s2, the platform foundation surface is planned and calculated, hat stone laying work is conducted through the laying device, manual laying is reduced, the laying efficiency is improved, the laying device can walk along the bending angle of the platform, the laying device can conduct laying work according to the bending angle of platform construction, the laid hat stones are consistent in height, and the laying efficiency is improved. And a large number of cap stones can be carried, so that the laying quality and efficiency are improved.
本发明涉及铁路施工,用于解决站台铺贴帽石不准确和效率低下的问题,涉及铁路车站曲线站台铺贴施工方法,包括曲线站台,所述曲线站台包括站台地基,所述站台地基的上方铺设有砂浆层、站台帽石、盲道帽石和石板,所述曲线站台之间设置有铁轨,所述铁轨的上方滑动设置有铺设装置,所述施工方法包括:S1、站台地基通过模板建设在铁轨的两侧;S2、对站台地基表面规划计算,本发明通过铺设装置进行帽石的铺设工作,减少人工铺设,提高铺设的效率,铺设装置能够沿着站台弯曲角度进行行走,铺设装置的能够根据站台建设的弯曲角度进行铺设的工作,铺设的帽石高度一致,且能够携带大量的帽石,这样增加铺设的质量和效率。
Construction method for paving curve platform of railway station
铁路车站曲线站台铺贴施工方法
LIU XIAOYONG (Autor:in) / LIN LIANYUAN (Autor:in) / XU KUN (Autor:in) / WANG JIAN (Autor:in) / XIA TINGJUN (Autor:in) / HUANG HETAO (Autor:in) / LI XUECHAO (Autor:in) / JIAN HANG (Autor:in)
04.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
3D paving construction method for small-radius variable-amplitude curve