Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of green and energy-saving fabricated building wall
The invention belongs to the technical field of building wall installation, and particularly relates to a construction method of a green and energy-saving type fabricated building wall, which comprises a feeding mechanism, a separating and positioning mechanism, a lifting mechanism, a clamping mechanism and an aligning mechanism, and the specific installation method comprises the following steps: S1, positioning and placing: placing the fabricated building wall on the feeding mechanism and placing the fabricated building wall in order; s2, separating and positioning: a separating and positioning mechanism automatically clamps the forefront fabricated building wall on the feeding mechanism in the S1; s3, active clamping is conducted, specifically, the single fabricated building wall separated in the S2 is lifted to the installation height, and meanwhile, the single fabricated building wall in the S2 is clamped by a clamping mechanism; and S4, fixed-point clamp releasing is conducted, specifically, the alignment mechanism is driven to drive the wall to move close to the mounting point, and after the wall reaches the mounting point, the clamping mechanism loosens. According to the wall body stacking device, the multiple stacked wall bodies are automatically transferred one by one through the separating and positioning mechanism, and the automation degree is improved.
本发明属于建筑墙体安装技术领域,尤其是一种绿色节能型装配式建筑墙体的施工方法,包括送料机构、分离定位机构、提升机构、夹持机构、对位机构,安装的具体方法如下:S1、定位放置——将装配式建筑墙体置放到送料机构上并摆放整齐;S2、分离定位——分离定位机构自动将S1中送料机构上位于最前方的一个装配式建筑墙体夹住;S3、主动夹持——将S2中分离出的单个装配式建筑墙体提升至安装高度,同时夹持机构对S2中的单个装配式建筑墙体进行夹持;S4、定点脱夹——驱使对位机构带动墙体靠近安装点移动,达到安装点后,夹持机构松开。本发明中,通过分离定位机构自动将多个堆放好的墙体进行逐个转移,提高自动化程度。
Construction method of green and energy-saving fabricated building wall
The invention belongs to the technical field of building wall installation, and particularly relates to a construction method of a green and energy-saving type fabricated building wall, which comprises a feeding mechanism, a separating and positioning mechanism, a lifting mechanism, a clamping mechanism and an aligning mechanism, and the specific installation method comprises the following steps: S1, positioning and placing: placing the fabricated building wall on the feeding mechanism and placing the fabricated building wall in order; s2, separating and positioning: a separating and positioning mechanism automatically clamps the forefront fabricated building wall on the feeding mechanism in the S1; s3, active clamping is conducted, specifically, the single fabricated building wall separated in the S2 is lifted to the installation height, and meanwhile, the single fabricated building wall in the S2 is clamped by a clamping mechanism; and S4, fixed-point clamp releasing is conducted, specifically, the alignment mechanism is driven to drive the wall to move close to the mounting point, and after the wall reaches the mounting point, the clamping mechanism loosens. According to the wall body stacking device, the multiple stacked wall bodies are automatically transferred one by one through the separating and positioning mechanism, and the automation degree is improved.
本发明属于建筑墙体安装技术领域,尤其是一种绿色节能型装配式建筑墙体的施工方法,包括送料机构、分离定位机构、提升机构、夹持机构、对位机构,安装的具体方法如下:S1、定位放置——将装配式建筑墙体置放到送料机构上并摆放整齐;S2、分离定位——分离定位机构自动将S1中送料机构上位于最前方的一个装配式建筑墙体夹住;S3、主动夹持——将S2中分离出的单个装配式建筑墙体提升至安装高度,同时夹持机构对S2中的单个装配式建筑墙体进行夹持;S4、定点脱夹——驱使对位机构带动墙体靠近安装点移动,达到安装点后,夹持机构松开。本发明中,通过分离定位机构自动将多个堆放好的墙体进行逐个转移,提高自动化程度。
Construction method of green and energy-saving fabricated building wall
一种绿色节能型装配式建筑墙体的施工方法
ZHANG LIANTING (Autor:in) / CHEN CHAOYANG (Autor:in) / ZHANG JIAXUE (Autor:in)
04.04.2023
Patent
Elektronische Ressource
Chinesisch
Green energy-saving fabricated building wall and construction method thereof
Europäisches Patentamt | 2022
|Green energy-saving fabricated building wall component
Europäisches Patentamt | 2024
|