Prestress intelligent tensioning equipment and method
The invention relates to intelligent prestress tensioning equipment and method.The tensioning equipment comprises a supporting frame used for installing a tensioning jack and an AGV moving chassis fixed to the bottom of the supporting frame, a three-axis moving assembly is arranged on the supporting frame, and an installing platform is fixed to the moving tail end of the three-axis moving assembly; the tensioning jack is installed on the installation platform, an automatic bundling piece used for locking the tensioning jack is arranged in the installation platform, the automatic bundling piece is connected to the installation platform through an angle adjusting piece, the angle adjusting piece is fixed to the automatic bundling piece, and an automatic tensioning machine and a three-axis moving power device are arranged on the supporting frame. The automatic tensioning machine is electrically connected with the tensioning jack, and the three-axis moving power device is electrically connected with the three-axis moving assembly. The technical problems that in the prior art, manual tensioning construction is low in safety and efficiency are solved. Compared with a manual tensioning construction method, the situation that the prestressed steel strand pops up to hurt people in the tensioning process is avoided.
本发明涉及一种预应力智能张拉设备及方法,张拉设备包括用于安装张拉千斤顶的支撑框架以及固定于该支撑框架底部的AGV移动底盘,支撑框架上设有三轴移动组件,三轴移动组件的移动末端固定有安装平台,张拉千斤顶安装于安装平台上,安装平台内设有用于锁定张拉千斤顶的自动梱紧件,自动梱紧件通过角度调节件连接至安装平台上,角度调节件与自动捆紧件固定,支撑框架上设有自动张拉机和三轴移动动力装置,自动张拉机与张拉千斤顶电连接,三轴移动动力装置与三轴移动组件电连接。本发明解决了现有技术中人工进行张拉施工安全性和效率低的技术问题。本发明相对于人工张拉施工的方法,避免了张拉过程中预应力钢绞线弹出伤人的情况发生。
Prestress intelligent tensioning equipment and method
The invention relates to intelligent prestress tensioning equipment and method.The tensioning equipment comprises a supporting frame used for installing a tensioning jack and an AGV moving chassis fixed to the bottom of the supporting frame, a three-axis moving assembly is arranged on the supporting frame, and an installing platform is fixed to the moving tail end of the three-axis moving assembly; the tensioning jack is installed on the installation platform, an automatic bundling piece used for locking the tensioning jack is arranged in the installation platform, the automatic bundling piece is connected to the installation platform through an angle adjusting piece, the angle adjusting piece is fixed to the automatic bundling piece, and an automatic tensioning machine and a three-axis moving power device are arranged on the supporting frame. The automatic tensioning machine is electrically connected with the tensioning jack, and the three-axis moving power device is electrically connected with the three-axis moving assembly. The technical problems that in the prior art, manual tensioning construction is low in safety and efficiency are solved. Compared with a manual tensioning construction method, the situation that the prestressed steel strand pops up to hurt people in the tensioning process is avoided.
本发明涉及一种预应力智能张拉设备及方法,张拉设备包括用于安装张拉千斤顶的支撑框架以及固定于该支撑框架底部的AGV移动底盘,支撑框架上设有三轴移动组件,三轴移动组件的移动末端固定有安装平台,张拉千斤顶安装于安装平台上,安装平台内设有用于锁定张拉千斤顶的自动梱紧件,自动梱紧件通过角度调节件连接至安装平台上,角度调节件与自动捆紧件固定,支撑框架上设有自动张拉机和三轴移动动力装置,自动张拉机与张拉千斤顶电连接,三轴移动动力装置与三轴移动组件电连接。本发明解决了现有技术中人工进行张拉施工安全性和效率低的技术问题。本发明相对于人工张拉施工的方法,避免了张拉过程中预应力钢绞线弹出伤人的情况发生。
Prestress intelligent tensioning equipment and method
预应力智能张拉设备及方法
WANG JUTENG (Autor:in) / SU JINGGAO (Autor:in) / CHEN HAO (Autor:in) / OUYANG LULONG (Autor:in) / ZHAO JIANCHUN (Autor:in)
04.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste