Prefabricated thin-wall pipe pile composite pile foundation structure penetrating through karst cave and construction method of prefabricated thin-wall pipe pile composite pile foundation structure
The invention discloses a prefabricated thin-wall pipe pile composite pile foundation structure penetrating through a karst cave and a construction method of the prefabricated thin-wall pipe pile composite pile foundation structure penetrating through the karst cave environment, and belongs to the technical field of pile foundation construction. The concrete is poured in the prefabricated thin-wall concrete pipe pile, so that the concrete cannot be lost and enter the karst cave cavity, and material waste is avoided; a gap between the outer wall of the prefabricated thin-wall concrete pipe pile and the hole wall of the punching pile and the underlying bedrock section are filled with cement slurry, the upper covering soil layer and the limestone layer section are filled with well-graded filler firstly, then the cement slurry is injected, finally, a reinforcement cage is put into the prefabricated thin-wall concrete pipe pile, pile body concrete is poured, and the pile is formed through curing. The construction process is simple and has the advantages of reducing cost and operation difficulty and the like, the phenomena of material waste, pouring concrete loss and the like are avoided, and the bearing capacity stability and the forming quality of the pile foundation are guaranteed.
本发明公开了一种穿越溶洞的预制薄壁管桩复合桩基础结构及其施工方法,属于桩基施工技术领域,本发明的穿越溶洞环境预制薄壁管桩复合桩基础可以实现在地下溶洞环境地基中进行桩基施工时,在预制薄壁混凝土管桩内浇筑混凝土不会使混凝土流失进入所述溶洞空腔中,以免造成物料浪费;以及在所述预制薄壁混凝土管桩外壁与所述冲孔桩孔壁间隙,下伏基岩段充填水泥浆,上覆土层和石灰岩层段先填充级配良好的填料再注入水泥浆液,最后所述预制薄壁混凝土管桩中下放钢筋笼,浇筑桩身混凝土,养护成桩。本发明施工工艺简单,具有降低成本,降低操作难度等优点,避免出现物料浪费、浇筑混凝土流失等现象,保证了桩基承载力稳定性和成型质量。
Prefabricated thin-wall pipe pile composite pile foundation structure penetrating through karst cave and construction method of prefabricated thin-wall pipe pile composite pile foundation structure
The invention discloses a prefabricated thin-wall pipe pile composite pile foundation structure penetrating through a karst cave and a construction method of the prefabricated thin-wall pipe pile composite pile foundation structure penetrating through the karst cave environment, and belongs to the technical field of pile foundation construction. The concrete is poured in the prefabricated thin-wall concrete pipe pile, so that the concrete cannot be lost and enter the karst cave cavity, and material waste is avoided; a gap between the outer wall of the prefabricated thin-wall concrete pipe pile and the hole wall of the punching pile and the underlying bedrock section are filled with cement slurry, the upper covering soil layer and the limestone layer section are filled with well-graded filler firstly, then the cement slurry is injected, finally, a reinforcement cage is put into the prefabricated thin-wall concrete pipe pile, pile body concrete is poured, and the pile is formed through curing. The construction process is simple and has the advantages of reducing cost and operation difficulty and the like, the phenomena of material waste, pouring concrete loss and the like are avoided, and the bearing capacity stability and the forming quality of the pile foundation are guaranteed.
本发明公开了一种穿越溶洞的预制薄壁管桩复合桩基础结构及其施工方法,属于桩基施工技术领域,本发明的穿越溶洞环境预制薄壁管桩复合桩基础可以实现在地下溶洞环境地基中进行桩基施工时,在预制薄壁混凝土管桩内浇筑混凝土不会使混凝土流失进入所述溶洞空腔中,以免造成物料浪费;以及在所述预制薄壁混凝土管桩外壁与所述冲孔桩孔壁间隙,下伏基岩段充填水泥浆,上覆土层和石灰岩层段先填充级配良好的填料再注入水泥浆液,最后所述预制薄壁混凝土管桩中下放钢筋笼,浇筑桩身混凝土,养护成桩。本发明施工工艺简单,具有降低成本,降低操作难度等优点,避免出现物料浪费、浇筑混凝土流失等现象,保证了桩基承载力稳定性和成型质量。
Prefabricated thin-wall pipe pile composite pile foundation structure penetrating through karst cave and construction method of prefabricated thin-wall pipe pile composite pile foundation structure
一种穿越溶洞的预制薄壁管桩复合桩基础结构及其施工方法
YANG BAI (Autor:in) / SHI QINGYE (Autor:in) / QIN CHAO (Autor:in) / XU PENG (Autor:in) / CHENG FENG (Autor:in) / ZHAO SHANSHAN (Autor:in) / WU DI (Autor:in) / CHEN AIJUN (Autor:in) / CHEN JUNHUA (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Electrolytic-desaturation prefabricated pipe pile composite pile foundation and using method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Karst cave penetrating pile foundation structure and construction method thereof
Europäisches Patentamt | 2023
|Prefabricated slab pile composite foundation and construction method
Europäisches Patentamt | 2020
|