Working well and construction method thereof
The invention discloses a working well and a construction method of the working well, and relates to the technical field of underground diaphragm wall construction.The working well comprises a working well body, a plurality of layers of first supporting components are arranged between well walls on the two adjacent sides of the working well body, and the multiple layers of first supporting components are sequentially arranged from top to bottom; a second supporting component is arranged at the position, close to the top, of the working well body, the second supporting component is folded into a ring in the circumferential direction of the well wall of the working well body, the well wall of the working well body is further provided with a mounting base for mounting a pushing device, and a notch is formed in the well wall, directly facing the mounting base, of the working well body. The notch is provided with a steel structure sleeve used for assisting the continuous wall in pushing out the well, a base plate is arranged at the bottom of the working well body, and a sliding rail structure used for assisting the continuous wall in pushing out the well is arranged on the base plate. The working well provided by the embodiment of the invention can be used for incremental launching construction of the fabricated continuous wall and end cast-in-place construction of the fabricated continuous wall after incremental launching is completed.
本发明公开了一种工作井及工作井的施工方法,涉及地下连续墙施工技术领域,包括工作井本体,工作井本体的相邻的两侧井壁之间设置有若干层第一支撑构件,若干层第一支撑构件从上之下依次布置,工作井本体靠近顶部的位置设置有第二支撑构件,第二支撑构件沿工作井本体的井壁周向合拢成环,工作井本体的井壁还设置有供顶推装置安装的安装基座,工作井本体正对安装基座的井壁开设有槽口,槽口设置有用于辅助连续墙顶推出井的钢结构套,工作井本体的底部设置有基底板,基底板上布置用于辅助连续墙顶推出井的滑轨结构。本发明实施例提供的工作井能够用于装配式连续墙的顶推施工以及顶推完毕后的装配式连续墙的端部现浇施工。
Working well and construction method thereof
The invention discloses a working well and a construction method of the working well, and relates to the technical field of underground diaphragm wall construction.The working well comprises a working well body, a plurality of layers of first supporting components are arranged between well walls on the two adjacent sides of the working well body, and the multiple layers of first supporting components are sequentially arranged from top to bottom; a second supporting component is arranged at the position, close to the top, of the working well body, the second supporting component is folded into a ring in the circumferential direction of the well wall of the working well body, the well wall of the working well body is further provided with a mounting base for mounting a pushing device, and a notch is formed in the well wall, directly facing the mounting base, of the working well body. The notch is provided with a steel structure sleeve used for assisting the continuous wall in pushing out the well, a base plate is arranged at the bottom of the working well body, and a sliding rail structure used for assisting the continuous wall in pushing out the well is arranged on the base plate. The working well provided by the embodiment of the invention can be used for incremental launching construction of the fabricated continuous wall and end cast-in-place construction of the fabricated continuous wall after incremental launching is completed.
本发明公开了一种工作井及工作井的施工方法,涉及地下连续墙施工技术领域,包括工作井本体,工作井本体的相邻的两侧井壁之间设置有若干层第一支撑构件,若干层第一支撑构件从上之下依次布置,工作井本体靠近顶部的位置设置有第二支撑构件,第二支撑构件沿工作井本体的井壁周向合拢成环,工作井本体的井壁还设置有供顶推装置安装的安装基座,工作井本体正对安装基座的井壁开设有槽口,槽口设置有用于辅助连续墙顶推出井的钢结构套,工作井本体的底部设置有基底板,基底板上布置用于辅助连续墙顶推出井的滑轨结构。本发明实施例提供的工作井能够用于装配式连续墙的顶推施工以及顶推完毕后的装配式连续墙的端部现浇施工。
Working well and construction method thereof
一种工作井及工作井的施工方法
GONG SHENG (Autor:in) / ZHU GUOCAI (Autor:in) / YE RUICONG (Autor:in) / XU JIAN (Autor:in) / LIU JIE (Autor:in) / YANG SHAOFENG (Autor:in) / LU HUASHI (Autor:in) / HUANG HAO (Autor:in) / LAI DEJI (Autor:in) / ZHENG RUNXIN (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Multi-pipeline shared working well and construction method thereof
Europäisches Patentamt | 2023
|Working well with supporting system and construction method thereof
Europäisches Patentamt | 2021
|Pipe-jacking working well structure and construction method thereof
Europäisches Patentamt | 2021
|Prefabricated assembly type cable working well and construction method thereof
Europäisches Patentamt | 2020
|Rectangular pipe jacking working well structure and construction method thereof
Europäisches Patentamt | 2023
|