Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Early-dismantling aluminum formwork device and early-dismantling aluminum formwork construction method
The invention discloses an early-dismantling aluminum formwork device and an early-dismantling aluminum formwork construction method.The early-dismantling aluminum formwork device comprises a plurality of early-dismantling heads, an early-dismantling aluminum beam set, a locking assembly and a plurality of supporting columns, the early-dismantling aluminum beam set comprises a plurality of early-dismantling aluminum beams, the early-dismantling aluminum beams are connected with a floor formwork through pins, one early-dismantling head is connected between any two adjacent early-dismantling aluminum beams, and the supporting columns are connected with the early-dismantling aluminum beams. The locking assembly comprises a mounting block and a locking strip, the mounting block is arranged at the bottom of the early-dismantling aluminum beam and provided with a first mounting groove, a second mounting groove is formed in the position, corresponding to the first mounting groove, of the early-dismantling head, and the early-dismantling head is spliced with the mounting block so that the first mounting groove and the second mounting groove can communicate to form a strip-shaped groove. The locking bar is mounted in the strip-shaped groove and is connected with the groove wall through a pin so as to fix the early dismounting head and the mounting block; the supporting columns and the early-dismantling heads are consistent in number and are in one-to-one correspondence. The early-dismantling head and the early-dismantling aluminum beam are fixed through cooperation of the locking strip and the strip-shaped groove, the early-dismantling aluminum beam and the early-dismantling head can be quickly unlocked by dismantling the locking strip during dismantling, and the construction efficiency is improved.
本发明公开了一种早拆铝模板装置及早拆铝模板施工方法,包括多个早拆头、早拆铝梁组、锁紧组件及多个支柱,早拆铝梁组包括多个早拆铝梁,早拆铝梁与楼面模板通过销钉连接,任意相邻的两个早拆铝梁之间连接有一个早拆头,锁紧组件包括安装块和锁条,安装块设置在早拆铝梁的底部并开设有第一安装槽,早拆头对应第一安装槽的位置开设有第二安装槽,早拆头与安装块拼接,以将第一安装槽和第二安装槽连通形成条形槽,锁条安装于条形槽内并通过销钉与槽壁连接,以将早拆头和安装块固定;支柱与早拆头数量一致且一一对应。本发明通过锁条与条形槽配合将早拆头与早拆铝梁固定,拆分时拆下锁条即可快速将早拆铝梁和早拆头解锁,提高了施工效率。
Early-dismantling aluminum formwork device and early-dismantling aluminum formwork construction method
The invention discloses an early-dismantling aluminum formwork device and an early-dismantling aluminum formwork construction method.The early-dismantling aluminum formwork device comprises a plurality of early-dismantling heads, an early-dismantling aluminum beam set, a locking assembly and a plurality of supporting columns, the early-dismantling aluminum beam set comprises a plurality of early-dismantling aluminum beams, the early-dismantling aluminum beams are connected with a floor formwork through pins, one early-dismantling head is connected between any two adjacent early-dismantling aluminum beams, and the supporting columns are connected with the early-dismantling aluminum beams. The locking assembly comprises a mounting block and a locking strip, the mounting block is arranged at the bottom of the early-dismantling aluminum beam and provided with a first mounting groove, a second mounting groove is formed in the position, corresponding to the first mounting groove, of the early-dismantling head, and the early-dismantling head is spliced with the mounting block so that the first mounting groove and the second mounting groove can communicate to form a strip-shaped groove. The locking bar is mounted in the strip-shaped groove and is connected with the groove wall through a pin so as to fix the early dismounting head and the mounting block; the supporting columns and the early-dismantling heads are consistent in number and are in one-to-one correspondence. The early-dismantling head and the early-dismantling aluminum beam are fixed through cooperation of the locking strip and the strip-shaped groove, the early-dismantling aluminum beam and the early-dismantling head can be quickly unlocked by dismantling the locking strip during dismantling, and the construction efficiency is improved.
本发明公开了一种早拆铝模板装置及早拆铝模板施工方法,包括多个早拆头、早拆铝梁组、锁紧组件及多个支柱,早拆铝梁组包括多个早拆铝梁,早拆铝梁与楼面模板通过销钉连接,任意相邻的两个早拆铝梁之间连接有一个早拆头,锁紧组件包括安装块和锁条,安装块设置在早拆铝梁的底部并开设有第一安装槽,早拆头对应第一安装槽的位置开设有第二安装槽,早拆头与安装块拼接,以将第一安装槽和第二安装槽连通形成条形槽,锁条安装于条形槽内并通过销钉与槽壁连接,以将早拆头和安装块固定;支柱与早拆头数量一致且一一对应。本发明通过锁条与条形槽配合将早拆头与早拆铝梁固定,拆分时拆下锁条即可快速将早拆铝梁和早拆头解锁,提高了施工效率。
Early-dismantling aluminum formwork device and early-dismantling aluminum formwork construction method
早拆铝模板装置及早拆铝模板施工方法
BAO QIANG (Autor:in) / LI ZHANRONG (Autor:in) / LIU ZHAOCHEN (Autor:in) / SUN YINHAO (Autor:in) / LEE YONG-GIL (Autor:in) / JIANG HAIJUN (Autor:in) / AN XIAOFENG (Autor:in) / CHEN CHANGYONG (Autor:in) / TONG YUYANG (Autor:in) / DING XIAOXIAO (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|