Concrete filled steel tube pouring device for bridge pier engineering
The invention provides a concrete filled steel tube pouring device for bridge pier engineering, and relates to the field of concrete pouring of bridge pier engineering, the concrete filled steel tube pouring device comprises a vibrating unit, two sides of the vibrating unit are connected with handles through screws, the bottom of the vibrating unit is provided with a vibrating column, the bottom of the vibrating column is connected with a vibrating head, and the exterior of the top end of the vibrating column is provided with a bayonet. A first ferrule is clamped in the bayonet, a second ferrule is clamped at the bottom, close to the first ferrule, in the bayonet, the concrete in the steel pipe can be vibrated through a vibrating head when a vibrating unit is started, the first ferrule and the second ferrule are fixed through the bayonet, and the first ferrule is used for mounting a fixing structure to ensure that the steel pipe cannot topple during vibrating; the second ferrule is used for fixing the discharging structure, and the discharging structure and the vibrating structure are combined into a whole through the up-down design of the first ferrule and the second ferrule.
本发明提供一种桥墩工程用钢管混凝土浇筑装置,涉及桥墩工程混凝土浇筑领域,包括振捣机组,振捣机组的两侧均螺钉连接有把手,振捣机组的底部安装有振捣柱,振捣柱的底部连接有振捣头,振捣柱顶端的外部开设有卡口,卡口内卡接有第一套圈,卡口内靠近第一套圈的底部卡接有第二套圈,振捣机组启动会通过振捣头对钢管内部的混凝土进行振捣,通过卡口固定住第一套圈和第二套圈,第一套圈用于安装固定结构,确保在振捣时钢管不会倾倒,第二套圈用以固定下料结构,通过第一套圈和第二套圈的上下位设计将下料结构和振捣结构结合成一体。
Concrete filled steel tube pouring device for bridge pier engineering
The invention provides a concrete filled steel tube pouring device for bridge pier engineering, and relates to the field of concrete pouring of bridge pier engineering, the concrete filled steel tube pouring device comprises a vibrating unit, two sides of the vibrating unit are connected with handles through screws, the bottom of the vibrating unit is provided with a vibrating column, the bottom of the vibrating column is connected with a vibrating head, and the exterior of the top end of the vibrating column is provided with a bayonet. A first ferrule is clamped in the bayonet, a second ferrule is clamped at the bottom, close to the first ferrule, in the bayonet, the concrete in the steel pipe can be vibrated through a vibrating head when a vibrating unit is started, the first ferrule and the second ferrule are fixed through the bayonet, and the first ferrule is used for mounting a fixing structure to ensure that the steel pipe cannot topple during vibrating; the second ferrule is used for fixing the discharging structure, and the discharging structure and the vibrating structure are combined into a whole through the up-down design of the first ferrule and the second ferrule.
本发明提供一种桥墩工程用钢管混凝土浇筑装置,涉及桥墩工程混凝土浇筑领域,包括振捣机组,振捣机组的两侧均螺钉连接有把手,振捣机组的底部安装有振捣柱,振捣柱的底部连接有振捣头,振捣柱顶端的外部开设有卡口,卡口内卡接有第一套圈,卡口内靠近第一套圈的底部卡接有第二套圈,振捣机组启动会通过振捣头对钢管内部的混凝土进行振捣,通过卡口固定住第一套圈和第二套圈,第一套圈用于安装固定结构,确保在振捣时钢管不会倾倒,第二套圈用以固定下料结构,通过第一套圈和第二套圈的上下位设计将下料结构和振捣结构结合成一体。
Concrete filled steel tube pouring device for bridge pier engineering
一种桥墩工程用钢管混凝土浇筑装置
HAN BOXIONG (Autor:in) / WANG ERCHENG (Autor:in)
18.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2022
|Concrete pouring device for concrete-filled steel tube pile
Europäisches Patentamt | 2020
|Prefabricated assembled concrete-filled steel tube pier
Europäisches Patentamt | 2024
|