Transferring method for wallboards longer than discharging platform
The invention discloses a method for transferring wallboards longer than a discharging platform, which comprises the following construction steps: S1, transferring preparation: adjusting the width and inclination angle of a transferring device according to the parameters and geometric dimensions of the wallboards, so that the transferring device meets the requirement of the discharging platform for transferring super-long wallboards; s2, hoisting preparation is conducted, specifically, before the wallboards are hoisted, the four corners of the wallboards are wrapped with soft cushions, and a plurality of wallboards are packed and bundled firmly, S3, hoisting is conducted, specifically, the wallboards are slowly lifted through a tower crane, a transfer device is placed on an unloading platform in advance, and the wallboards are hoisted to the transfer device of the unloading platform through the tower crane; and S4, transferring is conducted, specifically, the transferring device is used for fixing the wallboards placed on the transferring device, and the wallboards are transferred into the wallboard mounting device from the position of the discharging platform through manual cooperation. The smoothness of the whole transfer process from the unloading platform to the mounting device is ensured, the transfer efficiency is improved, and the labor force is reduced.
本发明公开了一种大于卸料平台长度的墙板转运方法,包括以下施工步骤:S1:转运准备:根据墙板参数和几何尺寸,将转运装置的宽度和倾斜角度进行调节,使转运装置满足卸料平台转运超长墙板的需求;S2:吊装准备:墙板吊运前,先用软垫包裹住墙板四个角,多块打包捆扎牢固,S3:吊装:使用塔吊将墙板缓慢提升,转运装置提前放置在卸料平台,墙板通过塔吊吊运到卸料平台的转运装置上;S4:转运:转运装置对放置在上面的墙板进行固定,通过人工配合把墙板从卸料平台位置转运到墙板安装装置内。保证了从卸料平台到安装装置整个转运过程的流畅,提高了转运效率,减少了劳动力。
Transferring method for wallboards longer than discharging platform
The invention discloses a method for transferring wallboards longer than a discharging platform, which comprises the following construction steps: S1, transferring preparation: adjusting the width and inclination angle of a transferring device according to the parameters and geometric dimensions of the wallboards, so that the transferring device meets the requirement of the discharging platform for transferring super-long wallboards; s2, hoisting preparation is conducted, specifically, before the wallboards are hoisted, the four corners of the wallboards are wrapped with soft cushions, and a plurality of wallboards are packed and bundled firmly, S3, hoisting is conducted, specifically, the wallboards are slowly lifted through a tower crane, a transfer device is placed on an unloading platform in advance, and the wallboards are hoisted to the transfer device of the unloading platform through the tower crane; and S4, transferring is conducted, specifically, the transferring device is used for fixing the wallboards placed on the transferring device, and the wallboards are transferred into the wallboard mounting device from the position of the discharging platform through manual cooperation. The smoothness of the whole transfer process from the unloading platform to the mounting device is ensured, the transfer efficiency is improved, and the labor force is reduced.
本发明公开了一种大于卸料平台长度的墙板转运方法,包括以下施工步骤:S1:转运准备:根据墙板参数和几何尺寸,将转运装置的宽度和倾斜角度进行调节,使转运装置满足卸料平台转运超长墙板的需求;S2:吊装准备:墙板吊运前,先用软垫包裹住墙板四个角,多块打包捆扎牢固,S3:吊装:使用塔吊将墙板缓慢提升,转运装置提前放置在卸料平台,墙板通过塔吊吊运到卸料平台的转运装置上;S4:转运:转运装置对放置在上面的墙板进行固定,通过人工配合把墙板从卸料平台位置转运到墙板安装装置内。保证了从卸料平台到安装装置整个转运过程的流畅,提高了转运效率,减少了劳动力。
Transferring method for wallboards longer than discharging platform
大于卸料平台长度的墙板转运方法
LI HAIQING (Autor:in) / LIU YIQUAN (Autor:in) / XU CHAO (Autor:in)
18.04.2023
Patent
Elektronische Ressource
Chinesisch