Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method and equipment for cement soil roadbed of highway roadbed
The invention provides an expressway roadbed cement soil roadbed construction method and equipment, the equipment comprises a box body, the left surface of the box body is fixedly connected with a connecting rod, the upper surface of the connecting rod is slidably connected with an extension rod, the inner surface of the extension rod is in threaded connection with a lifting rod, and the upper surface of the lifting rod is fixedly connected with a lifting plate; the upper surface of the lifting plate is slidably connected with a movable clamping piece, the upper surface of the lifting plate is fixedly connected with a fixed clamping piece, the interior of the fixed clamping piece is in threaded connection with a first threaded rod, and the right surface of the first threaded rod is fixedly connected with a hand wheel. By means of the box body capable of being connected with the loaded earthwork, the earthwork can be directly bulldozed to be flat, and the damage to the pavement on the lower layer is avoided, by means of the belt and the transmission wheel, the earthwork can be poured out according to the movement of the device in the using process, the unloading uniformity is improved, and the discharging speed can be adjusted.
本发明提供一种高速公路路床水泥土路床施工方法及设备,包括箱体,所述箱体的左表面固定连接有连接杆,所述连接杆的上表面滑动连接有伸长杆,所述伸长杆的内表面螺纹连接有升降杆,所述升降杆的上表面固定连接有升降板,所述升降板的上表面滑动连接有移动夹持片,所述升降板的上表面固定连接有固定夹持片,所述固定夹持片的内部螺纹连接有第一螺纹杆,所述第一螺纹杆的右表面固定连接有手轮。通过可以对装载土方连接的箱体,解决直接将土方进行推平,避免造成下层的路面的损坏的问题,通过皮带与传动轮,实现装置在使用的过程中可以根据自身的移动对土方进行倒出,增加卸载的均匀性,且可以调节出料的速度。
Construction method and equipment for cement soil roadbed of highway roadbed
The invention provides an expressway roadbed cement soil roadbed construction method and equipment, the equipment comprises a box body, the left surface of the box body is fixedly connected with a connecting rod, the upper surface of the connecting rod is slidably connected with an extension rod, the inner surface of the extension rod is in threaded connection with a lifting rod, and the upper surface of the lifting rod is fixedly connected with a lifting plate; the upper surface of the lifting plate is slidably connected with a movable clamping piece, the upper surface of the lifting plate is fixedly connected with a fixed clamping piece, the interior of the fixed clamping piece is in threaded connection with a first threaded rod, and the right surface of the first threaded rod is fixedly connected with a hand wheel. By means of the box body capable of being connected with the loaded earthwork, the earthwork can be directly bulldozed to be flat, and the damage to the pavement on the lower layer is avoided, by means of the belt and the transmission wheel, the earthwork can be poured out according to the movement of the device in the using process, the unloading uniformity is improved, and the discharging speed can be adjusted.
本发明提供一种高速公路路床水泥土路床施工方法及设备,包括箱体,所述箱体的左表面固定连接有连接杆,所述连接杆的上表面滑动连接有伸长杆,所述伸长杆的内表面螺纹连接有升降杆,所述升降杆的上表面固定连接有升降板,所述升降板的上表面滑动连接有移动夹持片,所述升降板的上表面固定连接有固定夹持片,所述固定夹持片的内部螺纹连接有第一螺纹杆,所述第一螺纹杆的右表面固定连接有手轮。通过可以对装载土方连接的箱体,解决直接将土方进行推平,避免造成下层的路面的损坏的问题,通过皮带与传动轮,实现装置在使用的过程中可以根据自身的移动对土方进行倒出,增加卸载的均匀性,且可以调节出料的速度。
Construction method and equipment for cement soil roadbed of highway roadbed
一种高速公路路床水泥土路床施工方法及设备
ZHANG SHUHUA (Autor:in) / LI XIA (Autor:in) / FAN HAIHUA (Autor:in) / KANG XIAOLEI (Autor:in) / CHA JIANHUA (Autor:in) / CUI CHENGQUAN (Autor:in) / WANG HUAN (Autor:in) / ZHANG HOUCHAO (Autor:in) / FAN CHANGLIN (Autor:in)
25.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Roadbed construction equipment for highway engineering construction
Europäisches Patentamt | 2023
|Salinized soil roadbed construction method and salinized soil roadbed
Europäisches Patentamt | 2021
|