Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete laying device for bridge and road construction
A concrete laying device for bridge and road construction is characterized in that a liftable lifting plate is mounted on the front side of a mounting plate, a first conveying pipe is fixedly connected to the middle of the lower end of the lifting plate, and second conveying pipes with adjustable intervals are mounted on the two sides of the first conveying pipe correspondingly; the upper ends of the first conveying pipe and the second conveying pipe are fixedly connected and communicated with guide pipes, the upper ends of the guide pipes are fixedly connected and communicated with a sleeve, and the bottom of the sleeve is fixedly connected with the lifting plate; when the device is used, a conveying pipeline of the automobile pump can be in butt joint with the sleeve, then concrete is conveyed through the automobile pump, and then the concrete can be shunted through the first conveying pipe and the second conveying pipe, so that constructors can lay the concrete conveniently; the distance between the first conveying pipe and the second conveying pipe can be adjusted according to the width of a construction bridge floor, and the application range is wide.
一种桥梁道路建设用混凝土铺设装置,安装板的前侧安装有可升降的升降板,升降板的下端中部固定连接有第一输送管,第一输送管的两侧分别安装有可调节间距的第二输送管,第一输送管和第二输送管的上端分别固定连接并接通有导管,导管的上端共同固定连接并接通有一个套管,套管底部与升降板固定连接;本装置在使用时可以将汽车泵的输送管道与套管对接,然后通过汽车泵输送混凝土便可以通过第一输送管和第二输送管将混凝土进行分流,方便施工人员铺设混凝土,第一输送管和第二输送管之间的间距可以根据施工桥面的宽度进行调整,适用范围广泛。
Concrete laying device for bridge and road construction
A concrete laying device for bridge and road construction is characterized in that a liftable lifting plate is mounted on the front side of a mounting plate, a first conveying pipe is fixedly connected to the middle of the lower end of the lifting plate, and second conveying pipes with adjustable intervals are mounted on the two sides of the first conveying pipe correspondingly; the upper ends of the first conveying pipe and the second conveying pipe are fixedly connected and communicated with guide pipes, the upper ends of the guide pipes are fixedly connected and communicated with a sleeve, and the bottom of the sleeve is fixedly connected with the lifting plate; when the device is used, a conveying pipeline of the automobile pump can be in butt joint with the sleeve, then concrete is conveyed through the automobile pump, and then the concrete can be shunted through the first conveying pipe and the second conveying pipe, so that constructors can lay the concrete conveniently; the distance between the first conveying pipe and the second conveying pipe can be adjusted according to the width of a construction bridge floor, and the application range is wide.
一种桥梁道路建设用混凝土铺设装置,安装板的前侧安装有可升降的升降板,升降板的下端中部固定连接有第一输送管,第一输送管的两侧分别安装有可调节间距的第二输送管,第一输送管和第二输送管的上端分别固定连接并接通有导管,导管的上端共同固定连接并接通有一个套管,套管底部与升降板固定连接;本装置在使用时可以将汽车泵的输送管道与套管对接,然后通过汽车泵输送混凝土便可以通过第一输送管和第二输送管将混凝土进行分流,方便施工人员铺设混凝土,第一输送管和第二输送管之间的间距可以根据施工桥面的宽度进行调整,适用范围广泛。
Concrete laying device for bridge and road construction
一种桥梁道路建设用混凝土铺设装置
MEI FANGQIN (Autor:in) / ZHANG CHAO (Autor:in) / FENG XIAOMIN (Autor:in) / XUE YINGJIE (Autor:in) / HUANG RUXIN (Autor:in) / CAO YONG (Autor:in) / MEI SUQIN (Autor:in) / HAN YULING (Autor:in) / SU HONGSHUI (Autor:in) / SUN BINQIANG (Autor:in)
25.04.2023
Patent
Elektronische Ressource
Chinesisch
Concrete laying device for bridge construction and laying method thereof
Europäisches Patentamt | 2024
|Asphalt laying device for road and bridge construction
Europäisches Patentamt | 2021
|