Foundation pit supporting pre-stressed anchor cable embedded pipe leakage prevention construction method
The invention discloses an anti-leakage construction method for a pre-stressed anchor cable embedded pipe of a foundation pit support. The method comprises the following steps that S10, secondary grouting is conducted on a pre-stressed anchor cable; s20, main reinforcements and stirrups of the top beam and the waist beam are bound; s30, a PVC protection sleeve is arranged in the pre-stressed anchor cable in a penetrating mode; s40, a crown beam PE grouting pipe is pre-buried in the PVC protective sleeve; s50, a waist beam PE grouting pipe is pre-buried in an anchor cable hole channel; s60, a crown beam anchor cable PVC protection sleeve head and a waist beam anchor cable hole opening are blocked; s70, concrete pouring and curing are conducted on the top beams and the waist beams; s80, the pre-stressed anchor cable is tensioned and locked; s90, whether the anchor head leakage phenomenon occurs or not after the anchor cable is tensioned and locked is judged; s100, epoxy resin is poured into a PE grouting pipe opening; s110, a PE grouting pipe opening is closed; the method has the beneficial effects that the method is convenient and fast to operate, quick leaking stoppage can be achieved, and the influence on site construction is reduced.
本发明公开了一种基坑支护预应力锚索预埋管防堵漏施工方法,该方法包括以下步骤:S10:对预应力锚索进行二次注浆;S20:对冠梁和腰梁的主筋以及箍筋进行绑扎;S30:在预应力锚索中穿入PVC保护套管;S40:将冠梁PE注浆管预埋至PVC保护套管内;S50:将腰梁PE注浆管预埋至锚索孔道内;S60:对冠梁锚索PVC保护套管头以及腰梁锚索孔口进行封堵;S70:对冠梁及腰梁进行混凝土浇筑及养护;S80:对预应力锚索张拉锁定;S90:判断锚索完成张拉和锁定后是否出现锚头渗漏现象;S100:在PE注浆管口处灌入环氧树脂;S110:封闭PE注浆管口;S120:完成堵漏,本发明的有益效果是:该方法操作便捷,能够快速堵漏,减少对现场施工的影响。
Foundation pit supporting pre-stressed anchor cable embedded pipe leakage prevention construction method
The invention discloses an anti-leakage construction method for a pre-stressed anchor cable embedded pipe of a foundation pit support. The method comprises the following steps that S10, secondary grouting is conducted on a pre-stressed anchor cable; s20, main reinforcements and stirrups of the top beam and the waist beam are bound; s30, a PVC protection sleeve is arranged in the pre-stressed anchor cable in a penetrating mode; s40, a crown beam PE grouting pipe is pre-buried in the PVC protective sleeve; s50, a waist beam PE grouting pipe is pre-buried in an anchor cable hole channel; s60, a crown beam anchor cable PVC protection sleeve head and a waist beam anchor cable hole opening are blocked; s70, concrete pouring and curing are conducted on the top beams and the waist beams; s80, the pre-stressed anchor cable is tensioned and locked; s90, whether the anchor head leakage phenomenon occurs or not after the anchor cable is tensioned and locked is judged; s100, epoxy resin is poured into a PE grouting pipe opening; s110, a PE grouting pipe opening is closed; the method has the beneficial effects that the method is convenient and fast to operate, quick leaking stoppage can be achieved, and the influence on site construction is reduced.
本发明公开了一种基坑支护预应力锚索预埋管防堵漏施工方法,该方法包括以下步骤:S10:对预应力锚索进行二次注浆;S20:对冠梁和腰梁的主筋以及箍筋进行绑扎;S30:在预应力锚索中穿入PVC保护套管;S40:将冠梁PE注浆管预埋至PVC保护套管内;S50:将腰梁PE注浆管预埋至锚索孔道内;S60:对冠梁锚索PVC保护套管头以及腰梁锚索孔口进行封堵;S70:对冠梁及腰梁进行混凝土浇筑及养护;S80:对预应力锚索张拉锁定;S90:判断锚索完成张拉和锁定后是否出现锚头渗漏现象;S100:在PE注浆管口处灌入环氧树脂;S110:封闭PE注浆管口;S120:完成堵漏,本发明的有益效果是:该方法操作便捷,能够快速堵漏,减少对现场施工的影响。
Foundation pit supporting pre-stressed anchor cable embedded pipe leakage prevention construction method
基坑支护预应力锚索预埋管防堵漏施工方法
LIU ZHENGZHI (Autor:in) / GUO WENLIN (Autor:in) / ZHAO YUANYUAN (Autor:in) / LI QUAN (Autor:in) / LEI BIN (Autor:in) / SUN CHAO (Autor:in) / CHENG YUPING (Autor:in) / NIE CHANGHE (Autor:in) / ZHANG YUCHEN (Autor:in) / LONG YAN (Autor:in)
25.04.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Pre-stressed anchor cable for foundation pit supporting
Europäisches Patentamt | 2022
|Recyclable pre-stressed anchor cable for foundation pit supporting and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Construction method of foundation pit slope pre-stressed anchor cable
Europäisches Patentamt | 2024
|