Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated concrete cylinder connecting node based on flange connector
The invention relates to a prefabricated concrete cylinder connecting node based on a flange connector, which comprises an upper prefabricated column, a lower prefabricated component, the flange connector and a steel bar connector, and is characterized in that a threading section at the upper side end part of the upper prefabricated column is connected with an upper side bolt in an upper side flange plate of the flange connector through a hole; the lower side end threading section of the lower prefabricated column is connected with a lower side bolt on a lower side flange plate of the flange connector in a penetrating mode, reinforcing steel bars at the weak position of the flange connector are connected in a reinforced mode through a reinforcing steel bar connector, and a post-pouring concrete body is poured into the unoccupied connecting part, the bottom of the upper prefabricated column and the top of the lower prefabricated column. The post-cast material enables the combination position of the upper and lower prefabricated components to form an integral structure. According to the prefabricated concrete cylinder connecting joint, composite connection is carried out on the joint of the prefabricated columns, the prefabricated concrete cylinder connecting joint which is simple in bolt connection construction and has post-pouring concrete shear resistance is provided, and effective transmission of axial force of the prefabricated concrete cylinder connecting joint can be guaranteed.
本发明涉及一种基于法兰连接器的预制混凝土圆柱连接节点,包括上预制柱、下预制构件、法兰连接器和钢筋连接器,上预制柱的上侧端部套丝段与法兰连接器的上侧法兰板上的上侧螺栓穿孔连接,下预制柱上的下侧端部套丝段与法兰连接器的下侧法兰板上的下侧螺栓穿孔连接,通过钢筋连接器对法兰连接器薄弱位置处的钢筋进行加固连接,连接空余部分与上预制柱底部和下预制构件顶部浇筑后浇混凝土体,后浇材料使上下预制构件结合位置形成整体结构。本发明通过对预制柱结合处进行所述复合连接,本发明提供了一种既具有螺栓连接施工简易,又具有后浇混凝土抗剪的预制混凝土圆柱连接节点,能够保证所述预制混凝土圆柱连接节点轴向力的有效传递。
Prefabricated concrete cylinder connecting node based on flange connector
The invention relates to a prefabricated concrete cylinder connecting node based on a flange connector, which comprises an upper prefabricated column, a lower prefabricated component, the flange connector and a steel bar connector, and is characterized in that a threading section at the upper side end part of the upper prefabricated column is connected with an upper side bolt in an upper side flange plate of the flange connector through a hole; the lower side end threading section of the lower prefabricated column is connected with a lower side bolt on a lower side flange plate of the flange connector in a penetrating mode, reinforcing steel bars at the weak position of the flange connector are connected in a reinforced mode through a reinforcing steel bar connector, and a post-pouring concrete body is poured into the unoccupied connecting part, the bottom of the upper prefabricated column and the top of the lower prefabricated column. The post-cast material enables the combination position of the upper and lower prefabricated components to form an integral structure. According to the prefabricated concrete cylinder connecting joint, composite connection is carried out on the joint of the prefabricated columns, the prefabricated concrete cylinder connecting joint which is simple in bolt connection construction and has post-pouring concrete shear resistance is provided, and effective transmission of axial force of the prefabricated concrete cylinder connecting joint can be guaranteed.
本发明涉及一种基于法兰连接器的预制混凝土圆柱连接节点,包括上预制柱、下预制构件、法兰连接器和钢筋连接器,上预制柱的上侧端部套丝段与法兰连接器的上侧法兰板上的上侧螺栓穿孔连接,下预制柱上的下侧端部套丝段与法兰连接器的下侧法兰板上的下侧螺栓穿孔连接,通过钢筋连接器对法兰连接器薄弱位置处的钢筋进行加固连接,连接空余部分与上预制柱底部和下预制构件顶部浇筑后浇混凝土体,后浇材料使上下预制构件结合位置形成整体结构。本发明通过对预制柱结合处进行所述复合连接,本发明提供了一种既具有螺栓连接施工简易,又具有后浇混凝土抗剪的预制混凝土圆柱连接节点,能够保证所述预制混凝土圆柱连接节点轴向力的有效传递。
Prefabricated concrete cylinder connecting node based on flange connector
一种基于法兰连接器的预制混凝土圆柱连接节点
PANG RUI (Autor:in) / WEN YIMING (Autor:in) / GAO CHAOFAN (Autor:in)
25.04.2023
Patent
Elektronische Ressource
Chinesisch
Steel reinforced concrete prefabricated column node connecting structure
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2015
|Prefabricated concrete connecting piece and prefabricated concrete pile
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Prefabricated part connecting piece and concrete prefabricated part connecting structure
Europäisches Patentamt | 2020
|