Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of prefabricated laminated slab for fabricated building
The invention relates to the technical field of prefabricated laminated slab construction, in particular to a construction method of a prefabricated laminated slab for a fabricated building. The laminated slab comprises a laminated slab body, a plurality of first limiting blocks, a plurality of second limiting blocks and a pair of supporting assemblies. The pre-fixing work between the two laminated slab bodies is completed through the arranged first limiting blocks and the arranged second limiting blocks, the stability between the two laminated slab bodies is maintained, and the situation that a gap is formed again between the two laminated slab bodies due to shaking generated in the mounting process, the mounting position deviates, and the mounting effect is affected is prevented; and meanwhile, certain supporting force is provided for the two sides of the laminated slab bodies through the arranged supporting assemblies, and the mounting stability of the two laminated slab bodies is further maintained.
本发明涉及预制叠合板施工技术领域,具体地说,涉及一种装配式建筑用预制叠合板的施工方法。其包括叠合板本体、若干第一限位块、若干第二限位块以及一对支撑组件。本发明通过设置的各第一限位块以及各第二限位块完成对两叠合板本体之间预固定工作,维持两个叠合板本体之间的稳定,防止其安装过程中产生的晃动导致两叠合板本体重新形成间隙,导致安装位置出现偏移,影响安装效果,同时通过设置的支撑组件提供给叠合板本体两侧一定的支撑力,进一步维持两叠合板本体的安装稳定性。
Construction method of prefabricated laminated slab for fabricated building
The invention relates to the technical field of prefabricated laminated slab construction, in particular to a construction method of a prefabricated laminated slab for a fabricated building. The laminated slab comprises a laminated slab body, a plurality of first limiting blocks, a plurality of second limiting blocks and a pair of supporting assemblies. The pre-fixing work between the two laminated slab bodies is completed through the arranged first limiting blocks and the arranged second limiting blocks, the stability between the two laminated slab bodies is maintained, and the situation that a gap is formed again between the two laminated slab bodies due to shaking generated in the mounting process, the mounting position deviates, and the mounting effect is affected is prevented; and meanwhile, certain supporting force is provided for the two sides of the laminated slab bodies through the arranged supporting assemblies, and the mounting stability of the two laminated slab bodies is further maintained.
本发明涉及预制叠合板施工技术领域,具体地说,涉及一种装配式建筑用预制叠合板的施工方法。其包括叠合板本体、若干第一限位块、若干第二限位块以及一对支撑组件。本发明通过设置的各第一限位块以及各第二限位块完成对两叠合板本体之间预固定工作,维持两个叠合板本体之间的稳定,防止其安装过程中产生的晃动导致两叠合板本体重新形成间隙,导致安装位置出现偏移,影响安装效果,同时通过设置的支撑组件提供给叠合板本体两侧一定的支撑力,进一步维持两叠合板本体的安装稳定性。
Construction method of prefabricated laminated slab for fabricated building
一种装配式建筑用预制叠合板的施工方法
BAI ZHAOLONG (Autor:in) / QIU CHAOSHENG (Autor:in) / XUE LAIZHANG (Autor:in) / WANG WEIXIANG (Autor:in) / XU CONGYONG (Autor:in) / GUO LIQIN (Autor:in) / LIAO WEIJIE (Autor:in)
25.04.2023
Patent
Elektronische Ressource
Chinesisch
On-site construction method of fabricated building prefabricated laminated slab
Europäisches Patentamt | 2022
|Construction method for prefabricated building laminated slab
Europäisches Patentamt | 2021
|Prefabricated building construction method of laminated slab and prefabricated staircase
Europäisches Patentamt | 2023
|