Constructional column and construction method thereof
The embodiment of the invention discloses a constructional column and a construction method of the constructional column, and the constructional column comprises a first masonry block which is provided with a through first steel bar preformed hole, the side surface of the first masonry block is provided with a grouting hole, and the grouting hole is communicated with the first steel bar preformed hole; the second masonry block is arranged above the first masonry block, second through steel bar preformed holes are formed in the second masonry block, and the second steel bar preformed holes and the first steel bar preformed holes are formed in a one-to-one correspondence mode, so that grouting materials are poured into the second steel bar preformed holes of the second masonry block from the grouting holes; the first steel bar preformed holes and the second steel bar preformed holes are used for arranging main steel bars of the constructional column. According to the constructional column, the grouting holes are formed in the side face of the first masonry block and communicate with the first steel bar preformed holes, meanwhile, the second steel bar preformed holes in the second masonry block correspond to the first steel bar preformed holes in a one-to-one mode, and grouting materials are poured into the second steel bar preformed holes in the second masonry block through the grouting holes; therefore, the construction efficiency of the constructional column is improved.
本发明实施例公开了一种构造柱及构造柱的施工方法,包括:第一砌筑块,设置有贯通的第一钢筋预留孔,第一砌筑块的侧面设置有灌浆孔,灌浆孔与第一钢筋预留孔连通;第二砌筑块,设置于第一砌筑块的上方,且第二砌筑块上设置有贯通的第二钢筋预留孔,第二钢筋预留孔与第一钢筋预留孔一一对应设置,以使灌浆料由灌浆孔灌注至第二砌筑块的第二钢筋预留孔内,第一钢筋预留孔和第二钢筋预留孔用于设置构造柱的主筋。本发明提供的构造柱,在第一砌筑块的侧面设置灌浆孔,且灌浆孔与第一钢筋预留孔连通,同时在第二砌筑块上的第二钢筋预留孔与第一钢筋预留孔一一对应,使灌浆料由灌浆孔灌注至第二砌筑块的第二钢筋预留孔内,从而提高了构造柱的施工效率。
Constructional column and construction method thereof
The embodiment of the invention discloses a constructional column and a construction method of the constructional column, and the constructional column comprises a first masonry block which is provided with a through first steel bar preformed hole, the side surface of the first masonry block is provided with a grouting hole, and the grouting hole is communicated with the first steel bar preformed hole; the second masonry block is arranged above the first masonry block, second through steel bar preformed holes are formed in the second masonry block, and the second steel bar preformed holes and the first steel bar preformed holes are formed in a one-to-one correspondence mode, so that grouting materials are poured into the second steel bar preformed holes of the second masonry block from the grouting holes; the first steel bar preformed holes and the second steel bar preformed holes are used for arranging main steel bars of the constructional column. According to the constructional column, the grouting holes are formed in the side face of the first masonry block and communicate with the first steel bar preformed holes, meanwhile, the second steel bar preformed holes in the second masonry block correspond to the first steel bar preformed holes in a one-to-one mode, and grouting materials are poured into the second steel bar preformed holes in the second masonry block through the grouting holes; therefore, the construction efficiency of the constructional column is improved.
本发明实施例公开了一种构造柱及构造柱的施工方法,包括:第一砌筑块,设置有贯通的第一钢筋预留孔,第一砌筑块的侧面设置有灌浆孔,灌浆孔与第一钢筋预留孔连通;第二砌筑块,设置于第一砌筑块的上方,且第二砌筑块上设置有贯通的第二钢筋预留孔,第二钢筋预留孔与第一钢筋预留孔一一对应设置,以使灌浆料由灌浆孔灌注至第二砌筑块的第二钢筋预留孔内,第一钢筋预留孔和第二钢筋预留孔用于设置构造柱的主筋。本发明提供的构造柱,在第一砌筑块的侧面设置灌浆孔,且灌浆孔与第一钢筋预留孔连通,同时在第二砌筑块上的第二钢筋预留孔与第一钢筋预留孔一一对应,使灌浆料由灌浆孔灌注至第二砌筑块的第二钢筋预留孔内,从而提高了构造柱的施工效率。
Constructional column and construction method thereof
一种构造柱及构造柱的施工方法
OU XIAOJING (Autor:in) / MA KUN (Autor:in) / YUAN RUI'EN (Autor:in) / LUO ZHIWEI (Autor:in) / SHI HAO (Autor:in) / LI NING (Autor:in)
28.04.2023
Patent
Elektronische Ressource
Chinesisch
Constructional column construction method and constructional column mold
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|