The steel pipe pole precast pile comprises a main pipe pile foundation, a plurality of spiral ground piles are arranged on the periphery of the main pipe pile foundation, and an electric power steel pipe pole is fixedly connected to the upper portion of the main pipe pile foundation. The power steel pipe pole is connected with the spiral ground pile through the auxiliary connecting pull rod. The steel pipe pole rapid first-aid repair construction method comprises the following steps that at the position where a steel pipe pole needs to be erected, a main pipe pile foundation is driven to the designated depth through a dynamic compaction machine according to the construction standard, and then spiral ground piles are driven into the specific positions around the main pipe pile foundation. And after being fixed on the main pipe pile foundation through high-strength bolts, the power steel pipe pole is respectively connected with the spiral ground pile and the power steel pipe pole through two ends of the auxiliary connecting pull rod. The electric power steel pipe pole is high in bearing capacity and not prone to toppling over.
本发明涉及一种钢管杆预制桩及快速抢修施工方法,钢管杆预制桩,包括主管桩基础,主管桩基础外围设置有若干个螺旋地桩,主管桩基础上方固定连接有电力钢管杆。电力钢管杆通过辅助连接拉杆与螺旋地桩连接。钢管杆快速抢修施工方法,包括以下步骤:在需要架设钢管杆的位置,将主管桩基础通过强夯机按照施工标准打到指定深度后,然后在主管桩基础四周的特定位置打入螺旋地桩。电力钢管杆通过高强度螺栓固定在主管桩基础上后,通过辅助连接拉杆两端分别与螺旋地桩以及电力钢管杆连接。本发明承载能力强,电力钢管杆不易倾倒。
The steel pipe pole precast pile comprises a main pipe pile foundation, a plurality of spiral ground piles are arranged on the periphery of the main pipe pile foundation, and an electric power steel pipe pole is fixedly connected to the upper portion of the main pipe pile foundation. The power steel pipe pole is connected with the spiral ground pile through the auxiliary connecting pull rod. The steel pipe pole rapid first-aid repair construction method comprises the following steps that at the position where a steel pipe pole needs to be erected, a main pipe pile foundation is driven to the designated depth through a dynamic compaction machine according to the construction standard, and then spiral ground piles are driven into the specific positions around the main pipe pile foundation. And after being fixed on the main pipe pile foundation through high-strength bolts, the power steel pipe pole is respectively connected with the spiral ground pile and the power steel pipe pole through two ends of the auxiliary connecting pull rod. The electric power steel pipe pole is high in bearing capacity and not prone to toppling over.
本发明涉及一种钢管杆预制桩及快速抢修施工方法,钢管杆预制桩,包括主管桩基础,主管桩基础外围设置有若干个螺旋地桩,主管桩基础上方固定连接有电力钢管杆。电力钢管杆通过辅助连接拉杆与螺旋地桩连接。钢管杆快速抢修施工方法,包括以下步骤:在需要架设钢管杆的位置,将主管桩基础通过强夯机按照施工标准打到指定深度后,然后在主管桩基础四周的特定位置打入螺旋地桩。电力钢管杆通过高强度螺栓固定在主管桩基础上后,通过辅助连接拉杆两端分别与螺旋地桩以及电力钢管杆连接。本发明承载能力强,电力钢管杆不易倾倒。
Steel pipe pole precast pile and rapid first-aid repair construction method
钢管杆预制桩及快速抢修施工方法
LI BIAO (Autor:in)
28.04.2023
Patent
Elektronische Ressource
Chinesisch
Precast pile construction method and precast pile construction equipment
Europäisches Patentamt | 2021
|Building concrete pipe pile precast pile enclosure structure construction system
Europäisches Patentamt | 2024
|