Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of integrated waterproof geomembrane
The invention belongs to the field of civil engineering, and particularly relates to a construction method of an integrated waterproof geomembrane. The gravitational potential energy of the geomembrane is converted into useful kinetic energy needed for laying, the gravitational potential energy of the geomembrane is converted into kinetic energy through the rolling effect of the geomembrane from top to bottom, the geomembrane on the left side and the geomembrane on the right side roll as a whole through the front fixing assembly, the rear fixing assembly and the connecting part, and laying of the geomembrane is completed in the rolling process; the rolling parts and the connecting parts on the left side and the right side are mutually restricted, so that stall or deviation of the geomembrane in the rolling process is avoided. The laying efficiency of the geomembrane is improved.
本发明属于土木工程领域,具体涉及一种一体防水土工膜施工方法。本发明将土工膜的重力势能转换为有用的铺设所需的动能,利用土工膜从上至下的滚动作用将其重力势能转换为动能,通过前固定组件、后固定组件和衔接部使得左侧和右侧的土工膜以一个整体滚动并在滚动中完成对土工膜的铺设,左右两侧的滚动部和衔接部相互制约避免土工膜在滚动过程中出现失速或偏移。本发明提高了土工膜的铺设效率。
Construction method of integrated waterproof geomembrane
The invention belongs to the field of civil engineering, and particularly relates to a construction method of an integrated waterproof geomembrane. The gravitational potential energy of the geomembrane is converted into useful kinetic energy needed for laying, the gravitational potential energy of the geomembrane is converted into kinetic energy through the rolling effect of the geomembrane from top to bottom, the geomembrane on the left side and the geomembrane on the right side roll as a whole through the front fixing assembly, the rear fixing assembly and the connecting part, and laying of the geomembrane is completed in the rolling process; the rolling parts and the connecting parts on the left side and the right side are mutually restricted, so that stall or deviation of the geomembrane in the rolling process is avoided. The laying efficiency of the geomembrane is improved.
本发明属于土木工程领域,具体涉及一种一体防水土工膜施工方法。本发明将土工膜的重力势能转换为有用的铺设所需的动能,利用土工膜从上至下的滚动作用将其重力势能转换为动能,通过前固定组件、后固定组件和衔接部使得左侧和右侧的土工膜以一个整体滚动并在滚动中完成对土工膜的铺设,左右两侧的滚动部和衔接部相互制约避免土工膜在滚动过程中出现失速或偏移。本发明提高了土工膜的铺设效率。
Construction method of integrated waterproof geomembrane
一种一体防水土工膜施工方法
ZHAO MINGYANG (Autor:in)
02.05.2023
Patent
Elektronische Ressource
Chinesisch
Road subgrade global hydrophobic-waterproof composite three-dimensional geomembrane
Europäisches Patentamt | 2020
|Geomembrane Installation and Construction Survivability
British Library Conference Proceedings | 1997
|