Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Support pile sharing and basement connecting construction method for multi-layer basement staged construction
The invention discloses a construction method for supporting pile sharing and basement connection in multi-layer basement stage construction. The method comprises the following steps that S10, construction preparation is conducted; s20, foundation pit supporting pile structure construction is conducted; s30, partition construction is conducted on the basement structure; s40, the beam plate is jacked back; s50, the supporting piles are dismantled; s60, concrete pouring is conducted at the connecting position; s70, the concrete is cured; s80, the step S40 of beam plate jacking is repeated till the step S70 of concrete curing; structure back-jacking, support pile dismantling, concrete pouring at the connecting position, concrete curing and connection of all layers of the basement are repeatedly conducted till construction is completed. The method has the beneficial effects that by sharing the support piles of the adjacent completed construction sites and connecting the support piles with the basement, the cost can be reduced, and the construction period can be shortened.
本发明公开了一种多层地下室分期施工支护桩共用与地下室连接施工方法,该方法包括以下步骤:S10:施工准备;S20:进行基坑支护桩结构施工;S30:对地下室结构进行分区施工;S40:对梁板进行回顶;S50:对支护桩进行拆除;S60:在连接处进行混凝土浇筑;S70:对混凝土进行养护;S80:重复步骤S40梁板回顶至S70混凝土养护;即重复进行结构回顶、支护桩拆除、连接处混凝土浇筑、混凝土养护以及地下室各层连接,直至施工完成。本发明的有益效果是:该方法通过共用相邻已完工工地的支护桩并与地下室连接,能够降低成本,缩短工期。
Support pile sharing and basement connecting construction method for multi-layer basement staged construction
The invention discloses a construction method for supporting pile sharing and basement connection in multi-layer basement stage construction. The method comprises the following steps that S10, construction preparation is conducted; s20, foundation pit supporting pile structure construction is conducted; s30, partition construction is conducted on the basement structure; s40, the beam plate is jacked back; s50, the supporting piles are dismantled; s60, concrete pouring is conducted at the connecting position; s70, the concrete is cured; s80, the step S40 of beam plate jacking is repeated till the step S70 of concrete curing; structure back-jacking, support pile dismantling, concrete pouring at the connecting position, concrete curing and connection of all layers of the basement are repeatedly conducted till construction is completed. The method has the beneficial effects that by sharing the support piles of the adjacent completed construction sites and connecting the support piles with the basement, the cost can be reduced, and the construction period can be shortened.
本发明公开了一种多层地下室分期施工支护桩共用与地下室连接施工方法,该方法包括以下步骤:S10:施工准备;S20:进行基坑支护桩结构施工;S30:对地下室结构进行分区施工;S40:对梁板进行回顶;S50:对支护桩进行拆除;S60:在连接处进行混凝土浇筑;S70:对混凝土进行养护;S80:重复步骤S40梁板回顶至S70混凝土养护;即重复进行结构回顶、支护桩拆除、连接处混凝土浇筑、混凝土养护以及地下室各层连接,直至施工完成。本发明的有益效果是:该方法通过共用相邻已完工工地的支护桩并与地下室连接,能够降低成本,缩短工期。
Support pile sharing and basement connecting construction method for multi-layer basement staged construction
多层地下室分期施工支护桩共用与地下室连接施工方法
ZHOU FENG (Autor:in) / YANG ZHEN (Autor:in) / LIU MINGTAO (Autor:in) / CHEN HAI (Autor:in) / LIU WEI (Autor:in)
02.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Existing two-layer basement engineering pile construction method
Europäisches Patentamt | 2023
|Multi-layer basement design and construction method and semi-fabricated multi-layer basement
Europäisches Patentamt | 2021
|