Composite masonry external wall thermal insulation integrated construction method
The invention discloses a composite masonry outer wall heat insulation integrated construction method, and belongs to the technical field of secondary structure construction. The construction method comprises the following construction steps: base layer treatment and paying-off measurement; pre-arranging outer wall bricks, and planting steel bars into a filler wall; building the composite masonry external wall thermal insulation building blocks; placing a full-length anchor tie bar; binding reinforcing steel bars at parts such as an outer wall constructional column, a lintel and a coping, placing an extruded insulation board on the outer side, inserting a fixing anchor, installing a template, and pouring concrete; and the masonry is connected with a beam bottom or a plate bottom. The construction method has the advantages that the secondary structure and the insulation board are constructed synchronously, work tasks of three procedures can be completed in one procedure, the construction efficiency is greatly improved, the labor cost is reduced, meanwhile, repeated high-altitude operation of constructors is avoided, and the safety risk is reduced. The design and construction technology is simple, investment is saved, labor and time are saved, the requirement of the building energy-saving standard is met, and outer wall heat preservation and the same service life of a building are achieved.
一种复合型砌体外墙保温一体化施工方法,属于二次结构施工技术领域。施工步骤包括:基层处理及放线测量;外墙砖块预排,填充墙植筋;复合型砌体外墙保温砌块砌筑;通长锚拉筋放置;外墙构造柱、过梁、压顶等部位钢筋绑扎,外侧放入挤塑保温板插入固定锚钉,模板安装,浇筑混凝土;砌体与梁底或板底联结。优点在于,二次结构与保温板同步施工,可以在一道工序中完成三道工序的工作任务,大大提高施工效率,降低人力成本,同时避免施工人员多次进行高空作业,降低安全风险。设计施工技术简单,它既节省投资,省工省时省力,满足建筑节能标准的要求又实现了外墙保温与建筑同寿命。
Composite masonry external wall thermal insulation integrated construction method
The invention discloses a composite masonry outer wall heat insulation integrated construction method, and belongs to the technical field of secondary structure construction. The construction method comprises the following construction steps: base layer treatment and paying-off measurement; pre-arranging outer wall bricks, and planting steel bars into a filler wall; building the composite masonry external wall thermal insulation building blocks; placing a full-length anchor tie bar; binding reinforcing steel bars at parts such as an outer wall constructional column, a lintel and a coping, placing an extruded insulation board on the outer side, inserting a fixing anchor, installing a template, and pouring concrete; and the masonry is connected with a beam bottom or a plate bottom. The construction method has the advantages that the secondary structure and the insulation board are constructed synchronously, work tasks of three procedures can be completed in one procedure, the construction efficiency is greatly improved, the labor cost is reduced, meanwhile, repeated high-altitude operation of constructors is avoided, and the safety risk is reduced. The design and construction technology is simple, investment is saved, labor and time are saved, the requirement of the building energy-saving standard is met, and outer wall heat preservation and the same service life of a building are achieved.
一种复合型砌体外墙保温一体化施工方法,属于二次结构施工技术领域。施工步骤包括:基层处理及放线测量;外墙砖块预排,填充墙植筋;复合型砌体外墙保温砌块砌筑;通长锚拉筋放置;外墙构造柱、过梁、压顶等部位钢筋绑扎,外侧放入挤塑保温板插入固定锚钉,模板安装,浇筑混凝土;砌体与梁底或板底联结。优点在于,二次结构与保温板同步施工,可以在一道工序中完成三道工序的工作任务,大大提高施工效率,降低人力成本,同时避免施工人员多次进行高空作业,降低安全风险。设计施工技术简单,它既节省投资,省工省时省力,满足建筑节能标准的要求又实现了外墙保温与建筑同寿命。
Composite masonry external wall thermal insulation integrated construction method
一种复合型砌体外墙保温一体化施工方法
ZHOU XIAOLIANG (Autor:in) / DU HONGLEI (Autor:in) / TIAN GENG (Autor:in) / JIN GUANGXU (Autor:in) / WEI JIAXIN (Autor:in) / GAO QIAOCHAO (Autor:in)
05.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Construction method of masonry structure external wall insulation board
Europäisches Patentamt | 2022
|Outer wall external thermal insulation integrated construction method
Europäisches Patentamt | 2023
|Manufacturing method of concrete external wall thermal insulation masonry
Europäisches Patentamt | 2023
|Thermal insulation masonry wall structure and construction method thereof
Europäisches Patentamt | 2023
|