Floor slab connecting structure based on fabricated building
According to the floor slab connecting structure based on the fabricated building, the construction workload is small, the construction cost is reduced, the construction period is shortened, worker assembly operation is convenient, and the installation efficiency is high; a plurality of first through holes are sequentially formed in the two ends, located at the upper ends of the cross beams, of the floor slab, first sleeves are arranged in the first through holes, the first sleeves and a reinforcing mesh of the floor slab are fixed and poured together, first studs are inserted into the sleeves, and the ends, close to the cross beams, of the first studs are welded and fixed to the cross beams through a stud welding machine; every two adjacent floor slabs are in lap joint together in a matched and staggered mode through lap joint plates, each lap joint plate is sequentially provided with a plurality of second through holes, second studs are arranged in every two corresponding second through holes, the second studs are welded and fixed to the first supporting steel plate through a stud welding machine, and every two adjacent floor slabs are connected and fixed together; the method can be widely applied to the field of prefabricated buildings.
本发明公开一种基于装配式建筑的楼板连接结构,施工工作量小,降低了施工成本和施工周期,工人装配操作方便,安装效率高;位于横梁上端的楼板的两端上均依次设置有多个第一通孔,第一通孔内均设置有第一套筒,第一套筒与楼板的钢筋网固定并浇筑在一起,套筒内插接有第一螺柱,第一螺柱靠近横梁的一端通过螺柱焊机焊接固定在横梁上;相邻的楼板之间通过彼此的搭接板匹配错位搭接在一起,搭接板上均依次设置有多个第二通孔,两个对应的第二通孔内设置有第二螺柱,第二螺柱通过螺柱焊机焊接固定在第一支撑钢板上,将相邻的两个楼板连接固定在一起;本发明可广泛应用于装配式建筑领域。
Floor slab connecting structure based on fabricated building
According to the floor slab connecting structure based on the fabricated building, the construction workload is small, the construction cost is reduced, the construction period is shortened, worker assembly operation is convenient, and the installation efficiency is high; a plurality of first through holes are sequentially formed in the two ends, located at the upper ends of the cross beams, of the floor slab, first sleeves are arranged in the first through holes, the first sleeves and a reinforcing mesh of the floor slab are fixed and poured together, first studs are inserted into the sleeves, and the ends, close to the cross beams, of the first studs are welded and fixed to the cross beams through a stud welding machine; every two adjacent floor slabs are in lap joint together in a matched and staggered mode through lap joint plates, each lap joint plate is sequentially provided with a plurality of second through holes, second studs are arranged in every two corresponding second through holes, the second studs are welded and fixed to the first supporting steel plate through a stud welding machine, and every two adjacent floor slabs are connected and fixed together; the method can be widely applied to the field of prefabricated buildings.
本发明公开一种基于装配式建筑的楼板连接结构,施工工作量小,降低了施工成本和施工周期,工人装配操作方便,安装效率高;位于横梁上端的楼板的两端上均依次设置有多个第一通孔,第一通孔内均设置有第一套筒,第一套筒与楼板的钢筋网固定并浇筑在一起,套筒内插接有第一螺柱,第一螺柱靠近横梁的一端通过螺柱焊机焊接固定在横梁上;相邻的楼板之间通过彼此的搭接板匹配错位搭接在一起,搭接板上均依次设置有多个第二通孔,两个对应的第二通孔内设置有第二螺柱,第二螺柱通过螺柱焊机焊接固定在第一支撑钢板上,将相邻的两个楼板连接固定在一起;本发明可广泛应用于装配式建筑领域。
Floor slab connecting structure based on fabricated building
基于装配式建筑的楼板连接结构
YANG WENCHAO (Autor:in) / WANG YU (Autor:in)
05.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Floor slab connecting structure of fabricated building
Europäisches Patentamt | 2024
|Floor slab connecting structure based on fabricated building
Europäisches Patentamt | 2023
|Connecting structure of fabricated building wallboard and floor slab
Europäisches Patentamt | 2021
|Floor slab connecting structure of fabricated building and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|