Waterproof roof and construction method thereof
The invention discloses a waterproof roof and a construction method thereof. The waterproof roof comprises a plurality of independent and mutually spliced box bodies, a first waterproof layer, a second waterproof layer and a third waterproof layer. The outer surface of the box body is coated with the first waterproof layer. The second waterproof layers at least cover the outer surfaces of the first waterproof layers of the two adjacent box bodies, and the lap joint position of the two adjacent second waterproof layers and the joint position between the two adjacent first waterproof layers are arranged in a staggered mode. The third waterproof layers at least cover the outer surfaces of the second waterproof layers of the two adjacent box bodies, and the lap joint position of the two adjacent third waterproof layers and the lap joint position of the two adjacent second waterproof layers are arranged in a staggered mode. The technical problem that the waterproof performance of a roof is reduced when an existing building is disassembled, built and transferred is solved.
本申请公开了一种防水屋面及其施工方法,其中防水屋面包括:若干独立且相互拼接的箱体、第一防水层、第二防水层和第三防水层。第一防水层包覆在箱体的外表面。第二防水层至少包覆在相邻两个箱体的第一防水层的外表面,且相邻两个第二防水层的搭接位置与相邻两个第一防水层之间的接缝位置错位设置。第三防水层至少包覆在相邻两个箱体的第二防水层的外表面,且相邻两个第三防水层的搭接位置与相邻两个第二防水层之间的搭接位置错位设置。本申请用于解决现有的建筑在拆建转移时屋面防水性降低的技术问题。
Waterproof roof and construction method thereof
The invention discloses a waterproof roof and a construction method thereof. The waterproof roof comprises a plurality of independent and mutually spliced box bodies, a first waterproof layer, a second waterproof layer and a third waterproof layer. The outer surface of the box body is coated with the first waterproof layer. The second waterproof layers at least cover the outer surfaces of the first waterproof layers of the two adjacent box bodies, and the lap joint position of the two adjacent second waterproof layers and the joint position between the two adjacent first waterproof layers are arranged in a staggered mode. The third waterproof layers at least cover the outer surfaces of the second waterproof layers of the two adjacent box bodies, and the lap joint position of the two adjacent third waterproof layers and the lap joint position of the two adjacent second waterproof layers are arranged in a staggered mode. The technical problem that the waterproof performance of a roof is reduced when an existing building is disassembled, built and transferred is solved.
本申请公开了一种防水屋面及其施工方法,其中防水屋面包括:若干独立且相互拼接的箱体、第一防水层、第二防水层和第三防水层。第一防水层包覆在箱体的外表面。第二防水层至少包覆在相邻两个箱体的第一防水层的外表面,且相邻两个第二防水层的搭接位置与相邻两个第一防水层之间的接缝位置错位设置。第三防水层至少包覆在相邻两个箱体的第二防水层的外表面,且相邻两个第三防水层的搭接位置与相邻两个第二防水层之间的搭接位置错位设置。本申请用于解决现有的建筑在拆建转移时屋面防水性降低的技术问题。
Waterproof roof and construction method thereof
一种防水屋面及其施工方法
CHENG YI (Autor:in) / CHEN XIAOXING (Autor:in) / ZHOU HAIFENG (Autor:in) / ZENG ZHIWEN (Autor:in) / MA LEI (Autor:in)
05.05.2023
Patent
Elektronische Ressource
Chinesisch
Waterproof roof and construction method of waterproof roof
Europäisches Patentamt | 2024
|Waterproof roof and construction method of waterproof roof
Europäisches Patentamt | 2020
|Waterproof roof and construction method of waterproof roof
Europäisches Patentamt | 2021
|Waterproof roof and construction method of waterproof roof
Europäisches Patentamt | 2024
|