Foundation reinforcement building construction method for highway bridge pile foundation
The invention discloses a highway bridge pile foundation reinforcement building construction method, and belongs to the technical field of highway bridge pile foundation building, and the method comprises the following steps: determining the geological condition of a construction position: carrying out preliminary detection in a designated area by using different detection machines, and determining the geological condition information in the construction area; s2, preparation before construction is conducted, specifically, according to different geological conditions in a construction area, tamping treatment is conducted on a construction site, and the approximate position of a pile foundation is obtained through measurement; building an enclosure; foundation pit construction is conducted, specifically, preliminary excavation is conducted on a pre-determined pile foundation, and different excavation modes are adopted according to different geologies; and construction of the supporting device: binding reinforcement cages with corresponding diameters and lengths, vertically sinking the reinforcement cages into the foundation pit, and pouring the reinforcement cages. According to the highway bridge pile foundation reinforcement building construction method, different foundation pit excavation methods can be adopted according to different soil geologies, and therefore it can be guaranteed that corresponding excavation modes are selected according to different rock stratums during pile hole excavation in the working process.
本发明公开了一种公路桥梁桩基基础加固建造施工方法,公路桥梁桩基建造技术领域,确定施工位置的地质情况:对指定区域内用不同的探测机器进行初步的探测,确定施工区域内的地质状况信息;S2、施工前准备:施工根据施工区域内的地质状况不同对施工现场进行夯实处理,测量得到桩基的大致位置;围护搭建;基坑施工:在预先确定的桩基处进行初步挖掘,并根据不同地质的采取不同的挖掘方式;支护装置的搭建:捆绑对应直径以及长度的钢筋笼并垂直沉入到基坑中并浇筑。该公路桥梁桩基基础加固建造施工方法,能根据不同土壤地质采用不同的基坑挖掘方法,从而能在工作过程中能保证据桩孔掘进时根据不同岩层选择对应的挖掘方式。
Foundation reinforcement building construction method for highway bridge pile foundation
The invention discloses a highway bridge pile foundation reinforcement building construction method, and belongs to the technical field of highway bridge pile foundation building, and the method comprises the following steps: determining the geological condition of a construction position: carrying out preliminary detection in a designated area by using different detection machines, and determining the geological condition information in the construction area; s2, preparation before construction is conducted, specifically, according to different geological conditions in a construction area, tamping treatment is conducted on a construction site, and the approximate position of a pile foundation is obtained through measurement; building an enclosure; foundation pit construction is conducted, specifically, preliminary excavation is conducted on a pre-determined pile foundation, and different excavation modes are adopted according to different geologies; and construction of the supporting device: binding reinforcement cages with corresponding diameters and lengths, vertically sinking the reinforcement cages into the foundation pit, and pouring the reinforcement cages. According to the highway bridge pile foundation reinforcement building construction method, different foundation pit excavation methods can be adopted according to different soil geologies, and therefore it can be guaranteed that corresponding excavation modes are selected according to different rock stratums during pile hole excavation in the working process.
本发明公开了一种公路桥梁桩基基础加固建造施工方法,公路桥梁桩基建造技术领域,确定施工位置的地质情况:对指定区域内用不同的探测机器进行初步的探测,确定施工区域内的地质状况信息;S2、施工前准备:施工根据施工区域内的地质状况不同对施工现场进行夯实处理,测量得到桩基的大致位置;围护搭建;基坑施工:在预先确定的桩基处进行初步挖掘,并根据不同地质的采取不同的挖掘方式;支护装置的搭建:捆绑对应直径以及长度的钢筋笼并垂直沉入到基坑中并浇筑。该公路桥梁桩基基础加固建造施工方法,能根据不同土壤地质采用不同的基坑挖掘方法,从而能在工作过程中能保证据桩孔掘进时根据不同岩层选择对应的挖掘方式。
Foundation reinforcement building construction method for highway bridge pile foundation
一种公路桥梁桩基基础加固建造施工方法
SONG RUILI (Autor:in) / WANG SHUYA (Autor:in) / GU YANHUA (Autor:in) / BAI XIAOWEI (Autor:in) / LI GUODONG (Autor:in) / HE DONGDONG (Autor:in) / ZHAO YUN (Autor:in) / LYU HUIJUAN (Autor:in) / KANG LIJIE (Autor:in) / ZHANG KUAN (Autor:in)
09.05.2023
Patent
Elektronische Ressource
Chinesisch
Highway bridge pile foundation reinforcement building construction method
Europäisches Patentamt | 2021
|Construction method of bridge pile foundation on highway
Europäisches Patentamt | 2022
|