Permanent and temporary combined construction method for basement ramp foundation and supporting structure
The invention relates to the technical field of building construction, in particular to a basement ramp foundation and support structure permanent and temporary combination construction method which comprises the following steps: binding construction of a permanent and temporary combination section reinforcement cage; the secant piles are cut for three times, so that the combination of the supporting structure and the fire lane is realized; the permanent and temporary combined construction method for the basement ramp foundation and the supporting structure has the beneficial effects that the supporting structure and the fire lane are combined by cutting off part of the secant piles, the project construction period is shortened on the premise that site construction safety and construction quality are guaranteed, the site is saved, manpower and material resources are saved, construction is convenient and efficient, and the construction period is shortened. Good benefits are obtained in the aspects of project quality, progress, cost, safety and the like.
本发明涉及建筑施工技术领域,具体为一种地下室坡道基础与支护结构永临结合施工方法,所述施工方法包括以下步骤:永临结合段钢筋笼绑扎施工;分三次切割咬合桩,实现支护结构与消防车道的结合;有益效果为:本发明提出的地下室坡道基础与支护结构永临结合施工方法通过对咬合桩的部分切除,实现支护结构与消防车道的结合,在确保现场施工安全和施工质量的前提下,缩短了项目施工工期,节约场地、节省人力物力,施工便捷高效,在项目质量、进度、成本、安全等方面均取得较好的效益。
Permanent and temporary combined construction method for basement ramp foundation and supporting structure
The invention relates to the technical field of building construction, in particular to a basement ramp foundation and support structure permanent and temporary combination construction method which comprises the following steps: binding construction of a permanent and temporary combination section reinforcement cage; the secant piles are cut for three times, so that the combination of the supporting structure and the fire lane is realized; the permanent and temporary combined construction method for the basement ramp foundation and the supporting structure has the beneficial effects that the supporting structure and the fire lane are combined by cutting off part of the secant piles, the project construction period is shortened on the premise that site construction safety and construction quality are guaranteed, the site is saved, manpower and material resources are saved, construction is convenient and efficient, and the construction period is shortened. Good benefits are obtained in the aspects of project quality, progress, cost, safety and the like.
本发明涉及建筑施工技术领域,具体为一种地下室坡道基础与支护结构永临结合施工方法,所述施工方法包括以下步骤:永临结合段钢筋笼绑扎施工;分三次切割咬合桩,实现支护结构与消防车道的结合;有益效果为:本发明提出的地下室坡道基础与支护结构永临结合施工方法通过对咬合桩的部分切除,实现支护结构与消防车道的结合,在确保现场施工安全和施工质量的前提下,缩短了项目施工工期,节约场地、节省人力物力,施工便捷高效,在项目质量、进度、成本、安全等方面均取得较好的效益。
Permanent and temporary combined construction method for basement ramp foundation and supporting structure
一种地下室坡道基础与支护结构永临结合施工方法
WU ZEYUAN (Autor:in) / GAO LIANG (Autor:in) / WANG JIANPENG (Autor:in) / YE ZHOU (Autor:in) / YI ZAN (Autor:in) / CHEN ZHENG (Autor:in) / MEI DINGJIAN (Autor:in) / LI MING (Autor:in)
09.05.2023
Patent
Elektronische Ressource
Chinesisch
Construction method of permanent and temporary combined integral basement ramp
Europäisches Patentamt | 2023
|Permanent and temporary combined basement structure and construction method thereof
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|