Water stop structure for construction joint and construction method of water stop structure
The invention relates to a water stop structure for a construction joint and a construction method of the water stop structure. The water stop structure comprises the construction joint formed at the joint of two adjacent construction bins, and the vertical section of the construction joint is nonlinear; a pit formed below the construction joint is excavated; the extruded sheet is fixed on the bottom surface of the pit and abuts against the bottom of the construction joint; the concrete layer is formed in the concave pit in a pouring mode, and the extruded sheet is embedded in the concrete layer. The method effectively solves the problem that the construction joints are prone to leakage in the construction process of the jump warehouse method, the water stopping effect is improved by optimizing the water stopping structures at the construction joints, the heat dissipation age of bottom plate concrete is increased, and the phenomenon of uneven settlement of concrete between adjacent warehouses is prevented.
本发明涉及一种用于施工缝的止水结构及其施工方法,包括:形成于相邻两个施工仓的连接处的施工缝,施工缝的竖截面呈非直线型;开挖形成于施工缝的下方的凹坑;固定于凹坑的底面且供抵住施工缝的底部的挤塑板;以及浇筑形成于凹坑内的混凝土层,挤塑板埋设于混凝土层内。本发明有效地解决了跳仓法施工过程中施工缝处容易渗漏的问题,通过优化施工缝处的止水结构,以提升止水效果,并增加底板混凝土散热年纪,防止相邻的仓之间出现混凝土不均匀沉降的现象。
Water stop structure for construction joint and construction method of water stop structure
The invention relates to a water stop structure for a construction joint and a construction method of the water stop structure. The water stop structure comprises the construction joint formed at the joint of two adjacent construction bins, and the vertical section of the construction joint is nonlinear; a pit formed below the construction joint is excavated; the extruded sheet is fixed on the bottom surface of the pit and abuts against the bottom of the construction joint; the concrete layer is formed in the concave pit in a pouring mode, and the extruded sheet is embedded in the concrete layer. The method effectively solves the problem that the construction joints are prone to leakage in the construction process of the jump warehouse method, the water stopping effect is improved by optimizing the water stopping structures at the construction joints, the heat dissipation age of bottom plate concrete is increased, and the phenomenon of uneven settlement of concrete between adjacent warehouses is prevented.
本发明涉及一种用于施工缝的止水结构及其施工方法,包括:形成于相邻两个施工仓的连接处的施工缝,施工缝的竖截面呈非直线型;开挖形成于施工缝的下方的凹坑;固定于凹坑的底面且供抵住施工缝的底部的挤塑板;以及浇筑形成于凹坑内的混凝土层,挤塑板埋设于混凝土层内。本发明有效地解决了跳仓法施工过程中施工缝处容易渗漏的问题,通过优化施工缝处的止水结构,以提升止水效果,并增加底板混凝土散热年纪,防止相邻的仓之间出现混凝土不均匀沉降的现象。
Water stop structure for construction joint and construction method of water stop structure
用于施工缝的止水结构及其施工方法
LI WENWU (Autor:in) / YU SHAOLE (Autor:in) / HUANG KAI (Autor:in) / ZHANG DAIBO (Autor:in) / WEN XIANFENG (Autor:in) / QIN JIANXING (Autor:in) / WU GUANGHUI (Autor:in) / ZHOU YANGJIE (Autor:in) / HUANG XIAOWEI (Autor:in) / DING JUNCI (Autor:in)
09.05.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2023
|WATER STOP STRUCTURE AND CONSTRUCTION METHOD OF WATER STOP STRUCTURE
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2015
|Water stop structure and water stop construction method at jump-bay-method joint
Europäisches Patentamt | 2024
|