Engineering foundation dynamic compaction construction method
The invention relates to the technical field of engineering foundations, and particularly discloses a dynamic compaction construction method for an engineering foundation. The method comprises the steps that firstly, the ground of a construction area is cleaned and leveled; step 2, marking the position of a first tamping point according to a construction drawing, and numbering each tamping point; thirdly, a plurality of drainage pipes are laid in a non-ramming-point area of the construction area at intervals, the upper portions of the drainage pipes are leveled, and the elevation of the construction area is measured; fourthly, the crane and the high tower type fog gun machine are arranged at the corresponding positions of a ramming point, and the top elevation of a rammer is measured; 5, the high tower type fog gun machine is started, the rammer is lifted to the preset height, an unhooking device is started, after the rammer is unhooked and freely falls, a lifting hook is put down, and the height of the top of the rammer is measured; sixthly, the seventh step is repeated till the ramming frequency and the control standard of the ramming point meet the requirements; the problem that in the prior art, the dynamic compaction quality can be reduced when water mist is sprayed to a compaction point is solved.
本发明涉及工程地基技术领域,具体公开了一种工程地基强夯施工方法;步骤一、清理施工区域的地面并进行平整;步骤二、按照施工图纸标出第一遍夯点位置,并对每个夯点进行编号;步骤三、在施工区域非夯点区域间隔铺设多个排水管,并对排水管上方进行平整,测量施工区域的高程;步骤四、起重机和高塔式雾炮机设置在夯点对应位置处,测量夯锤顶高程;步骤五、开启高塔式雾炮机,将夯锤起吊到预定高度,开启脱钩装置,待夯锤脱钩自由下落后,放下吊钩,测量锤顶高程;步骤六、重复步骤七,直至夯点的夯击次数和控制标准符合要求;本发明解决了现有技术中夯点喷洒水雾会降低强夯质量的问题。
Engineering foundation dynamic compaction construction method
The invention relates to the technical field of engineering foundations, and particularly discloses a dynamic compaction construction method for an engineering foundation. The method comprises the steps that firstly, the ground of a construction area is cleaned and leveled; step 2, marking the position of a first tamping point according to a construction drawing, and numbering each tamping point; thirdly, a plurality of drainage pipes are laid in a non-ramming-point area of the construction area at intervals, the upper portions of the drainage pipes are leveled, and the elevation of the construction area is measured; fourthly, the crane and the high tower type fog gun machine are arranged at the corresponding positions of a ramming point, and the top elevation of a rammer is measured; 5, the high tower type fog gun machine is started, the rammer is lifted to the preset height, an unhooking device is started, after the rammer is unhooked and freely falls, a lifting hook is put down, and the height of the top of the rammer is measured; sixthly, the seventh step is repeated till the ramming frequency and the control standard of the ramming point meet the requirements; the problem that in the prior art, the dynamic compaction quality can be reduced when water mist is sprayed to a compaction point is solved.
本发明涉及工程地基技术领域,具体公开了一种工程地基强夯施工方法;步骤一、清理施工区域的地面并进行平整;步骤二、按照施工图纸标出第一遍夯点位置,并对每个夯点进行编号;步骤三、在施工区域非夯点区域间隔铺设多个排水管,并对排水管上方进行平整,测量施工区域的高程;步骤四、起重机和高塔式雾炮机设置在夯点对应位置处,测量夯锤顶高程;步骤五、开启高塔式雾炮机,将夯锤起吊到预定高度,开启脱钩装置,待夯锤脱钩自由下落后,放下吊钩,测量锤顶高程;步骤六、重复步骤七,直至夯点的夯击次数和控制标准符合要求;本发明解决了现有技术中夯点喷洒水雾会降低强夯质量的问题。
Engineering foundation dynamic compaction construction method
工程地基强夯施工方法
AO JINHONG (Autor:in) / LUO HUAN (Autor:in) / TAN XIAOFEI (Autor:in) / HE LIANG (Autor:in) / LUO QIAO (Autor:in) / ZHOU YUSHENG (Autor:in)
12.05.2023
Patent
Elektronische Ressource
Chinesisch
Engineering foundation dynamic compaction construction method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Engineering building foundation dynamic compaction construction device and method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2016
|Construction method for foundation dynamic compaction test
Europäisches Patentamt | 2021
|