Combined construction secant pile structure
The invention relates to the technical field of engineering construction, in particular to a combined construction secant pile structure which comprises a first construction pile column and a second construction pile column, and the first construction pile column and the second construction pile column are connected through an adapter pile column. The first construction pile column and the second construction pile column are provided with the pile column meshing grooves, so that the meshing connection effect between the transfer pile column and the first construction pile column and the second construction pile column is good, and the bearing plates are arranged in the pile column meshing grooves, so that a steel bar framework of the transfer pile column can be borne and positioned; therefore, the positioning and bearing stability of the transfer pile column is high, and higher transfer stability can be achieved between the bearing plate and the steel bar structure frame between the transfer pile column during pouring, so that the occlusion stability between the transfer pile column and the first construction pile column and between the transfer pile column and the second construction pile column after pouring is high; and the combined use safety of the transfer pile, the first construction pile and the second construction pile is high during use, so that the engineering construction quality is effectively improved.
本发明涉及工程施工技术领域,具体为一种组合施工的咬合桩结构,包括第一施工桩柱和第二施工桩柱,所述第一施工桩柱和第二施工桩柱之间采用转接桩柱连接;通过第一施工桩柱和第二施工桩柱开设桩柱咬合槽能够使转接桩柱与第一施工桩柱和第二施工桩柱之间的咬合连接效果好,并且在桩柱咬合槽中设置承托板能够实现对转接桩柱的钢筋架构进行承托定位,从而使转接桩柱的定位承托稳定高,并且承托板和转接桩柱之间的钢筋结构架之间在浇筑时能够有较高的转接稳固性,从而使转接桩柱在浇筑后与第一施工桩柱和第二施工桩柱之间的咬合稳定性高,使转接桩柱、第一施工桩柱、第二施工桩柱在使用时的组合使用安全性高,从而有效的提高工程施工质量。
Combined construction secant pile structure
The invention relates to the technical field of engineering construction, in particular to a combined construction secant pile structure which comprises a first construction pile column and a second construction pile column, and the first construction pile column and the second construction pile column are connected through an adapter pile column. The first construction pile column and the second construction pile column are provided with the pile column meshing grooves, so that the meshing connection effect between the transfer pile column and the first construction pile column and the second construction pile column is good, and the bearing plates are arranged in the pile column meshing grooves, so that a steel bar framework of the transfer pile column can be borne and positioned; therefore, the positioning and bearing stability of the transfer pile column is high, and higher transfer stability can be achieved between the bearing plate and the steel bar structure frame between the transfer pile column during pouring, so that the occlusion stability between the transfer pile column and the first construction pile column and between the transfer pile column and the second construction pile column after pouring is high; and the combined use safety of the transfer pile, the first construction pile and the second construction pile is high during use, so that the engineering construction quality is effectively improved.
本发明涉及工程施工技术领域,具体为一种组合施工的咬合桩结构,包括第一施工桩柱和第二施工桩柱,所述第一施工桩柱和第二施工桩柱之间采用转接桩柱连接;通过第一施工桩柱和第二施工桩柱开设桩柱咬合槽能够使转接桩柱与第一施工桩柱和第二施工桩柱之间的咬合连接效果好,并且在桩柱咬合槽中设置承托板能够实现对转接桩柱的钢筋架构进行承托定位,从而使转接桩柱的定位承托稳定高,并且承托板和转接桩柱之间的钢筋结构架之间在浇筑时能够有较高的转接稳固性,从而使转接桩柱在浇筑后与第一施工桩柱和第二施工桩柱之间的咬合稳定性高,使转接桩柱、第一施工桩柱、第二施工桩柱在使用时的组合使用安全性高,从而有效的提高工程施工质量。
Combined construction secant pile structure
一种组合施工的咬合桩结构
ZHANG JUN (Autor:in) / CHENG TAO (Autor:in) / JING HANLIN (Autor:in) / CUI JIAN (Autor:in) / WEI MING (Autor:in)
12.05.2023
Patent
Elektronische Ressource
Chinesisch