Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of strip-shaped channel disc buckle type support and assembly type early-dismantling formwork keel system
The invention relates to a construction method for a strip-shaped channel disc buckle type support and assembly type early-dismantling formwork keel system. The construction method is characterized by comprising the steps that S1, surveying and setting out are conducted; s2, a supporting system is installed; s3, the early-dismantling adjustable support is installed; s4, main beam, secondary beam and plate formwork installation and supporting system acceptance inspection are conducted; s5, mounting and acceptance inspection of a plate formwork; s6, reinforcing steel bar installation and acceptance check; s7, concrete pouring and curing; s8, the formworks and the supports are dismantled; the disc buckle supporting system is optimally arranged, and the performance advantages of the disc buckle frame are exerted to the greatest extent; the support system is built by adopting a socket type disc buckle type steel pipe bracket, so that the arrangement is flexible, safe and reliable; the distance between the vertical rods below the beam and the plate is increased, so that a construction channel without horizontal rods and inclined rods is formed in the supporting frame, and template dismantling, personnel walking and material transportation in the early dismantling system are facilitated; u-steel main edges, batten secondary edges and formworks of the plate early-dismantling system and the later-dismantling plate strip system are prefabricated and formed in advance, a complete set of formwork keel system is installed in an on-site assembly mode, and materials, labor and time are saved.
本发明涉及一种带状通道盘扣式支撑与装配式早拆模板龙骨体系施工方法,其特征在于:包括S1:测量放线;S2:支撑体系安装;S3:早拆可调托撑安装;S4:主梁、次梁、板模板安装及支撑体系验收;S5:板模板安装及验收;S6:钢筋安装及验收;S7:混凝土浇筑、养护;S8:模板及支撑拆除;盘扣支撑体系优化布置,最大发挥盘扣架性能优势;支撑体系搭设采用承插型盘扣式钢管支架,布置灵活、安全可靠;增大梁、板下立杆间距,使得支撑架内形成无水平杆、斜杆的施工通道,方便早拆体系中模板拆除、人员行走及材料运输;板早拆体系及后拆板带体系的槽钢主楞、木方次楞与模板分别提前预制成型,现场装配式安装成套模板龙骨体系,实现省材省工省时。
Construction method of strip-shaped channel disc buckle type support and assembly type early-dismantling formwork keel system
The invention relates to a construction method for a strip-shaped channel disc buckle type support and assembly type early-dismantling formwork keel system. The construction method is characterized by comprising the steps that S1, surveying and setting out are conducted; s2, a supporting system is installed; s3, the early-dismantling adjustable support is installed; s4, main beam, secondary beam and plate formwork installation and supporting system acceptance inspection are conducted; s5, mounting and acceptance inspection of a plate formwork; s6, reinforcing steel bar installation and acceptance check; s7, concrete pouring and curing; s8, the formworks and the supports are dismantled; the disc buckle supporting system is optimally arranged, and the performance advantages of the disc buckle frame are exerted to the greatest extent; the support system is built by adopting a socket type disc buckle type steel pipe bracket, so that the arrangement is flexible, safe and reliable; the distance between the vertical rods below the beam and the plate is increased, so that a construction channel without horizontal rods and inclined rods is formed in the supporting frame, and template dismantling, personnel walking and material transportation in the early dismantling system are facilitated; u-steel main edges, batten secondary edges and formworks of the plate early-dismantling system and the later-dismantling plate strip system are prefabricated and formed in advance, a complete set of formwork keel system is installed in an on-site assembly mode, and materials, labor and time are saved.
本发明涉及一种带状通道盘扣式支撑与装配式早拆模板龙骨体系施工方法,其特征在于:包括S1:测量放线;S2:支撑体系安装;S3:早拆可调托撑安装;S4:主梁、次梁、板模板安装及支撑体系验收;S5:板模板安装及验收;S6:钢筋安装及验收;S7:混凝土浇筑、养护;S8:模板及支撑拆除;盘扣支撑体系优化布置,最大发挥盘扣架性能优势;支撑体系搭设采用承插型盘扣式钢管支架,布置灵活、安全可靠;增大梁、板下立杆间距,使得支撑架内形成无水平杆、斜杆的施工通道,方便早拆体系中模板拆除、人员行走及材料运输;板早拆体系及后拆板带体系的槽钢主楞、木方次楞与模板分别提前预制成型,现场装配式安装成套模板龙骨体系,实现省材省工省时。
Construction method of strip-shaped channel disc buckle type support and assembly type early-dismantling formwork keel system
带状通道盘扣式支撑与装配式早拆模板龙骨体系施工方法
JIANG LIN (Autor:in) / CHEN HAIJUN (Autor:in) / JIANG SHENG (Autor:in) / ZHU JIUHUA (Autor:in) / XU DI (Autor:in) / ZHU ZHIGANG (Autor:in) / SHI LEI (Autor:in) / LI PEIPEI (Autor:in) / LIU XIAOHU (Autor:in) / JIANG TINGTING (Autor:in)
12.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Galvanized steel keel of formwork early-dismantling system
Europäisches Patentamt | 2022
|Adjustable disc buckle type formwork support structure section
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Disc buckle type formwork support and use method thereof
Europäisches Patentamt | 2024
|Fabricated formwork erecting construction method combining plastic formwork and disc buckle support
Europäisches Patentamt | 2023
|