Steel sheet pile construction equipment for underground diaphragm wall construction of water-rich silty-fine sand layer
The invention discloses steel sheet pile construction equipment for underground diaphragm wall construction of a water-rich silty-fine sand layer, and belongs to the technical field of construction.The steel sheet pile construction equipment comprises a base bedplate, a lifting table is arranged above the base bedplate, a guide rail mechanism is arranged at the top end of a conversion disc, a grooving bridge and a tamping bridge are arranged on the guide rail mechanism, and an abrasion cutting assembly is arranged at the bottom end of the grooving bridge; and a tamping mechanism is arranged at the bottom end of the tamping bridge. When the device is used, the conversion motor drives the torsion rotary disc to rotate through the speed reduction wheel disc and the speed reduction belt, the conversion disc rotates back and forth by 180 degrees along with the torsion rotary disc, and the grooving bridge and the tamping bridge can exchange stations back and forth; the folding motor drives the two clamping objective tables to expand towards the two sides through the clamping lead screws at the same time till the grooving bridge and the tamping bridge do not make contact with the corners of the base table plate and the lifting table during torsion, and the abrasion cutting assemblies and the tamping mechanisms on the grooving bridge and the tamping bridge can alternately reach the stations to conduct machining operation.
本发明公开了一种富水粉细砂层地下连续墙施工钢板桩施工设备,属于施工技术领域,包括基台板,所述基台板的上方设置有升降台,转换盘的顶端设置有导轨机构,导轨机构上设置有开槽桥和夯实桥,开槽桥的底端设置有磨切组件,且夯实桥的底端设置有夯实机构。本发明该装置在使用的时候,转换电机通过减速轮盘和减速皮带带动扭力转盘旋转,转换盘跟随扭力转盘来回扭转一百八十度,开槽桥和夯实桥就可以来回调换工位,开槽桥和夯实桥在更换工位之前,合拢电机通过夹合丝杠同时带动两个夹合载物台往两侧扩张,直到开槽桥和夯实桥在扭转的时候不会触碰在基台板和升降台的拐角,开槽桥和夯实桥上的磨切组件和夯实机构可以轮换到达工位实施加工作业。
Steel sheet pile construction equipment for underground diaphragm wall construction of water-rich silty-fine sand layer
The invention discloses steel sheet pile construction equipment for underground diaphragm wall construction of a water-rich silty-fine sand layer, and belongs to the technical field of construction.The steel sheet pile construction equipment comprises a base bedplate, a lifting table is arranged above the base bedplate, a guide rail mechanism is arranged at the top end of a conversion disc, a grooving bridge and a tamping bridge are arranged on the guide rail mechanism, and an abrasion cutting assembly is arranged at the bottom end of the grooving bridge; and a tamping mechanism is arranged at the bottom end of the tamping bridge. When the device is used, the conversion motor drives the torsion rotary disc to rotate through the speed reduction wheel disc and the speed reduction belt, the conversion disc rotates back and forth by 180 degrees along with the torsion rotary disc, and the grooving bridge and the tamping bridge can exchange stations back and forth; the folding motor drives the two clamping objective tables to expand towards the two sides through the clamping lead screws at the same time till the grooving bridge and the tamping bridge do not make contact with the corners of the base table plate and the lifting table during torsion, and the abrasion cutting assemblies and the tamping mechanisms on the grooving bridge and the tamping bridge can alternately reach the stations to conduct machining operation.
本发明公开了一种富水粉细砂层地下连续墙施工钢板桩施工设备,属于施工技术领域,包括基台板,所述基台板的上方设置有升降台,转换盘的顶端设置有导轨机构,导轨机构上设置有开槽桥和夯实桥,开槽桥的底端设置有磨切组件,且夯实桥的底端设置有夯实机构。本发明该装置在使用的时候,转换电机通过减速轮盘和减速皮带带动扭力转盘旋转,转换盘跟随扭力转盘来回扭转一百八十度,开槽桥和夯实桥就可以来回调换工位,开槽桥和夯实桥在更换工位之前,合拢电机通过夹合丝杠同时带动两个夹合载物台往两侧扩张,直到开槽桥和夯实桥在扭转的时候不会触碰在基台板和升降台的拐角,开槽桥和夯实桥上的磨切组件和夯实机构可以轮换到达工位实施加工作业。
Steel sheet pile construction equipment for underground diaphragm wall construction of water-rich silty-fine sand layer
一种富水粉细砂层地下连续墙施工钢板桩施工设备
ZHENG SHUCHAO (Autor:in) / WEI YUANBO (Autor:in) / WANG NING (Autor:in) / YAN XING (Autor:in) / WU QIONG (Autor:in) / ZHANG YUFENG (Autor:in) / SHEN QIANGRU (Autor:in) / CAO HUI (Autor:in) / QIAN WANGPING (Autor:in) / WANG YI (Autor:in)
16.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02F
Baggern
,
DREDGING
Construction method of underground diaphragm wall in water-rich silty-fine sand layer
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Construction method for pile sinking near underground diaphragm wall of sheet-pile wharf
Europäisches Patentamt | 2024
|Water-rich silty-fine sand deep foundation pit water stop construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2021
|