Bridge pier hanging fence construction operation platform
The bridge pier fence hanging construction operation platform comprises a bridge pier, two first fixing frames and two second fixing frames, the first fixing frames and the second fixing frames are connected end to end to form a square platform frame arranged around the bridge pier, and the two ends of each second fixing frame are slidably connected with sliding blocks through sliding grooves; motors are fixedly connected to the middles of the two first fixing frames through bolts, transmission mechanisms are connected to output shafts of the motors, the transmission mechanisms are connected with the fixing anchors through steel wire ropes, and the motors drive the transmission mechanisms to wind the steel wire ropes to lift the first fixing frames; guide wheel mechanisms in sliding contact with the side wall of the pier are fixedly connected to the middle parts of the bottom surfaces of the first fixing frame and the second fixing frame; through arrangement of the guide wheel mechanism, horizontal force generated by the steel wire rope is balanced, the operation platform is more stable in the lifting process, and meanwhile through contact between the guide wheel mechanism and the pier body, the operation platform is prevented from shaking.
本发明公开了一种桥墩吊围栏施工操作平台及施工方法,包括桥墩、两个第一固定架和两个第二固定架,第一固定架和第二固定架首位相接构成一个围绕桥墩设置的方形平台架,第二固定架的两端通过滑槽滑动连接有滑块,两个第一固定架的中部均通过螺栓固定连接有电机,电机的输出轴上连接有传动机构,传动机构与固定锚之间通过钢丝绳连接,电机驱动传动机构收卷钢丝绳来升降第一固定架,第一固定架和第二固定架的底面中部均固定连接有与桥墩侧壁滑动接触的导轮机构;本发明通过导轮机构的设置,平衡钢丝绳产生的水平力,使操作平台在升降过程中更加平稳,同时通过导轮机构与墩身的接触,避免操作平台发生晃动。
Bridge pier hanging fence construction operation platform
The bridge pier fence hanging construction operation platform comprises a bridge pier, two first fixing frames and two second fixing frames, the first fixing frames and the second fixing frames are connected end to end to form a square platform frame arranged around the bridge pier, and the two ends of each second fixing frame are slidably connected with sliding blocks through sliding grooves; motors are fixedly connected to the middles of the two first fixing frames through bolts, transmission mechanisms are connected to output shafts of the motors, the transmission mechanisms are connected with the fixing anchors through steel wire ropes, and the motors drive the transmission mechanisms to wind the steel wire ropes to lift the first fixing frames; guide wheel mechanisms in sliding contact with the side wall of the pier are fixedly connected to the middle parts of the bottom surfaces of the first fixing frame and the second fixing frame; through arrangement of the guide wheel mechanism, horizontal force generated by the steel wire rope is balanced, the operation platform is more stable in the lifting process, and meanwhile through contact between the guide wheel mechanism and the pier body, the operation platform is prevented from shaking.
本发明公开了一种桥墩吊围栏施工操作平台及施工方法,包括桥墩、两个第一固定架和两个第二固定架,第一固定架和第二固定架首位相接构成一个围绕桥墩设置的方形平台架,第二固定架的两端通过滑槽滑动连接有滑块,两个第一固定架的中部均通过螺栓固定连接有电机,电机的输出轴上连接有传动机构,传动机构与固定锚之间通过钢丝绳连接,电机驱动传动机构收卷钢丝绳来升降第一固定架,第一固定架和第二固定架的底面中部均固定连接有与桥墩侧壁滑动接触的导轮机构;本发明通过导轮机构的设置,平衡钢丝绳产生的水平力,使操作平台在升降过程中更加平稳,同时通过导轮机构与墩身的接触,避免操作平台发生晃动。
Bridge pier hanging fence construction operation platform
一种桥墩吊围栏施工操作平台
MEI HUIHAO (Autor:in) / CHEN LONG (Autor:in) / ZHOU XUHUI (Autor:in) / LI MING (Autor:in) / TANG DAKUN (Autor:in) / PENG HAO (Autor:in) / WEN PENG (Autor:in)
23.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Pier top hanging fence for pier of high-speed railway bridge
Europäisches Patentamt | 2020
|Mounting operation platform for hanging fence at top of pier of high-speed railway bridge
Europäisches Patentamt | 2023
|Temporary operation platform for bridge pier column construction
Europäisches Patentamt | 2023
|Pier top hanging fence embedded channel double-hole positioning device
Europäisches Patentamt | 2023
|