Combined rock anchor anchoring system and construction method thereof
The invention discloses a combined rock anchor anchoring system and a construction method thereof.The combined rock anchor anchoring system comprises a front anchor chamber, a rear anchor chamber, a plurality of anchor cable channels and anchor cable assemblies, the front anchor chamber is provided with a first anchor face, a main cable strand is dispersed into a plurality of single cable bodies by a cable dispersing saddle, and the rear anchor chamber is provided with a second anchor face and a third anchor face which are arranged at intervals; each anchor cable channel penetrates through the first anchor surface, the second anchor surface and the third anchor surface, each anchor cable channel comprises a first pre-stressed anchor cable channel section and a second pre-stressed anchor cable channel section, the anchor cable assembly comprises a plurality of first pre-stressed anchor cables and a plurality of second pre-stressed anchor cables, each first pre-stressed anchor cable is arranged on the corresponding first pre-stressed anchor cable channel section, and each second pre-stressed anchor cable is arranged on the corresponding second pre-stressed anchor cable channel section. The upper ends of the second pre-stressed anchor cables are connected with the corresponding single cable bodies, the second pre-stressed anchor cables are arranged on the corresponding second pre-stressed anchor cable channel sections, the upper ends of the second pre-stressed anchor cables are connected with the lower ends of the corresponding first pre-stressed anchor cables, and the lower ends of the second pre-stressed anchor cables are fixed to the rock mass, so that the excavated volume is reduced, the construction cost is reduced, and the construction period is shortened.
本发明公开组合式岩锚锚固系统及其施工方法,组合式岩锚锚固系统包括前锚室、后锚室、多个锚索通道及锚索组件,前锚室有第一锚面,主缆索股被散索鞍分散成多个单索体,后锚室有间隔设置的第二锚面和第三锚面,各锚索通道均贯穿第一锚面、第二锚面及第三锚面,锚索通道包括第一预应力锚索通道段和第二预应力锚索通道段,锚索组件包括多个第一预应力锚索和多个第二预应力锚索,各第一预应力锚索设于对应的第一预应力锚索通道段,其上端与对应的单索体相连,各第二预应力锚索设于对应的第二预应力锚索通道段,其上端与对应的第一预应力锚索的下端相连,各第二预应力锚索的下端固定于岩体,实现减小开挖量,降低工程造价,缩短工期。
Combined rock anchor anchoring system and construction method thereof
The invention discloses a combined rock anchor anchoring system and a construction method thereof.The combined rock anchor anchoring system comprises a front anchor chamber, a rear anchor chamber, a plurality of anchor cable channels and anchor cable assemblies, the front anchor chamber is provided with a first anchor face, a main cable strand is dispersed into a plurality of single cable bodies by a cable dispersing saddle, and the rear anchor chamber is provided with a second anchor face and a third anchor face which are arranged at intervals; each anchor cable channel penetrates through the first anchor surface, the second anchor surface and the third anchor surface, each anchor cable channel comprises a first pre-stressed anchor cable channel section and a second pre-stressed anchor cable channel section, the anchor cable assembly comprises a plurality of first pre-stressed anchor cables and a plurality of second pre-stressed anchor cables, each first pre-stressed anchor cable is arranged on the corresponding first pre-stressed anchor cable channel section, and each second pre-stressed anchor cable is arranged on the corresponding second pre-stressed anchor cable channel section. The upper ends of the second pre-stressed anchor cables are connected with the corresponding single cable bodies, the second pre-stressed anchor cables are arranged on the corresponding second pre-stressed anchor cable channel sections, the upper ends of the second pre-stressed anchor cables are connected with the lower ends of the corresponding first pre-stressed anchor cables, and the lower ends of the second pre-stressed anchor cables are fixed to the rock mass, so that the excavated volume is reduced, the construction cost is reduced, and the construction period is shortened.
本发明公开组合式岩锚锚固系统及其施工方法,组合式岩锚锚固系统包括前锚室、后锚室、多个锚索通道及锚索组件,前锚室有第一锚面,主缆索股被散索鞍分散成多个单索体,后锚室有间隔设置的第二锚面和第三锚面,各锚索通道均贯穿第一锚面、第二锚面及第三锚面,锚索通道包括第一预应力锚索通道段和第二预应力锚索通道段,锚索组件包括多个第一预应力锚索和多个第二预应力锚索,各第一预应力锚索设于对应的第一预应力锚索通道段,其上端与对应的单索体相连,各第二预应力锚索设于对应的第二预应力锚索通道段,其上端与对应的第一预应力锚索的下端相连,各第二预应力锚索的下端固定于岩体,实现减小开挖量,降低工程造价,缩短工期。
Combined rock anchor anchoring system and construction method thereof
组合式岩锚锚固系统及其施工方法
YAN AIGUO (Autor:in) / FAN SHAOCHE (Autor:in) / WANG PENGYU (Autor:in) / WANG XIAOFEI (Autor:in) / XIE ZICHANG (Autor:in) / ZHANG XIAOJIANG (Autor:in) / LUO CHUNLIN (Autor:in) / WANG XI (Autor:in) / LEE WON-JUN (Autor:in) / WANG ZHIPING (Autor:in)
23.05.2023
Patent
Elektronische Ressource
Chinesisch
Novel rock anchor anchoring system and construction method thereof
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2017
|Spiral anchor rod anchoring device and construction method thereof
Europäisches Patentamt | 2020
|Recyclable quick-anchoring anchor rod and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|