Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Fabricated ribbed laminated slab structure
The invention discloses a fabricated ribbed laminated slab structure, which belongs to the technical field of buildings and comprises a first laminated slab body, and a second laminated slab body is arranged on one side of the first laminated slab body. According to the concrete grouting device, grouting is conducted on the interiors of the second grouting hole and the second grouting groove through the external concrete grouting assembly, when concrete mortar in the second grouting groove is saturated, the concrete mortar can flow out to the outer side through the mortar overflowing hole, workers can conveniently observe the grouting state, the phenomena of insufficient grouting and grouting leakage are prevented, and the grouting efficiency is improved after standing for a period of time. After the concrete mortar is hardened and solidified, the fixing blocks and the joint bars are wrapped in the second grouting grooves, at the moment, the first laminated slab body and the second laminated slab body are firmly connected together through the concrete mortar, then the time for formwork erecting, maintenance and formwork dismounting is shortened, the labor intensity and cost of workers are reduced, and the construction efficiency is improved. And the assembling efficiency of the first laminated slab body and the second laminated slab body is also improved, so that the economic benefits of enterprises are improved.
本发明公开了一种装配式带肋叠合板结构,属于建筑技术领域,包括第一叠合板本体,所述第一叠合板本体的一侧设置有第二叠合板本体。本发明中,通过外部混凝土灌浆组件向第二灌浆孔和第二灌浆槽的内部进行灌浆,当第二灌浆槽内部的混凝土砂浆达到饱和时会通过溢浆孔流出至外侧,便于工作人员对灌浆状态进行观察,防止少灌和漏灌现象,静置一段时间,当混凝土砂浆硬化凝固后会将固定块和插筋包裹在第二灌浆槽的内部,此时第一叠合板本体和第二叠合板本体会通过混凝土砂浆牢固连接在一起,进而减少了支模、养护和拆模时间,不仅减少了工作人员的劳动强度和成本,还提高了第一叠合板本体和第二叠合板本体的装配效率,从而提高了企业的经济效益。
Fabricated ribbed laminated slab structure
The invention discloses a fabricated ribbed laminated slab structure, which belongs to the technical field of buildings and comprises a first laminated slab body, and a second laminated slab body is arranged on one side of the first laminated slab body. According to the concrete grouting device, grouting is conducted on the interiors of the second grouting hole and the second grouting groove through the external concrete grouting assembly, when concrete mortar in the second grouting groove is saturated, the concrete mortar can flow out to the outer side through the mortar overflowing hole, workers can conveniently observe the grouting state, the phenomena of insufficient grouting and grouting leakage are prevented, and the grouting efficiency is improved after standing for a period of time. After the concrete mortar is hardened and solidified, the fixing blocks and the joint bars are wrapped in the second grouting grooves, at the moment, the first laminated slab body and the second laminated slab body are firmly connected together through the concrete mortar, then the time for formwork erecting, maintenance and formwork dismounting is shortened, the labor intensity and cost of workers are reduced, and the construction efficiency is improved. And the assembling efficiency of the first laminated slab body and the second laminated slab body is also improved, so that the economic benefits of enterprises are improved.
本发明公开了一种装配式带肋叠合板结构,属于建筑技术领域,包括第一叠合板本体,所述第一叠合板本体的一侧设置有第二叠合板本体。本发明中,通过外部混凝土灌浆组件向第二灌浆孔和第二灌浆槽的内部进行灌浆,当第二灌浆槽内部的混凝土砂浆达到饱和时会通过溢浆孔流出至外侧,便于工作人员对灌浆状态进行观察,防止少灌和漏灌现象,静置一段时间,当混凝土砂浆硬化凝固后会将固定块和插筋包裹在第二灌浆槽的内部,此时第一叠合板本体和第二叠合板本体会通过混凝土砂浆牢固连接在一起,进而减少了支模、养护和拆模时间,不仅减少了工作人员的劳动强度和成本,还提高了第一叠合板本体和第二叠合板本体的装配效率,从而提高了企业的经济效益。
Fabricated ribbed laminated slab structure
一种装配式带肋叠合板结构
ZHAO BIN (Autor:in) / LU BIN (Autor:in) / ZHOU XIAOHUA (Autor:in) / HAO BIN (Autor:in) / HUANG LIYUAN (Autor:in) / ZHOU SIQI (Autor:in)
23.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Manufacturing method of ribbed prestressed laminated slab
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2021
|Ribbed concrete laminated slab and implementation method thereof
Europäisches Patentamt | 2022
|