Construction method for connecting municipal pipeline and inspection well connector
The invention discloses a construction method for connecting a municipal pipeline and an inspection well connector. The construction method comprises the following steps that firstly, a foundation pit is excavated, a foundation is treated, and an inspection well bottom plate is placed; module bricks are laid on the upper side of the inspection well bottom plate, and the module bricks are built to the installation position of the drainage pipeline; then cushion blocks on the lower portion of the drainage pipeline are installed, and a semicircular groove is formed between the two cushion blocks; then a drainage pipeline is placed in the semicircular groove, a cushion block on the lower portion of the drainage pipeline is constructed, the drainage pipeline is vertically fixed and limited, and meanwhile, module bricks continue to be constructed on the two sides of the cushion block; and finally, pouring concrete inside the module bricks, and plastering cement mortar inside and outside the well chamber. The phenomenon that after inspection well construction is completed, a pipeline cannot be connected into the inspection well or the position of a reserved connector is incorrect can be avoided.
本发明公开了一种市政管道与检查井接口连接的施工方法,包括如下步骤:先基坑开挖、地基处理,放置检查井底板;再在检查井底板上侧铺设模块砖,并将模块砖砌筑至排水管道的安装位置;接着安装排水管道下部的垫块,两块垫块之间形成半圆槽;然后在半圆槽中放置排水管道,并进行排水管道下部的垫块的施工,将排水管道进行上下固定限位,同时继续在垫块的两侧进行模块砖的施工;最后模块砖内部的混凝土浇筑,井室内、外水泥砂浆抹面。本发明可以避免检查井施工完成后管道无法接入检查井或预留接口位置不对的现象。
Construction method for connecting municipal pipeline and inspection well connector
The invention discloses a construction method for connecting a municipal pipeline and an inspection well connector. The construction method comprises the following steps that firstly, a foundation pit is excavated, a foundation is treated, and an inspection well bottom plate is placed; module bricks are laid on the upper side of the inspection well bottom plate, and the module bricks are built to the installation position of the drainage pipeline; then cushion blocks on the lower portion of the drainage pipeline are installed, and a semicircular groove is formed between the two cushion blocks; then a drainage pipeline is placed in the semicircular groove, a cushion block on the lower portion of the drainage pipeline is constructed, the drainage pipeline is vertically fixed and limited, and meanwhile, module bricks continue to be constructed on the two sides of the cushion block; and finally, pouring concrete inside the module bricks, and plastering cement mortar inside and outside the well chamber. The phenomenon that after inspection well construction is completed, a pipeline cannot be connected into the inspection well or the position of a reserved connector is incorrect can be avoided.
本发明公开了一种市政管道与检查井接口连接的施工方法,包括如下步骤:先基坑开挖、地基处理,放置检查井底板;再在检查井底板上侧铺设模块砖,并将模块砖砌筑至排水管道的安装位置;接着安装排水管道下部的垫块,两块垫块之间形成半圆槽;然后在半圆槽中放置排水管道,并进行排水管道下部的垫块的施工,将排水管道进行上下固定限位,同时继续在垫块的两侧进行模块砖的施工;最后模块砖内部的混凝土浇筑,井室内、外水泥砂浆抹面。本发明可以避免检查井施工完成后管道无法接入检查井或预留接口位置不对的现象。
Construction method for connecting municipal pipeline and inspection well connector
一种市政管道与检查井接口连接的施工方法
HU JIEMING (Autor:in) / SONG WENZHI (Autor:in) / FAN YE (Autor:in) / ZHANG WEI (Autor:in) / GUO FENG (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Concrete pipeline and inspection well connector connecting device and connecting construction method
Europäisches Patentamt | 2024
|Novel inspection well pipeline connecting structure and connecting method
Europäisches Patentamt | 2024
|Pipeline connecting device for municipal engineering construction
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Inspection well for municipal rainwater and sewage pipeline
Europäisches Patentamt | 2020
|