Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Cement constructional column mold and matched use method of cement constructional column mold and main body structure
The invention discloses a cement constructional column mold and a method for using the cement constructional column mold in cooperation with a main body structure, and relates to a constructional column template, constructional column width adjusting plates (12) are arranged in concave surfaces arranged in the middle of a template (3) on one side and a template (6) on the other side respectively, and springs (13) are arranged on adjusting screws (15) on the outer side faces of the two constructional column width adjusting plates in a sleeving mode. The adjusting screw rod is connected with an adjusting nut (14) after respectively penetrating through adjusting holes (19) formed in the template on one side and the template on the other side; the formwork on one side and the formwork on the other side are buckled on the inner face and the outer face of a constructional column interval (17) reserved on a building wall (5) respectively, the four wall penetrating rods (1) penetrate through wall bodies on the two sides of the constructional column interval of the building wall respectively, and the two ends of the four wall penetrating rods penetrate through fixing holes (20) of side plates (7) of the formwork on one side and the formwork on the other side respectively and then are connected with the locking nuts (2). The width of the constructional column is adjusted through the constructional column width adjusting plates arranged in the middles of the two adjustable formworks correspondingly.
一种水泥构造柱模具以及与主体结构的配合使用方法,涉及一种构造柱模板,一侧模板(3)和另一侧模板(6)中部分别设置的凹面中分别设置有构造柱宽度调节板(12),两构造柱宽度调节板外侧面的调节螺杆(15)上套有弹簧(13),调节螺杆分别穿过一侧模板和另一侧模板设置的调节孔(19)后连接调节螺母(14);一侧模板和另一侧模板分别扣在建筑墙(5)上预留的构造柱间隔(17)内外面上,四根穿墙杆(1)分别穿在建筑墙的构造柱间隔两侧的墙体上,四根穿墙杆两端分别穿过一侧模板和另一侧模板侧板(7)的固定孔(20)后连接锁紧螺母(2);本发明利用可调节两模板中部分别设置的构造柱宽度调节板实现了调节构造柱的宽窄。
Cement constructional column mold and matched use method of cement constructional column mold and main body structure
The invention discloses a cement constructional column mold and a method for using the cement constructional column mold in cooperation with a main body structure, and relates to a constructional column template, constructional column width adjusting plates (12) are arranged in concave surfaces arranged in the middle of a template (3) on one side and a template (6) on the other side respectively, and springs (13) are arranged on adjusting screws (15) on the outer side faces of the two constructional column width adjusting plates in a sleeving mode. The adjusting screw rod is connected with an adjusting nut (14) after respectively penetrating through adjusting holes (19) formed in the template on one side and the template on the other side; the formwork on one side and the formwork on the other side are buckled on the inner face and the outer face of a constructional column interval (17) reserved on a building wall (5) respectively, the four wall penetrating rods (1) penetrate through wall bodies on the two sides of the constructional column interval of the building wall respectively, and the two ends of the four wall penetrating rods penetrate through fixing holes (20) of side plates (7) of the formwork on one side and the formwork on the other side respectively and then are connected with the locking nuts (2). The width of the constructional column is adjusted through the constructional column width adjusting plates arranged in the middles of the two adjustable formworks correspondingly.
一种水泥构造柱模具以及与主体结构的配合使用方法,涉及一种构造柱模板,一侧模板(3)和另一侧模板(6)中部分别设置的凹面中分别设置有构造柱宽度调节板(12),两构造柱宽度调节板外侧面的调节螺杆(15)上套有弹簧(13),调节螺杆分别穿过一侧模板和另一侧模板设置的调节孔(19)后连接调节螺母(14);一侧模板和另一侧模板分别扣在建筑墙(5)上预留的构造柱间隔(17)内外面上,四根穿墙杆(1)分别穿在建筑墙的构造柱间隔两侧的墙体上,四根穿墙杆两端分别穿过一侧模板和另一侧模板侧板(7)的固定孔(20)后连接锁紧螺母(2);本发明利用可调节两模板中部分别设置的构造柱宽度调节板实现了调节构造柱的宽窄。
Cement constructional column mold and matched use method of cement constructional column mold and main body structure
一种水泥构造柱模具以及与主体结构的配合使用方法
HUANG KEZHENG (Autor:in) / ZHANG DAOKUI (Autor:in) / YANG ZHENFENG (Autor:in) / LIU LAIHUI (Autor:in) / YUAN WEI (Autor:in) / HU YUNFENG (Autor:in) / LI XU (Autor:in) / HU SHUANGLONG (Autor:in) / ZHAO SHUAICHAO (Autor:in) / XI WU (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Constructional column mold and construction method of constructional column mold
Europäisches Patentamt | 2024
|Constructional column construction method and constructional column mold
Europäisches Patentamt | 2021
|Electromagnetic constructional column reinforcing mold
Europäisches Patentamt | 2023
|Corner constructional column reinforcing method and mold
Europäisches Patentamt | 2021
|