Leakage wall repairing and blocking method
The invention discloses a leakage wall repairing and blocking method which comprises the following steps: S100, determining a leakage area where leakage occurs in a wall, pretreating the leakage area to expose a structural layer in the wall, and grouting to form a grouting area; s200, after grouting is completed and solidification forming is maintained at the first moment, a groove is formed in the grouting area to form a rough surface groove; s300, the bottom of the rough surface groove is coated with a base layer material, the base layer material is coated with a first waterproof coating, and the first waterproof coating is aired at a second moment; s400, the surface of the first waterproof coating and the inner wall of the rough surface groove are coated with a second waterproof coating; and S500, the second waterproof coating is coated with a mortar layer for leveling treatment. On the premise that damage to the wall is small, the leakage blocking effect is improved, and the problem that a waterproof interface cracks and is damaged due to structural deformation is effectively solved.
本发明公开了一种渗漏墙体修堵方法,包括如下步骤:S100、确定墙体出现渗漏的渗漏区域,对所述渗漏区域进行预处理以露出墙体内部的结构层并进行注浆以形成注浆区域;S200、在注浆完成维持第一时刻凝固成型之后,在所述注浆区域处开槽以形成毛面凹槽;S300、对所述毛面凹槽底部涂刷基层材料,在所述基层材料上涂刷第一防水涂层并晾放第二时刻;S400、在所述第一防水涂层表面和所述毛面凹槽内壁涂刷第二防水涂层;S500、在所述第二防水涂层上涂抹砂浆层进行找平处理。本发明在对墙体损伤较小的前提下提高了渗漏封堵效果,有效的解决了因结构变形所导致的防水界面开裂破坏问题。
Leakage wall repairing and blocking method
The invention discloses a leakage wall repairing and blocking method which comprises the following steps: S100, determining a leakage area where leakage occurs in a wall, pretreating the leakage area to expose a structural layer in the wall, and grouting to form a grouting area; s200, after grouting is completed and solidification forming is maintained at the first moment, a groove is formed in the grouting area to form a rough surface groove; s300, the bottom of the rough surface groove is coated with a base layer material, the base layer material is coated with a first waterproof coating, and the first waterproof coating is aired at a second moment; s400, the surface of the first waterproof coating and the inner wall of the rough surface groove are coated with a second waterproof coating; and S500, the second waterproof coating is coated with a mortar layer for leveling treatment. On the premise that damage to the wall is small, the leakage blocking effect is improved, and the problem that a waterproof interface cracks and is damaged due to structural deformation is effectively solved.
本发明公开了一种渗漏墙体修堵方法,包括如下步骤:S100、确定墙体出现渗漏的渗漏区域,对所述渗漏区域进行预处理以露出墙体内部的结构层并进行注浆以形成注浆区域;S200、在注浆完成维持第一时刻凝固成型之后,在所述注浆区域处开槽以形成毛面凹槽;S300、对所述毛面凹槽底部涂刷基层材料,在所述基层材料上涂刷第一防水涂层并晾放第二时刻;S400、在所述第一防水涂层表面和所述毛面凹槽内壁涂刷第二防水涂层;S500、在所述第二防水涂层上涂抹砂浆层进行找平处理。本发明在对墙体损伤较小的前提下提高了渗漏封堵效果,有效的解决了因结构变形所导致的防水界面开裂破坏问题。
Leakage wall repairing and blocking method
一种渗漏墙体修堵方法
DONG TIANCI (Autor:in) / CHAI XINGGUANG (Autor:in) / GU LIYING (Autor:in) / LI JUN (Autor:in) / QIAN JIADONG (Autor:in)
30.05.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Europäisches Patentamt | 2015
|Exterior wall construction joint leakage repairing process
Europäisches Patentamt | 2022
|Old retaining wall and septic tank leakage repairing method
Europäisches Patentamt | 2023
|