Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Complex steel structure high-altitude construction structure and construction method thereof
The invention relates to a complex steel structure high-altitude construction structure and a construction method thereof.The complex steel structure high-altitude construction structure comprises a traction mechanism arranged at the top of a roof truss, a steel structure and a connecting frame fixedly connected to the inner wall of the top of the roof truss, a fixing plate in the traction mechanism is fixedly connected to the top of the roof truss, and a winch and a fixed pulley are fixedly connected to the upper surface of the fixing plate; the upper surface of the fixing plate is further provided with an anti-slip assembly used for preventing an output rope of the winch from breaking and sliding. A connecting buckle is fixedly connected to the top of a first hanging ring on the top of the steel structure, an auxiliary hanging rope is fixedly connected to the top of the connecting buckle, a second hanging ring for fixing the steel structure is fixedly connected to the circumference of the top of the steel structure, and balance steel wires are fixedly connected between the second hanging ring and the connecting buckle. The top of each second lifting ring is fixedly connected with a first steel wire rope for lifting the steel structure; the problems that in the prior art, a steel structure shakes in the high-altitude hoisting process, and danger is likely to happen are solved; and when hoisting in-place connection is carried out, adjustment cannot be carried out due to installation errors.
本发明涉及一种复杂钢结构高空施工结构及其施工方法,包括设置在屋顶架顶部的牵引机构、钢结构和固定连接在屋顶架顶部内壁的连接架,牵引机构中固定板固定连接在屋顶架的顶部,固定板的上表面固定连接有卷扬机和定滑轮,固定板的上表面还设有防止卷扬机输出绳断裂滑动用的防溜组件;钢结构的顶部第一吊环的顶部固定连接有连接扣,连接扣的顶部固定连接有辅助吊绳,钢结构顶部的圆周固定连接有对钢结构进行固定用的第二吊环,第二吊环与连接扣之间均固定连接有平衡钢丝,第二吊环的顶部均固定连接有对钢结构进行吊装用的第一钢丝绳;解决现有技术中钢结构高空吊装过程中发生晃动,容易发生危险;吊装到位连接时,因安装误差而无法调整的问题。
Complex steel structure high-altitude construction structure and construction method thereof
The invention relates to a complex steel structure high-altitude construction structure and a construction method thereof.The complex steel structure high-altitude construction structure comprises a traction mechanism arranged at the top of a roof truss, a steel structure and a connecting frame fixedly connected to the inner wall of the top of the roof truss, a fixing plate in the traction mechanism is fixedly connected to the top of the roof truss, and a winch and a fixed pulley are fixedly connected to the upper surface of the fixing plate; the upper surface of the fixing plate is further provided with an anti-slip assembly used for preventing an output rope of the winch from breaking and sliding. A connecting buckle is fixedly connected to the top of a first hanging ring on the top of the steel structure, an auxiliary hanging rope is fixedly connected to the top of the connecting buckle, a second hanging ring for fixing the steel structure is fixedly connected to the circumference of the top of the steel structure, and balance steel wires are fixedly connected between the second hanging ring and the connecting buckle. The top of each second lifting ring is fixedly connected with a first steel wire rope for lifting the steel structure; the problems that in the prior art, a steel structure shakes in the high-altitude hoisting process, and danger is likely to happen are solved; and when hoisting in-place connection is carried out, adjustment cannot be carried out due to installation errors.
本发明涉及一种复杂钢结构高空施工结构及其施工方法,包括设置在屋顶架顶部的牵引机构、钢结构和固定连接在屋顶架顶部内壁的连接架,牵引机构中固定板固定连接在屋顶架的顶部,固定板的上表面固定连接有卷扬机和定滑轮,固定板的上表面还设有防止卷扬机输出绳断裂滑动用的防溜组件;钢结构的顶部第一吊环的顶部固定连接有连接扣,连接扣的顶部固定连接有辅助吊绳,钢结构顶部的圆周固定连接有对钢结构进行固定用的第二吊环,第二吊环与连接扣之间均固定连接有平衡钢丝,第二吊环的顶部均固定连接有对钢结构进行吊装用的第一钢丝绳;解决现有技术中钢结构高空吊装过程中发生晃动,容易发生危险;吊装到位连接时,因安装误差而无法调整的问题。
Complex steel structure high-altitude construction structure and construction method thereof
一种复杂钢结构高空施工结构及其施工方法
WANG XIAOLIN (Autor:in) / ZHANG MING (Autor:in) / LI ZI'ANG (Autor:in) / MA YUEYANG (Autor:in) / MIAO FENG (Autor:in) / YANG XU (Autor:in) / LIU TIANAN (Autor:in) / WANG WEI (Autor:in) / ZHAO QIANG (Autor:in)
02.06.2023
Patent
Elektronische Ressource
Chinesisch
High-altitude bulk construction method for steel-structure grid
Europäisches Patentamt | 2015
|Construction method of large-span high-altitude steel structure
Europäisches Patentamt | 2020
|High-altitude roof large-span steel structure construction device and construction method
Europäisches Patentamt | 2023
|Steel structure high-altitude suspended ceiling construction platform
Europäisches Patentamt | 2024
|Construction method of large-span steel structure high-altitude construction operation equipment
Europäisches Patentamt | 2023
|