Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Slurry protection wall drilling sediment treatment device for building pile foundation and use method
The invention relates to the field of drilling sediment treatment, in particular to a slurry protection wall drilling sediment treatment device for a building pile foundation, which comprises a support cylinder, a partition plate is fixedly connected to the lower part of the inner wall of the support cylinder, a motor is fixedly connected to the inner wall of the support cylinder, and a protection wall mechanism is movably connected between the top of the partition plate and the inner wall of the support cylinder. The mud protection wall drilling sediment treatment device for the building pile foundation is composed of a wall protection mechanism, a deslagging mechanism and a water spraying mechanism. The motor drives the auger rod to rotate, the arc-shaped guide plate rotates synchronously, at the moment, the plane of the bottom of the arc-shaped guide plate shovels sludge attached to the bottom of the hole bottom, and the shoveled sludge gradually rises to the position of the auger rod along the arc face of the arc-shaped guide plate in the rotating process; in the rotating process of the auger rod, sludge in the hole bottom is smashed, conveyed to the upper portion of the auger sleeve and pumped out through the sludge pumping pipe, the situation that sticky sludge adheres to the hole bottom and is not convenient to remove is avoided, and the removing quality is improved.
本发明涉及钻孔沉渣处理领域,具体为一种建筑桩基用泥浆护壁钻孔沉渣处理装置,包括支撑筒,所述支撑筒内壁的下部固定连接有隔板,所述支撑筒的内壁固定连接有电机,所述隔板的顶部与支撑筒的内壁之间活动连接有护壁机构。该一种建筑桩基用泥浆护壁钻孔沉渣处理装置及使用方法由护壁机构、除渣机构和喷水机构组成;通过电机带着蛟龙杆转动,弧形导板同步旋转,此时弧形导板底部的平面对孔底底部粘附的泥渣进行铲除,铲除后的泥渣顺着旋转过程中弧形导板的弧面逐渐上升至蛟龙杆位置,在蛟龙杆转动过程中将孔底内的泥渣进行粉碎并向蛟龙套的上部输送,由抽渣管抽出,避免粘性泥渣粘附在孔底不方便清除,提升清除质量。
Slurry protection wall drilling sediment treatment device for building pile foundation and use method
The invention relates to the field of drilling sediment treatment, in particular to a slurry protection wall drilling sediment treatment device for a building pile foundation, which comprises a support cylinder, a partition plate is fixedly connected to the lower part of the inner wall of the support cylinder, a motor is fixedly connected to the inner wall of the support cylinder, and a protection wall mechanism is movably connected between the top of the partition plate and the inner wall of the support cylinder. The mud protection wall drilling sediment treatment device for the building pile foundation is composed of a wall protection mechanism, a deslagging mechanism and a water spraying mechanism. The motor drives the auger rod to rotate, the arc-shaped guide plate rotates synchronously, at the moment, the plane of the bottom of the arc-shaped guide plate shovels sludge attached to the bottom of the hole bottom, and the shoveled sludge gradually rises to the position of the auger rod along the arc face of the arc-shaped guide plate in the rotating process; in the rotating process of the auger rod, sludge in the hole bottom is smashed, conveyed to the upper portion of the auger sleeve and pumped out through the sludge pumping pipe, the situation that sticky sludge adheres to the hole bottom and is not convenient to remove is avoided, and the removing quality is improved.
本发明涉及钻孔沉渣处理领域,具体为一种建筑桩基用泥浆护壁钻孔沉渣处理装置,包括支撑筒,所述支撑筒内壁的下部固定连接有隔板,所述支撑筒的内壁固定连接有电机,所述隔板的顶部与支撑筒的内壁之间活动连接有护壁机构。该一种建筑桩基用泥浆护壁钻孔沉渣处理装置及使用方法由护壁机构、除渣机构和喷水机构组成;通过电机带着蛟龙杆转动,弧形导板同步旋转,此时弧形导板底部的平面对孔底底部粘附的泥渣进行铲除,铲除后的泥渣顺着旋转过程中弧形导板的弧面逐渐上升至蛟龙杆位置,在蛟龙杆转动过程中将孔底内的泥渣进行粉碎并向蛟龙套的上部输送,由抽渣管抽出,避免粘性泥渣粘附在孔底不方便清除,提升清除质量。
Slurry protection wall drilling sediment treatment device for building pile foundation and use method
一种建筑桩基用泥浆护壁钻孔沉渣处理装置及使用方法
JANG JIN-HO (Autor:in) / XU LIFENG (Autor:in) / JIANG HUAJUN (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Narrow space slurry protection wall drilling pile construction method
Europäisches Patentamt | 2022
|Building pile foundation bottom sediment treatment and reinforcement construction method
Europäisches Patentamt | 2022
|Wall protection slurry in uplift pile construction and preparation method of wall protection slurry
Europäisches Patentamt | 2023
|Protection device for building pile foundation construction
Europäisches Patentamt | 2021
|Wall protection slurry for cast-in-situ bored pile and preparation method of wall protection slurry
Europäisches Patentamt | 2024
|