Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Constructional engineering handling frame with protective cage ladder stand and using method of constructional engineering handling frame
The invention discloses a constructional engineering handling frame with a protective cage ladder stand and a using method thereof.The constructional engineering handling frame comprises a bearing bottom frame, four self-adjusting wheel sets, a lifting assembly, a reinforcing supporting assembly, an auxiliary supporting piece and a protective cage ladder stand piece; the four self-adjusting wheel sets are symmetrically installed on the front side and the rear side of the load-bearing bottom frame, the lifting assembly is installed on the upper side of the load-bearing bottom frame, the reinforcing supporting assembly and the auxiliary supporting piece are installed between the load-bearing bottom frame and the lifting assembly, and the protection cage ladder climbing piece is installed between the lifting assembly and the reinforcing supporting assembly in a hinged mode.
本申请公开了一种带有护笼爬梯的建筑工程操作架及其使用方法,该建筑工程操作架包括承重底架、自调节轮组、升降组件、加固支撑组件、辅助支撑件和护笼爬梯件,自调节轮组设置有四组,四组自调节轮组呈对称结构安装于承重底架的前后两侧,升降组件安装于承重底架的上侧,加固支撑组件及辅助支撑件安装于承重底架与升降组件之间,护笼爬梯件铰接安装于升降组件与加固支撑组件之间。
Constructional engineering handling frame with protective cage ladder stand and using method of constructional engineering handling frame
The invention discloses a constructional engineering handling frame with a protective cage ladder stand and a using method thereof.The constructional engineering handling frame comprises a bearing bottom frame, four self-adjusting wheel sets, a lifting assembly, a reinforcing supporting assembly, an auxiliary supporting piece and a protective cage ladder stand piece; the four self-adjusting wheel sets are symmetrically installed on the front side and the rear side of the load-bearing bottom frame, the lifting assembly is installed on the upper side of the load-bearing bottom frame, the reinforcing supporting assembly and the auxiliary supporting piece are installed between the load-bearing bottom frame and the lifting assembly, and the protection cage ladder climbing piece is installed between the lifting assembly and the reinforcing supporting assembly in a hinged mode.
本申请公开了一种带有护笼爬梯的建筑工程操作架及其使用方法,该建筑工程操作架包括承重底架、自调节轮组、升降组件、加固支撑组件、辅助支撑件和护笼爬梯件,自调节轮组设置有四组,四组自调节轮组呈对称结构安装于承重底架的前后两侧,升降组件安装于承重底架的上侧,加固支撑组件及辅助支撑件安装于承重底架与升降组件之间,护笼爬梯件铰接安装于升降组件与加固支撑组件之间。
Constructional engineering handling frame with protective cage ladder stand and using method of constructional engineering handling frame
一种带有护笼爬梯的建筑工程操作架及其使用方法
GAO LIJIAO (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Protective structure of constructional engineering supporting frame body
Europäisches Patentamt | 2024
|