Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building wall deformation joint construction device and method
The invention relates to a building wall deformation joint construction device and method.The building wall deformation joint construction device comprises traction equipment, a mortar storage box installed on the traction equipment, a grouting pipe with one end connected with the mortar storage box and a guide sliding plate installed on the traction equipment; the guide sliding plate is used for being inserted into the deformation joint in the length direction perpendicular to the deformation joint and is in sliding connection with the peripheral wall of the deformation joint, the other end of the grouting pipe is connected with a grouting head, and the grouting head and the guide sliding plate are oppositely arranged in the length direction of the deformation joint. When the traction equipment moves in the length direction of the deformation joint, the grouting head can inject mortar into the deformation joint, and the guide sliding plate slidably abuts against the peripheral wall of the deformation joint, so that the moving direction of the traction equipment is guided, and the probability that the moving track of the traction equipment deviates is reduced; the mortar leakage frequency of the deformation joint during waterproof mortar pouring is reduced, and the construction speed of the deformation joint is increased while the cost is saved.
本申请涉及一种建筑墙体变形缝施工装置及方法,一种建筑墙体变形缝施工装置,包括牵引设备、安装在牵引设备上的砂浆储存箱、一端连接砂浆储存箱的注浆管和安装在牵引设备上的导向滑板,导向滑板用于沿垂直于变形缝的长度方向插入变形缝并与变形缝周壁滑动连接,注浆管的另一端连接有注浆头,注浆头和导向滑板沿变形缝的长度方向相对布设。本申请当牵引设备沿变形缝的长度方向移动时,注浆头能够将砂浆注入变形缝内,导向滑板与变形缝的周壁滑动抵接,从而对牵引设备的移动方向进行导向,减小牵引设备的移动轨迹发生偏移的概率,减少变形缝在浇筑防水砂浆时出现漏浆的次数,节省成本的同时提高变形缝的施工速度。
Building wall deformation joint construction device and method
The invention relates to a building wall deformation joint construction device and method.The building wall deformation joint construction device comprises traction equipment, a mortar storage box installed on the traction equipment, a grouting pipe with one end connected with the mortar storage box and a guide sliding plate installed on the traction equipment; the guide sliding plate is used for being inserted into the deformation joint in the length direction perpendicular to the deformation joint and is in sliding connection with the peripheral wall of the deformation joint, the other end of the grouting pipe is connected with a grouting head, and the grouting head and the guide sliding plate are oppositely arranged in the length direction of the deformation joint. When the traction equipment moves in the length direction of the deformation joint, the grouting head can inject mortar into the deformation joint, and the guide sliding plate slidably abuts against the peripheral wall of the deformation joint, so that the moving direction of the traction equipment is guided, and the probability that the moving track of the traction equipment deviates is reduced; the mortar leakage frequency of the deformation joint during waterproof mortar pouring is reduced, and the construction speed of the deformation joint is increased while the cost is saved.
本申请涉及一种建筑墙体变形缝施工装置及方法,一种建筑墙体变形缝施工装置,包括牵引设备、安装在牵引设备上的砂浆储存箱、一端连接砂浆储存箱的注浆管和安装在牵引设备上的导向滑板,导向滑板用于沿垂直于变形缝的长度方向插入变形缝并与变形缝周壁滑动连接,注浆管的另一端连接有注浆头,注浆头和导向滑板沿变形缝的长度方向相对布设。本申请当牵引设备沿变形缝的长度方向移动时,注浆头能够将砂浆注入变形缝内,导向滑板与变形缝的周壁滑动抵接,从而对牵引设备的移动方向进行导向,减小牵引设备的移动轨迹发生偏移的概率,减少变形缝在浇筑防水砂浆时出现漏浆的次数,节省成本的同时提高变形缝的施工速度。
Building wall deformation joint construction device and method
一种建筑墙体变形缝施工装置及方法
LIU FUCHANG (Autor:in) / REN XIA (Autor:in) / YE YIZHU (Autor:in)
06.06.2023
Patent
Elektronische Ressource
Chinesisch
Building wall deformation joint construction device and method
Europäisches Patentamt | 2022
|Building wall deformation joint construction treatment device
Europäisches Patentamt | 2022
|Building wall deformation joint construction structure
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|