Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Lime-bound macadam paving device for road base construction and construction method of lime-bound macadam paving device
The invention relates to the technical field of road construction, in particular to a marl-bound macadam paving device for road base construction and a construction method.The marl-bound macadam paving device for road base construction comprises a vehicle body, a storage hopper, a discharging assembly and a flattening assembly, the storage hopper is arranged on the vehicle body, and the discharging assembly comprises a box body; the top of the box body is communicated with the storage hopper, a discharging port is formed in the bottom of the box body, multiple layers of material distributing plates are arranged in the box body, a plurality of discharging holes are formed in the material distributing plates, the lengths of the material distributing plates are gradually increased from the top of the box body to the bottom of the box body, and materials in the storage hopper fall onto the material distributing plate on the uppermost layer. The box body is provided with a moving part used for driving the material distributing plate to move in a reciprocating mode, the material distributing plate is provided with an opening and closing part used for controlling the opening and closing degree of the discharging holes, and the flattening assembly is used for flattening materials discharged out of the discharging opening. The gravel paving device has the effect that gravel of different sizes can be paved more uniformly and flatly.
本申请涉及道路施工技术领域,尤其是涉及一种道路基层施工用泥灰结碎石铺料装置及施工方法,道路基层施工用泥灰结碎石铺料装置包括车体、储料斗、出料组件和摊平组件,所述储料斗设置在车体上,所述出料组件包括箱体,所述箱体的顶部与储料斗连通,所述箱体的底部开设有出料口,所述箱体内设置有多层分料板,所述分料板上开设有若干出料孔,所述分料板的长度从箱体的顶部朝向底部逐渐增加,所述储料斗内的物料掉落到最上层分料板上,所述箱体上设置有用于驱使分料板往复移动的移动件,所述分料板上设置有用于控制出料孔启闭程度的启闭件,所述摊平组件用于将出料口排出的物料摊平。本申请具有将不同尺寸碎石铺设得更加均匀平整的效果。
Lime-bound macadam paving device for road base construction and construction method of lime-bound macadam paving device
The invention relates to the technical field of road construction, in particular to a marl-bound macadam paving device for road base construction and a construction method.The marl-bound macadam paving device for road base construction comprises a vehicle body, a storage hopper, a discharging assembly and a flattening assembly, the storage hopper is arranged on the vehicle body, and the discharging assembly comprises a box body; the top of the box body is communicated with the storage hopper, a discharging port is formed in the bottom of the box body, multiple layers of material distributing plates are arranged in the box body, a plurality of discharging holes are formed in the material distributing plates, the lengths of the material distributing plates are gradually increased from the top of the box body to the bottom of the box body, and materials in the storage hopper fall onto the material distributing plate on the uppermost layer. The box body is provided with a moving part used for driving the material distributing plate to move in a reciprocating mode, the material distributing plate is provided with an opening and closing part used for controlling the opening and closing degree of the discharging holes, and the flattening assembly is used for flattening materials discharged out of the discharging opening. The gravel paving device has the effect that gravel of different sizes can be paved more uniformly and flatly.
本申请涉及道路施工技术领域,尤其是涉及一种道路基层施工用泥灰结碎石铺料装置及施工方法,道路基层施工用泥灰结碎石铺料装置包括车体、储料斗、出料组件和摊平组件,所述储料斗设置在车体上,所述出料组件包括箱体,所述箱体的顶部与储料斗连通,所述箱体的底部开设有出料口,所述箱体内设置有多层分料板,所述分料板上开设有若干出料孔,所述分料板的长度从箱体的顶部朝向底部逐渐增加,所述储料斗内的物料掉落到最上层分料板上,所述箱体上设置有用于驱使分料板往复移动的移动件,所述分料板上设置有用于控制出料孔启闭程度的启闭件,所述摊平组件用于将出料口排出的物料摊平。本申请具有将不同尺寸碎石铺设得更加均匀平整的效果。
Lime-bound macadam paving device for road base construction and construction method of lime-bound macadam paving device
一种道路基层施工用泥灰结碎石铺料装置及施工方法
GUO XIAOGANG (Autor:in) / WU XIAOLING (Autor:in) / DAI MINGFU (Autor:in) / CHEN MUJUN (Autor:in) / GUO HONG (Autor:in) / LIANG NING (Autor:in) / LIU XIAOLIN (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Construction paving device for cement stabilized macadam base
Europäisches Patentamt | 2024
|Macadam double-layer continuous paving device for road construction
Europäisches Patentamt | 2020
|Paving and compacting device for cement stabilized macadam base construction
Europäisches Patentamt | 2021
|