Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Intelligent snow melting traffic signboard
The invention discloses an intelligent snow melting traffic signboard which comprises a supporting column, a snow melting device and a control device. The bottom of the supporting column is connected with a foundation. The two supporting insertion blocks are connected to the top of the supporting column in a spaced mode; the two signboard limiting beams are connected with the supporting insertion blocks in a one-to-one mode, the signboard limiting beams are arranged in parallel at intervals, and a first space is formed between the signboard limiting beams; the signboard body is connected between the signboard limiting beams and arranged in the first space, one end of the signboard body and the supporting column are arranged in a spaced mode, and a sign area is arranged on the side wall of one side of the signboard body; the heating part is connected to the other side of the signboard body and the signboard limiting beam and used for heating the signboard body and melting fallen snow; therefore, the technical problem that a driver cannot see the signboard clearly due to the fact that snow covers the traffic signboard, and potential safety hazards exist is solved.
本发明公开了一种智能融雪交通标志牌,包括:一支撑柱,底部与地基连接;两个支撑插块,间隔连接在支撑柱的顶部上;两个标志牌限位梁,一对一与支撑插块连接,标志牌限位梁平行间隔设置,标志牌限位梁之间具有第一空间;一标志牌本体,连接在标志牌限位梁之间,设置在第一空间处,并且一端与支撑柱间隔设置,标志牌本体的一侧侧壁上具有标志区域;以及一加热部,连接在标志牌本体的另一侧和标志牌限位梁上,用于对标志牌本体进行加热,融化落雪;从而克服了落雪覆盖交通标志牌导致司机看不清标志牌,存在安全隐患的技术问题。
Intelligent snow melting traffic signboard
The invention discloses an intelligent snow melting traffic signboard which comprises a supporting column, a snow melting device and a control device. The bottom of the supporting column is connected with a foundation. The two supporting insertion blocks are connected to the top of the supporting column in a spaced mode; the two signboard limiting beams are connected with the supporting insertion blocks in a one-to-one mode, the signboard limiting beams are arranged in parallel at intervals, and a first space is formed between the signboard limiting beams; the signboard body is connected between the signboard limiting beams and arranged in the first space, one end of the signboard body and the supporting column are arranged in a spaced mode, and a sign area is arranged on the side wall of one side of the signboard body; the heating part is connected to the other side of the signboard body and the signboard limiting beam and used for heating the signboard body and melting fallen snow; therefore, the technical problem that a driver cannot see the signboard clearly due to the fact that snow covers the traffic signboard, and potential safety hazards exist is solved.
本发明公开了一种智能融雪交通标志牌,包括:一支撑柱,底部与地基连接;两个支撑插块,间隔连接在支撑柱的顶部上;两个标志牌限位梁,一对一与支撑插块连接,标志牌限位梁平行间隔设置,标志牌限位梁之间具有第一空间;一标志牌本体,连接在标志牌限位梁之间,设置在第一空间处,并且一端与支撑柱间隔设置,标志牌本体的一侧侧壁上具有标志区域;以及一加热部,连接在标志牌本体的另一侧和标志牌限位梁上,用于对标志牌本体进行加热,融化落雪;从而克服了落雪覆盖交通标志牌导致司机看不清标志牌,存在安全隐患的技术问题。
Intelligent snow melting traffic signboard
一种智能融雪交通标志牌
YANG JINSHUN (Autor:in) / ZHENG YUNHAO (Autor:in) / JIANG YANHUA (Autor:in) / PAN FUQUAN (Autor:in) / LIU JI (Autor:in) / ZHANG TONG (Autor:in) / WANG YUQING (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
B08B
Reinigen allgemein
,
CLEANING IN GENERAL
/
H05B
ELECTRIC HEATING
,
Elektrische Heizung