Steel structure scaffold for constructional engineering
The invention discloses a steel structure scaffold for constructional engineering, and relates to the technical field of building auxiliary equipment, the steel structure scaffold comprises a plurality of vertically arranged support columns and a plurality of horizontally arranged cross rods; the supporting columns and the transverse rods are fixed together through connecting pieces. The connecting piece comprises a reinforcing rod, and the reinforcing rod is connected with the supporting column through a first screw. Grooves are formed in the two ends of the transverse rod, and the supporting columns penetrate through the grooves. A plurality of positioning holes are formed in the side wall of the supporting column, a plurality of positioning rods are fixedly connected to the side, close to the supporting column, of the reinforcing rod, and the positioning rods are in sliding fit with the positioning holes; according to the device, when the cross rod is disassembled, only first screws at the two ends of the reinforcing rod need to be screwed out, then the reinforcing rod is taken out of the grooves in the two ends of the cross rod, at the moment, the positioning rod leaves the positioning hole, then the cross rod is taken out of the top of the annular supporting plate, and disassembly of the cross rod and the supporting column is completed.
本发明公开了一种建筑工程用钢构脚手架,涉及建筑辅助设备技术领域,包括多根竖直设置的支撑柱和多根水平设置的横杆;所述支撑柱与横杆之间通过连接件固定在一起;所述连接件包括加固杆,所述加固杆与支撑柱之间通过一号螺钉连接;所述横杆的两端开设有凹槽,所述支撑柱贯穿凹槽;所述支撑柱侧壁开设有多个定位孔,所述加固杆在靠近支撑柱的一侧固接有多个定位杆,所述定位杆与定位孔滑动配合;本发明中,在拆卸横杆时,只需要先拧出加固杆两端的一号螺钉,然后将加固杆从横杆两端的凹槽中取出,此时定位杆也将离开定位孔,随后再将横杆从环状支撑板顶部取出,便完成对横杆和支撑柱之间的拆卸。
Steel structure scaffold for constructional engineering
The invention discloses a steel structure scaffold for constructional engineering, and relates to the technical field of building auxiliary equipment, the steel structure scaffold comprises a plurality of vertically arranged support columns and a plurality of horizontally arranged cross rods; the supporting columns and the transverse rods are fixed together through connecting pieces. The connecting piece comprises a reinforcing rod, and the reinforcing rod is connected with the supporting column through a first screw. Grooves are formed in the two ends of the transverse rod, and the supporting columns penetrate through the grooves. A plurality of positioning holes are formed in the side wall of the supporting column, a plurality of positioning rods are fixedly connected to the side, close to the supporting column, of the reinforcing rod, and the positioning rods are in sliding fit with the positioning holes; according to the device, when the cross rod is disassembled, only first screws at the two ends of the reinforcing rod need to be screwed out, then the reinforcing rod is taken out of the grooves in the two ends of the cross rod, at the moment, the positioning rod leaves the positioning hole, then the cross rod is taken out of the top of the annular supporting plate, and disassembly of the cross rod and the supporting column is completed.
本发明公开了一种建筑工程用钢构脚手架,涉及建筑辅助设备技术领域,包括多根竖直设置的支撑柱和多根水平设置的横杆;所述支撑柱与横杆之间通过连接件固定在一起;所述连接件包括加固杆,所述加固杆与支撑柱之间通过一号螺钉连接;所述横杆的两端开设有凹槽,所述支撑柱贯穿凹槽;所述支撑柱侧壁开设有多个定位孔,所述加固杆在靠近支撑柱的一侧固接有多个定位杆,所述定位杆与定位孔滑动配合;本发明中,在拆卸横杆时,只需要先拧出加固杆两端的一号螺钉,然后将加固杆从横杆两端的凹槽中取出,此时定位杆也将离开定位孔,随后再将横杆从环状支撑板顶部取出,便完成对横杆和支撑柱之间的拆卸。
Steel structure scaffold for constructional engineering
一种建筑工程用钢构脚手架
LI DONGYUE (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Steel structure scaffold for constructional engineering
Europäisches Patentamt | 2024
|Steel structure scaffold for constructional engineering
Europäisches Patentamt | 2024
|Steel structure scaffold for constructional engineering construction
Europäisches Patentamt | 2021
|