Machine room with prefabricated structure
The embodiment of the invention provides a machine room of a prefabricated structure, and belongs to the technical field of data centers. The machine room of the prefabricated structure comprises a steel structure main frame, the steel structure main frame comprises peripheral steel frame stand columns, peripheral steel frame cross beams and a top roof frame and is used for forming a main body of the machine room, a plurality of steel structure sub-frames are arranged in the steel structure main frame, and a plurality of equipment square bins are defined by the steel structure sub-frames; the square equipment bin is used for placing machine room equipment; the joints between the multiple steel structure sub-frames and the joints between the steel structure sub-frames and the steel structure main frame are in joint design. The steel structure main frame and the plurality of steel structure sub-frames are formed by enclosing prefabricated steel columns and steel beams, and are rigidly and fixedly connected with the ground.
本申请实施例提供了一种预制化结构的机房,属于数据中心技术领域。所述预制化结构的机房包括:钢结构主框架,所述钢结构主框架包括外围钢框架立柱、外围钢框架横梁和顶部屋面框架,用于构成所述机房的主体,所述钢结构主框架内包含多个钢结构子框架,所述多个钢结构子框架围成多个设备方仓,所述设备方仓用于放置机房设备;其中,所述多个钢结构子框架之间、所述钢结构子框架与所述钢结构主框架之间的链接处均为节点设计;所述钢结构主框架和所述多个钢结构子框架均由预制化设计的钢柱和钢梁围合组成,与地面之间均为刚性固定连接。
Machine room with prefabricated structure
The embodiment of the invention provides a machine room of a prefabricated structure, and belongs to the technical field of data centers. The machine room of the prefabricated structure comprises a steel structure main frame, the steel structure main frame comprises peripheral steel frame stand columns, peripheral steel frame cross beams and a top roof frame and is used for forming a main body of the machine room, a plurality of steel structure sub-frames are arranged in the steel structure main frame, and a plurality of equipment square bins are defined by the steel structure sub-frames; the square equipment bin is used for placing machine room equipment; the joints between the multiple steel structure sub-frames and the joints between the steel structure sub-frames and the steel structure main frame are in joint design. The steel structure main frame and the plurality of steel structure sub-frames are formed by enclosing prefabricated steel columns and steel beams, and are rigidly and fixedly connected with the ground.
本申请实施例提供了一种预制化结构的机房,属于数据中心技术领域。所述预制化结构的机房包括:钢结构主框架,所述钢结构主框架包括外围钢框架立柱、外围钢框架横梁和顶部屋面框架,用于构成所述机房的主体,所述钢结构主框架内包含多个钢结构子框架,所述多个钢结构子框架围成多个设备方仓,所述设备方仓用于放置机房设备;其中,所述多个钢结构子框架之间、所述钢结构子框架与所述钢结构主框架之间的链接处均为节点设计;所述钢结构主框架和所述多个钢结构子框架均由预制化设计的钢柱和钢梁围合组成,与地面之间均为刚性固定连接。
Machine room with prefabricated structure
一种预制化结构的机房
WANG YING (Autor:in) / WANG SHIQI (Autor:in) / ZHENG LUBIN (Autor:in) / YANG YANG (Autor:in) / WEI GONGDA (Autor:in) / BAI SHANHU (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
E02D
FOUNDATIONS
,
Gründungen
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
F24F
Klimatisierung
,
AIR-CONDITIONING
/
H05K
PRINTED CIRCUITS
,
Gedruckte Schaltungen
Concrete-prefabricated modular assembly elevator machine room prefabricated by concrete
Europäisches Patentamt | 2021
|