Stone yard arrangement method giving consideration to switch station arrangement
The invention provides a stone yard arrangement method considering switch station arrangement, the stone yard is arranged in a reservoir arrangement area, and the method is characterized in that a stone yard wide riding track is arranged at the elevation of the stone yard higher than a water storage level line, and the width of the wide riding track is matched with the width required by a switch; the riding track is used for arranging a switching station on the riding track after the stone yard is mined; the switching stations are led through the wire outlet holes, the wire outlet holes are formed in the mountain of the stone yard, and the wire outlet holes and the switching stations are arranged on the plane and perpendicularly intersect with each other or intersect with each other at a large angle approximately perpendicular to each other, so that wire outlet arrangement is facilitated. According to the method, the elevation reserved wide riding track connected with the road and the switching station are conveniently arranged above the water storage level, and the problem that the switching station is difficult to select when the pumped storage power station is built in the alpine and valley region is solved; meanwhile, due to the combined arrangement, a large amount of expenses of excavation, slope supporting, water interception and drainage, roads, land expropriation and immigrant and the like can be saved, engineering investment is greatly saved, land resources are saved, and damage to the ecological environment is reduced.
本发明提供了一种兼顾开关站布置的石料场布置方法,所述石料场布置于水库布置区内,其特征在于:在石料场高于蓄水位线的高程,设置石料场宽马道,宽马道的宽度匹布置配开关所需要的宽度,马道在石料场开采完成后用于在其上布置开关站;开关站通过出线洞引线,在石料场山体设置出线洞,出线洞与开关站在平面上,垂直相交或接近垂直的大角度相交,便于出线布置。本发明在蓄水位以上、方便布置连接道路的高程预留宽马道,布置开关站,解决了高山峡谷地区建设抽水蓄能电站时开关站选址困难的问题;同时,二者结合布置,能节省大量的开挖、边坡支护、截排水、道路、征地移民等费用,极大的节约了工程投资,节省了土地资源,减小了对生态环境的破坏。
Stone yard arrangement method giving consideration to switch station arrangement
The invention provides a stone yard arrangement method considering switch station arrangement, the stone yard is arranged in a reservoir arrangement area, and the method is characterized in that a stone yard wide riding track is arranged at the elevation of the stone yard higher than a water storage level line, and the width of the wide riding track is matched with the width required by a switch; the riding track is used for arranging a switching station on the riding track after the stone yard is mined; the switching stations are led through the wire outlet holes, the wire outlet holes are formed in the mountain of the stone yard, and the wire outlet holes and the switching stations are arranged on the plane and perpendicularly intersect with each other or intersect with each other at a large angle approximately perpendicular to each other, so that wire outlet arrangement is facilitated. According to the method, the elevation reserved wide riding track connected with the road and the switching station are conveniently arranged above the water storage level, and the problem that the switching station is difficult to select when the pumped storage power station is built in the alpine and valley region is solved; meanwhile, due to the combined arrangement, a large amount of expenses of excavation, slope supporting, water interception and drainage, roads, land expropriation and immigrant and the like can be saved, engineering investment is greatly saved, land resources are saved, and damage to the ecological environment is reduced.
本发明提供了一种兼顾开关站布置的石料场布置方法,所述石料场布置于水库布置区内,其特征在于:在石料场高于蓄水位线的高程,设置石料场宽马道,宽马道的宽度匹布置配开关所需要的宽度,马道在石料场开采完成后用于在其上布置开关站;开关站通过出线洞引线,在石料场山体设置出线洞,出线洞与开关站在平面上,垂直相交或接近垂直的大角度相交,便于出线布置。本发明在蓄水位以上、方便布置连接道路的高程预留宽马道,布置开关站,解决了高山峡谷地区建设抽水蓄能电站时开关站选址困难的问题;同时,二者结合布置,能节省大量的开挖、边坡支护、截排水、道路、征地移民等费用,极大的节约了工程投资,节省了土地资源,减小了对生态环境的破坏。
Stone yard arrangement method giving consideration to switch station arrangement
一种兼顾开关站布置的石料场布置方法
PU NING (Autor:in) / DU YUNLING (Autor:in) / CHEN YONGHONG (Autor:in) / ZHAO XIANGYANG (Autor:in) / ZHONG WEIBIN (Autor:in) / SUN JINHUI (Autor:in) / SHI FANG (Autor:in) / WANG XIA (Autor:in) / CHEN MING (Autor:in) / QIU WEIZHAO (Autor:in)
09.06.2023
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2025
|Clean water tank and building superposition arrangement method giving consideration to landscape
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|