Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Simulation ceramic tile structure and installation method
The invention discloses a simulation tile structure and a mounting method, the simulation tile structure comprises a longitudinal main keel mounted on a wall body, a horizontal secondary keel fixedly connected with the longitudinal main keel, and a simulation tile arranged in a groove formed by the longitudinal main keel and the horizontal secondary keel in a staggered manner; the simulation ceramic tiles are connected with the protruding clamping grooves in the surfaces of the horizontal secondary keels in a clamped mode. Longitudinal main keels are installed on a wall firstly, then horizontal auxiliary keels are installed to form ceramic tile clamping grooves, ceramic tiles are typeset after the auxiliary keels are installed, then buckle fixing installation is conducted, and a mechanical structure is adopted in the whole installation process. The overall installation mode is simple, the construction speed is high, construction pollution is small, durability is high, environmental adaptability is high, cost is low, and the appearance is attractive.
本发明公开了一种仿真瓷砖结构及安装方法,仿真瓷砖结构包括安装在墙体的纵向主龙骨、与所述纵向主龙骨固接的水平次龙骨以及设置在所述纵向主龙骨与所述水平次龙骨交错形成的凹槽中的仿真瓷砖,所述仿真瓷砖与所述水平次龙骨表面凸起的卡槽卡接。通过在墙体首先安装纵向主龙骨,然后再安装水平次龙骨形成瓷砖卡槽,次龙骨安装完成后对瓷砖进行排版然后进行卡扣固定安装,整个安装过程中全部采用机械结构,整体安装方式简单、施工速度快、施工污染小、耐久性强、环境适应性强、成本低、造型美观。
Simulation ceramic tile structure and installation method
The invention discloses a simulation tile structure and a mounting method, the simulation tile structure comprises a longitudinal main keel mounted on a wall body, a horizontal secondary keel fixedly connected with the longitudinal main keel, and a simulation tile arranged in a groove formed by the longitudinal main keel and the horizontal secondary keel in a staggered manner; the simulation ceramic tiles are connected with the protruding clamping grooves in the surfaces of the horizontal secondary keels in a clamped mode. Longitudinal main keels are installed on a wall firstly, then horizontal auxiliary keels are installed to form ceramic tile clamping grooves, ceramic tiles are typeset after the auxiliary keels are installed, then buckle fixing installation is conducted, and a mechanical structure is adopted in the whole installation process. The overall installation mode is simple, the construction speed is high, construction pollution is small, durability is high, environmental adaptability is high, cost is low, and the appearance is attractive.
本发明公开了一种仿真瓷砖结构及安装方法,仿真瓷砖结构包括安装在墙体的纵向主龙骨、与所述纵向主龙骨固接的水平次龙骨以及设置在所述纵向主龙骨与所述水平次龙骨交错形成的凹槽中的仿真瓷砖,所述仿真瓷砖与所述水平次龙骨表面凸起的卡槽卡接。通过在墙体首先安装纵向主龙骨,然后再安装水平次龙骨形成瓷砖卡槽,次龙骨安装完成后对瓷砖进行排版然后进行卡扣固定安装,整个安装过程中全部采用机械结构,整体安装方式简单、施工速度快、施工污染小、耐久性强、环境适应性强、成本低、造型美观。
Simulation ceramic tile structure and installation method
一种仿真瓷砖结构及安装方法
LIANG SHAOHUA (Autor:in) / ZHANG DINGJUN (Autor:in) / XIE HONGJUN (Autor:in) / GAO FENG (Autor:in)
13.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Large-plate ceramic tile waterproof installation structure and installation method
Europäisches Patentamt | 2020
|Decoration engineering ceramic tile installation auxiliary structure
Europäisches Patentamt | 2022
|