The invention relates to a basement roof deformation joint leakage repairing structure and a repairing method thereof, and relates to the field of sealing technologies for joints, the basement roof deformation joint leakage repairing structure comprises a sealing plate arranged at the top end of a deformation joint and a leaking stoppage layer formed by filling the lower side of the sealing plate with leaking stoppage cement, and a grouting pipe is arranged in the leaking stoppage layer in the length direction of the deformation joint; and the grouting pipe is connected with a grouting nozzle. According to the construction method, the sealing plate is laid from the interior of the basement to the top of the deformation joint, covering soil can be prevented from falling off from the deformation joint in the construction process, then the grouting pipe is fixed to the lower side of the sealing plate through the leaking stoppage cement to form the leaking stoppage layer, the leaking stoppage layer can conduct preliminary leaking stoppage on the deformation joint, and finally grout is injected into the grouting pipe through the grouting nozzle; and gaps of the leaking stoppage layer are filled with slurry, and the leaking stoppage effect is improved.
本申请涉及地库顶板变形缝渗漏修复结构及其修复方法,涉及接缝用的密封技术的领域,其包括设置在变形缝顶端的封板以及通过在所述封板下侧填充堵漏水泥形成的堵漏层,所述堵漏层内沿变形缝的长度方向布置有注浆管,所述注浆管上连接有注浆嘴。本申请通过从地库内部向变形缝的顶部铺设封板,可以预防在施工过程中覆土从变形缝处脱落,然后在封板的下侧用堵漏水泥固定注浆管形成堵漏层,堵漏层可以对变形缝进行初步堵漏,最后再通过注浆嘴向注浆管内注入浆液,通过浆液对堵漏层的缝隙进行填充,提高堵漏效果。
The invention relates to a basement roof deformation joint leakage repairing structure and a repairing method thereof, and relates to the field of sealing technologies for joints, the basement roof deformation joint leakage repairing structure comprises a sealing plate arranged at the top end of a deformation joint and a leaking stoppage layer formed by filling the lower side of the sealing plate with leaking stoppage cement, and a grouting pipe is arranged in the leaking stoppage layer in the length direction of the deformation joint; and the grouting pipe is connected with a grouting nozzle. According to the construction method, the sealing plate is laid from the interior of the basement to the top of the deformation joint, covering soil can be prevented from falling off from the deformation joint in the construction process, then the grouting pipe is fixed to the lower side of the sealing plate through the leaking stoppage cement to form the leaking stoppage layer, the leaking stoppage layer can conduct preliminary leaking stoppage on the deformation joint, and finally grout is injected into the grouting pipe through the grouting nozzle; and gaps of the leaking stoppage layer are filled with slurry, and the leaking stoppage effect is improved.
本申请涉及地库顶板变形缝渗漏修复结构及其修复方法,涉及接缝用的密封技术的领域,其包括设置在变形缝顶端的封板以及通过在所述封板下侧填充堵漏水泥形成的堵漏层,所述堵漏层内沿变形缝的长度方向布置有注浆管,所述注浆管上连接有注浆嘴。本申请通过从地库内部向变形缝的顶部铺设封板,可以预防在施工过程中覆土从变形缝处脱落,然后在封板的下侧用堵漏水泥固定注浆管形成堵漏层,堵漏层可以对变形缝进行初步堵漏,最后再通过注浆嘴向注浆管内注入浆液,通过浆液对堵漏层的缝隙进行填充,提高堵漏效果。
Basement roof deformation joint leakage repairing structure and repairing method thereof
地库顶板变形缝渗漏修复结构及其修复方法
LI GUOZHU (Autor:in)
23.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Basement water leakage repairing structure and repairing method thereof
Europäisches Patentamt | 2024
|Basement roof crack repairing method and repairing structure
Europäisches Patentamt | 2021
|Basement settlement joint waterproof structure leakage repairing method
Europäisches Patentamt | 2024
|