Nuclear power station hyperboloid in-situ installation construction method free of form removal
The invention belongs to the technical field of hoisting, and discloses a nuclear power station hyperboloid in-situ installation construction method free of formwork removal. According to the method, overall calculation is carried out on the free-form-removal through finite element software, a calculation result of the free-form-removal is obtained, and the free-form-removal comprises a plurality of free-form-removal blocks; hoisting each formwork-removal-free sub-block according to a calculation result; the method comprises the following steps of: hoisting and splicing each non-form-stripping sub-block, after the hoisting of each non-form-stripping sub-block is completed, splicing each non-form-stripping sub-block, dismantling a supporting system after the splicing is completed, completing the construction, carrying out overall calculation on the non-form-stripping to obtain a mounting mode of the non-form-stripping and each sub-block of the non-form-stripping, hoisting and splicing each non-form-stripping sub-block, and dismantling the supporting system after the construction is completed. Compared with an assembling method of a wood formwork, the bearing capacity of the formwork-removal-free formwork is greatly improved, the precision of the formwork can be guaranteed, the requirement for a supporting system can be lowered to a great extent on the premise that the construction quality is guaranteed, the time spent on dismantling the supporting system is saved, and then the construction efficiency is improved.
本发明属于吊装技术领域,公开了一种核电站双曲面免拆模原位安装施工方法。本发明通过有限元软件对免拆模进行整体演算,得到免拆模的演算结果,免拆模包括若干个免拆模分块;根据演算结果吊装各个免拆模分块;在各个免拆模分块吊装完成后,将各个免拆模分块进行拼装,在拼装完成后,拆除支撑体系,完成施工,根据对免拆模进行整体演算得到免拆模的安装方式以及免拆模的各个分块,再将各个免拆模分块进行吊装拼接,在完成后拆除支撑体系,相对木模板的拼装方法,本发明的免拆模的承载力大大提高,并能够保证模板的精度,能够在保证施工质量的前提下很大程度上降低对支撑体系的需求,节省在拆除支撑体系上的时间花费,进而提高施工效率。
Nuclear power station hyperboloid in-situ installation construction method free of form removal
The invention belongs to the technical field of hoisting, and discloses a nuclear power station hyperboloid in-situ installation construction method free of formwork removal. According to the method, overall calculation is carried out on the free-form-removal through finite element software, a calculation result of the free-form-removal is obtained, and the free-form-removal comprises a plurality of free-form-removal blocks; hoisting each formwork-removal-free sub-block according to a calculation result; the method comprises the following steps of: hoisting and splicing each non-form-stripping sub-block, after the hoisting of each non-form-stripping sub-block is completed, splicing each non-form-stripping sub-block, dismantling a supporting system after the splicing is completed, completing the construction, carrying out overall calculation on the non-form-stripping to obtain a mounting mode of the non-form-stripping and each sub-block of the non-form-stripping, hoisting and splicing each non-form-stripping sub-block, and dismantling the supporting system after the construction is completed. Compared with an assembling method of a wood formwork, the bearing capacity of the formwork-removal-free formwork is greatly improved, the precision of the formwork can be guaranteed, the requirement for a supporting system can be lowered to a great extent on the premise that the construction quality is guaranteed, the time spent on dismantling the supporting system is saved, and then the construction efficiency is improved.
本发明属于吊装技术领域,公开了一种核电站双曲面免拆模原位安装施工方法。本发明通过有限元软件对免拆模进行整体演算,得到免拆模的演算结果,免拆模包括若干个免拆模分块;根据演算结果吊装各个免拆模分块;在各个免拆模分块吊装完成后,将各个免拆模分块进行拼装,在拼装完成后,拆除支撑体系,完成施工,根据对免拆模进行整体演算得到免拆模的安装方式以及免拆模的各个分块,再将各个免拆模分块进行吊装拼接,在完成后拆除支撑体系,相对木模板的拼装方法,本发明的免拆模的承载力大大提高,并能够保证模板的精度,能够在保证施工质量的前提下很大程度上降低对支撑体系的需求,节省在拆除支撑体系上的时间花费,进而提高施工效率。
Nuclear power station hyperboloid in-situ installation construction method free of form removal
核电站双曲面免拆模原位安装施工方法
LEE GOO (Autor:in) / LIU JUN (Autor:in) / WANG YUXIONG (Autor:in) / LIU KANG (Autor:in)
23.06.2023
Patent
Elektronische Ressource
Chinesisch
Special-shaped hyperboloid structure formwork system and construction method thereof
Europäisches Patentamt | 2023
|Hyperboloid Modules for Deployable Structures
Springer Verlag | 2020
|Hyperboloid strut base frame and building device for hyperboloid strut base frame
Europäisches Patentamt | 2024
|Construction method of hyperboloid zigzag building edge super high-rise curtain wall
Europäisches Patentamt | 2023
|