Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Dry-connection prefabricated steel-concrete composite shear wall
The invention discloses a dry-type connection prefabricated steel-concrete composite shear wall which comprises a plurality of wallboard units and connecting joints on the two sides of the wallboard units, each wallboard unit comprises a wallboard body, channel steel and a connecting beam, the two sides and the bottom side of each wallboard body are wrapped with the channel steel, the connecting beams are arranged on the upper sides of the wallboard bodies, and the connecting joints are arranged on the lower sides of the wallboard bodies. The connecting beams achieve vertical connection of the wallboard units, the connecting joints are welded to the wallboard units, and connection of the wallboard units in the horizontal direction is achieved. The technical problems that a steel tube bundle shear wall is large in steel consumption, complex in construction and large in welding workload, and steel rust prevention needs to be conducted on the surface are solved, the building cost is reduced, the construction period is shortened, the construction labor intensity is reduced, and the advantages of being convenient to construct, reliable in connection, good in toughness, high in fault-tolerant capacity and the like are achieved.
本发明公开一种干式连接的预制钢‑混凝土组合剪力墙,包括若干墙板单元和墙板单元两侧边的连接节点,所述的墙板单元包括墙板本体、槽钢、连接梁,所述墙板本体两侧边和底边外包有槽钢,上边设有连接梁,所述连接梁实现墙板单元上下之间的连接,连接节点与墙板单元焊接,实现墙板单元水平方向的连接。本发明解决了钢管束剪力墙其用钢量大,施工繁琐,焊接工作量大且表面需进行钢材防锈蚀的技术问题,减少建筑成本,缩短工期,降低施工劳动强度,具有施工方便、连接可靠、韧性好、容错能力强等优点。
Dry-connection prefabricated steel-concrete composite shear wall
The invention discloses a dry-type connection prefabricated steel-concrete composite shear wall which comprises a plurality of wallboard units and connecting joints on the two sides of the wallboard units, each wallboard unit comprises a wallboard body, channel steel and a connecting beam, the two sides and the bottom side of each wallboard body are wrapped with the channel steel, the connecting beams are arranged on the upper sides of the wallboard bodies, and the connecting joints are arranged on the lower sides of the wallboard bodies. The connecting beams achieve vertical connection of the wallboard units, the connecting joints are welded to the wallboard units, and connection of the wallboard units in the horizontal direction is achieved. The technical problems that a steel tube bundle shear wall is large in steel consumption, complex in construction and large in welding workload, and steel rust prevention needs to be conducted on the surface are solved, the building cost is reduced, the construction period is shortened, the construction labor intensity is reduced, and the advantages of being convenient to construct, reliable in connection, good in toughness, high in fault-tolerant capacity and the like are achieved.
本发明公开一种干式连接的预制钢‑混凝土组合剪力墙,包括若干墙板单元和墙板单元两侧边的连接节点,所述的墙板单元包括墙板本体、槽钢、连接梁,所述墙板本体两侧边和底边外包有槽钢,上边设有连接梁,所述连接梁实现墙板单元上下之间的连接,连接节点与墙板单元焊接,实现墙板单元水平方向的连接。本发明解决了钢管束剪力墙其用钢量大,施工繁琐,焊接工作量大且表面需进行钢材防锈蚀的技术问题,减少建筑成本,缩短工期,降低施工劳动强度,具有施工方便、连接可靠、韧性好、容错能力强等优点。
Dry-connection prefabricated steel-concrete composite shear wall
一种干式连接的预制钢-混凝土组合剪力墙
DOU LIJUN (Autor:in) / HUANG ZIHENG (Autor:in) / ZHAI CHUNXU (Autor:in) / TIAN ZIQIANG (Autor:in) / LUO AOGUO (Autor:in) / HU XIAOYU (Autor:in) / CHENG YONGSHUANG (Autor:in) / WANG BAIHAN (Autor:in) / LIU SIHAN (Autor:in) / PENG SIFAN (Autor:in)
30.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Prefabricated concrete composite shear wall based on PBL connection
Europäisches Patentamt | 2021
|Prefabricated lattice type steel-reinforced concrete composite shear wall
Europäisches Patentamt | 2022
|Prefabricated concrete shear wall based on PBL connection
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2015
|Novel prefabricated steel reinforced concrete L-shaped composite shear wall structure
Europäisches Patentamt | 2022
|