The invention discloses a fence stand column construction method which comprises the following steps: completing pouring of a stand column foundation on a construction site, pre-pouring and fixing a plurality of upward connecting steel bars on the stand column foundation, standing a prefabricated stand column prefabricated part with a hollow structure on the foundation, and sleeving the exposed connecting steel bars with the prefabricated stand column prefabricated part; a post-cast section is cast in an inner cavity of the lower portion of the stand column prefabricated part in situ, so that the post-cast section and the stand column foundation are fixedly connected into a whole through the connecting steel bars, and the stand column prefabricated part is obtained by splicing a plurality of stand column barrels in the length direction and then pouring concrete into pouring connecting space interlayers on the peripheral sides of the stand column barrels to be fixedly connected into a whole. The method has the advantages that the machining difficulty can be reduced, the production and machining efficiency can be improved, and the product appearance quality requirement can be better met.
本发明公开了一种围墙立柱施工方法,在施工现场完成立柱地基的浇筑,立柱地基上预浇筑固定数根向上的连接钢筋,然后将预制的空心结构的立柱预制件立于地基之上并套在露出的连接钢筋之外,再在立柱预制件下部内腔现浇一段后浇段,使得后浇段通过连接钢筋和立柱地基固连为一体,其特征在于,所述立柱预制件为多个立柱筒体顺长度方向拼接后,在立柱筒体周侧位置的浇筑连接空间夹层内浇筑混凝土固连为一体得到。本发明具有能够降低加工难度,提高生产加工效率并能够更好地保证产品外形质量要求的优点。
The invention discloses a fence stand column construction method which comprises the following steps: completing pouring of a stand column foundation on a construction site, pre-pouring and fixing a plurality of upward connecting steel bars on the stand column foundation, standing a prefabricated stand column prefabricated part with a hollow structure on the foundation, and sleeving the exposed connecting steel bars with the prefabricated stand column prefabricated part; a post-cast section is cast in an inner cavity of the lower portion of the stand column prefabricated part in situ, so that the post-cast section and the stand column foundation are fixedly connected into a whole through the connecting steel bars, and the stand column prefabricated part is obtained by splicing a plurality of stand column barrels in the length direction and then pouring concrete into pouring connecting space interlayers on the peripheral sides of the stand column barrels to be fixedly connected into a whole. The method has the advantages that the machining difficulty can be reduced, the production and machining efficiency can be improved, and the product appearance quality requirement can be better met.
本发明公开了一种围墙立柱施工方法,在施工现场完成立柱地基的浇筑,立柱地基上预浇筑固定数根向上的连接钢筋,然后将预制的空心结构的立柱预制件立于地基之上并套在露出的连接钢筋之外,再在立柱预制件下部内腔现浇一段后浇段,使得后浇段通过连接钢筋和立柱地基固连为一体,其特征在于,所述立柱预制件为多个立柱筒体顺长度方向拼接后,在立柱筒体周侧位置的浇筑连接空间夹层内浇筑混凝土固连为一体得到。本发明具有能够降低加工难度,提高生产加工效率并能够更好地保证产品外形质量要求的优点。
Enclosing wall stand column construction method
一种围墙立柱施工方法
YANG HAO (Autor:in)
30.06.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2022
|