Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Flower vase type pier body reinforcing steel bar integral binding structure
The invention relates to the field of bridges, and particularly discloses a vase type pier body reinforcing steel bar integral binding structure which comprises a first framework and a second framework connected with the first framework, and the first framework and the second framework are both formed by binding a plurality of stirrups and a plurality of main reinforcements. A main rib of the first framework is fixedly connected with a threaded rod, a main rib of the second framework is fixedly connected with a fixing rod, a threaded sleeve is arranged outside the fixing rod in a sliding mode, the threaded sleeve is in threaded connection with the threaded rod, and a clamping assembly is arranged between the fixing rod and the threaded sleeve. The fixing rod is inserted into the fixing block, the bolt sequentially penetrates through the fixing block and the fixing rod and then is in threaded connection with the nut, the fixing rod abuts against the end of the threaded rod, the clamping ring abuts against the abutting ring, and under the action of mutual dragging between the clamping ring and the abutting ring and threaded connection between the threaded sleeve and the threaded rod, the threaded sleeve and the threaded rod can be clamped. Therefore, the effect of fixedly connecting the first framework and the second framework is achieved.
本申请涉及桥梁领域,具体公开了一种花瓶式桥墩墩身钢筋整体绑扎结构,其包括第一骨架以及与所述第一骨架连接的第二骨架,所述第一骨架以及所述第二骨架均由多个箍筋以及多个主筋绑扎而成,所述第一骨架的主筋固定连接有螺纹杆,所述第二骨架的主筋固定连接有固定杆,所述固定杆外套设滑移有螺纹套,所述螺纹套与所述螺纹杆螺纹连接,所述固定杆与所述螺纹套之间设置有卡接组件。将固定杆插接于固定块内,螺栓依次穿过固定块以及固定杆后与螺帽螺纹连接,将固定杆与螺纹杆端部抵接,卡接环与抵接环抵接,在卡接环与抵接环之间相互牵扯,以及螺纹套与螺纹杆之间螺纹连接的作用下,进而完成第一骨架以及第二骨架之间固定连接的效果。
Flower vase type pier body reinforcing steel bar integral binding structure
The invention relates to the field of bridges, and particularly discloses a vase type pier body reinforcing steel bar integral binding structure which comprises a first framework and a second framework connected with the first framework, and the first framework and the second framework are both formed by binding a plurality of stirrups and a plurality of main reinforcements. A main rib of the first framework is fixedly connected with a threaded rod, a main rib of the second framework is fixedly connected with a fixing rod, a threaded sleeve is arranged outside the fixing rod in a sliding mode, the threaded sleeve is in threaded connection with the threaded rod, and a clamping assembly is arranged between the fixing rod and the threaded sleeve. The fixing rod is inserted into the fixing block, the bolt sequentially penetrates through the fixing block and the fixing rod and then is in threaded connection with the nut, the fixing rod abuts against the end of the threaded rod, the clamping ring abuts against the abutting ring, and under the action of mutual dragging between the clamping ring and the abutting ring and threaded connection between the threaded sleeve and the threaded rod, the threaded sleeve and the threaded rod can be clamped. Therefore, the effect of fixedly connecting the first framework and the second framework is achieved.
本申请涉及桥梁领域,具体公开了一种花瓶式桥墩墩身钢筋整体绑扎结构,其包括第一骨架以及与所述第一骨架连接的第二骨架,所述第一骨架以及所述第二骨架均由多个箍筋以及多个主筋绑扎而成,所述第一骨架的主筋固定连接有螺纹杆,所述第二骨架的主筋固定连接有固定杆,所述固定杆外套设滑移有螺纹套,所述螺纹套与所述螺纹杆螺纹连接,所述固定杆与所述螺纹套之间设置有卡接组件。将固定杆插接于固定块内,螺栓依次穿过固定块以及固定杆后与螺帽螺纹连接,将固定杆与螺纹杆端部抵接,卡接环与抵接环抵接,在卡接环与抵接环之间相互牵扯,以及螺纹套与螺纹杆之间螺纹连接的作用下,进而完成第一骨架以及第二骨架之间固定连接的效果。
Flower vase type pier body reinforcing steel bar integral binding structure
一种花瓶式桥墩墩身钢筋整体绑扎结构
ZHAO JUNTAO (Autor:in) / LI XIAOHAN (Autor:in) / WEI JINGDONG (Autor:in) / YAN KE (Autor:in) / GONG JIN (Autor:in) / WANG XUYANG (Autor:in) / MA YUE (Autor:in) / LIU JIE (Autor:in) / DI XIN (Autor:in) / WANG HAN (Autor:in)
04.07.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Flower vase pier ball steel support embedded bolt framework and construction method
Europäisches Patentamt | 2022
|Bridge vase pier steel formwork fixing construction method
Europäisches Patentamt | 2024
|